← Back
Two stories - detached, small or mid-size
219 WHITMAN DRIVE
BROOKLYN · BIN 3243020
💬 Discuss this project
1960Year Built
2Stories
A1Building Class
R2Zoning
2,506 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,800 sf lot · 0.66 FAR built · Flood zone VE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR105/15/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ISLAND ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281105/15/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
04/24/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 24 Panels, 9.84 kW
B01051665-I1
05/17/2024
Permit issued — Solar
B01051665-I1-SL
05/15/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 24 Panels, 9.84 kW
B01051665-I1
05/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
05/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
05/15/2024
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
05/15/2024
Special inspection requirement — Final
Mina Makar
05/15/2024
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR05/17/2024
BISOTISSUEDKANFER GEN'L CONTRACTING INC.06/10/1994
1 project · most recent 05/15/2024
FiledStatusContractorScope
05/15/2024CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/15/2024Fire-Resistant Penetrations and JointsMina Makarspecial
05/15/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
05/15/2024Energy Code Compliance InspectionsMina Makarprogress
05/15/2024FinalMina Makarprogress
05/15/2024Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/25/2026B01051665-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026B01051665-I1Open ↗
09/02/2026B01051665-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/25/2026B01051665-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026B01051665-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/25/2026B01051665-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01051665-I1Open ↗