← Back
Two family brick
219 WYCKOFF STREET
BROOKLYN · BIN 3005953
💬 Discuss this project
1871Year Built
2Stories
B1Building Class
R6BZoning
1,905 sfGross Floor Area
2Units
Two family brick · 1,667 sf lot · 1.14 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 18 docs
Cellar1p · 1 filing · 18 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/16/2021$2.0M—— → —$1,049/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KIT MIDDLETON ARCHITECT P.C.310/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KIT MIDDLETON ARCHITECT P C603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C.S. SCOTT ENTERPRISESGeneral Contractor303/21/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN SPECIAL ENGINEERING2018210/07/2022
Building Lifecycle
All (27)Filed (3)Permit Issued (2)Signed Off (2)Inspection (4)Special Inspection (16)
04/13/2023
Signed off — Alteration
THIS APPLICATION IS FILED FOR DEMOLITION OF AN EXISTING SINGLE STORY REAR YARD ADDITION AND PORCH. THE CONSTRUCTION OF A NEW EXTERIOR DECK AND STAIRS, INTERIOR PARTITIONS AND RENOVATION OF AN EXISTING BATHROOMS AND KITCHEN. INSTALL NEW HVAC / AIR HANDLERS
B00614988-I1
01/18/2023
Signed off — Alteration
REPLACE (1)WC, (1)LAV, (1)SHOWER AT BASEMENT. INSTALLATION OF NEW (1)FD, (1)SINK-RES AT BASEMENT; (1)FD ON 1ST FL; (1)SHOWER, (1)FD AND (1)WASHER ON THE 2ND FL. RELOCATE (1)WC, (1)LAV ON THE 2ND FL. REMOVE (1)TUB ON THE 2ND FL.
B00608740-I1
10/11/2022
Special inspection requirement — Masonry
William Ryan
10/11/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Ryan
10/11/2022
Special inspection requirement — Structural Steel - Details
William Ryan
10/11/2022
Special inspection requirement — Mechanical Systems
William Ryan
10/11/2022
Special inspection requirement — Structural Cold-Formed Steel
William Ryan
10/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
10/11/2022
Special inspection requirement — Final
Christopher Middleton
10/11/2022
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Middleton
10/11/2022
Special inspection requirement — Lighting in dwelling units
Christopher Middleton
10/11/2022
Special inspection requirement — Fenestration air leakage
Christopher Middleton
10/11/2022
Special inspection requirement — Fenestration areas
Christopher Middleton
10/11/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Christopher Middleton
10/11/2022
Special inspection requirement — Maintenance information
Christopher Middleton
10/11/2022
Special inspection requirement — Air barrier - visual inspection
Christopher Middleton
10/11/2022
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Middleton
10/11/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Middleton
10/07/2022
Filed — Alteration
THIS APPLICATION IS FILED FOR DEMOLITION OF AN EXISTING SINGLE STORY REAR YARD ADDITION AND PORCH. THE CONSTRUCTION OF A NEW EXTERIOR DECK AND STAIRS, INTERIOR PARTITIONS AND RENOVATION OF AN EXISTING BATHROOMS AND KITCHEN. INSTALL NEW HVAC / AIR HANDLERS
B00614988-P1
09/30/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/07/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/06/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/30/2022
Permit issued — Plumbing
B00608740-I1-PL
03/25/2022
Permit issued — Structural
B00614988-I1-GC-CX
01/13/2022
Filed — Alteration
THIS APPLICATION IS FILED FOR DEMOLITION OF AN EXISTING SINGLE STORY REAR YARD ADDITION AND PORCH. THE CONSTRUCTION OF A NEW EXTERIOR DECK AND STAIRS, INTERIOR PARTITIONS AND RENOVATION OF AN EXISTING BATHROOMS AND KITCHEN. INSTALL NEW HVAC / AIR HANDLERS
B00614988-I1
01/13/2022
Filed — Alteration
REPLACE (1)WC, (1)LAV, (1)SHOWER AT BASEMENT. INSTALLATION OF NEW (1)FD, (1)SINK-RES AT BASEMENT; (1)FD ON 1ST FL; (1)SHOWER, (1)FD AND (1)WASHER ON THE 2ND FL. RELOCATE (1)WC, (1)LAV ON THE 2ND FL. REMOVE (1)TUB ON THE 2ND FL.
B00608740-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC06/30/2022
DOB NOWStructuralSigned-offC.S. SCOTT ENTERPRISES03/25/2022
1 project · most recent 09/16/2021
General Wiring
FiledStatusContractorScope
09/16/2021Permit IssuedNAIR ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/30/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/06/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
10/11/2022MasonryWilliam Ryanspecial
10/11/2022Structural Stability – Alterations of existing buildingsWilliam Ryanspecial
10/11/2022Structural Steel - DetailsWilliam Ryanspecial
10/11/2022Mechanical SystemsWilliam Ryanspecial
10/11/2022Structural Cold-Formed SteelWilliam Ryanspecial
10/11/2022Fire-Resistant Penetrations and JointsWilliam Ryanspecial
10/11/2022FinalChristopher Middletonprogress
10/11/2022HVAC-R and service water heating equipmentChristopher Middletonenergy_progress
10/11/2022Lighting in dwelling unitsChristopher Middletonenergy_progress
10/11/2022Fenestration air leakageChristopher Middletonenergy_progress
10/11/2022Fenestration areasChristopher Middletonenergy_progress
10/11/2022Fenestration and door U-factor and product ratingsChristopher Middletonenergy_progress
10/11/2022Maintenance informationChristopher Middletonenergy_progress
10/11/2022Air barrier - visual inspectionChristopher Middletonenergy_progress
10/11/2022HVAC-R and service water heating system controlsChristopher Middletonenergy_progress
10/11/2022HVAC-R and service water piping design and insulationChristopher Middletonenergy_progress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/31/2026B00614988-I1Request digital key ↗
08/31/2026B00614988-P1Request digital key ↗
08/31/2026B00608740-I1Request digital key ↗
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit3
08/31/2026B00608740-I1Open ↗
08/13/2026B00614988-P1Open ↗
08/13/2026B00614988-I1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWSpecial Inspector Seal & Signature7
08/24/2026B00614988-I1Open ↗
08/24/2026B00614988-I1Open ↗
08/24/2026B00614988-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/31/2026B00614988-P1Open ↗
08/31/2026B00614988-I1Open ↗
08/31/2026B00608740-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026B00614988-I1Open ↗
08/24/2026B00614988-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/31/2026B00614988-I1Open ↗
08/31/2026B00614988-P1Open ↗
08/31/2026B00608740-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00614988-I1Open ↗