Public elementary, junior or senior high
The Angelo Patri Middle School
2190 FOLIN STREET · BIN 2013307
💬 Discuss this project
1975Year Built
6Stories
W1Building Class
C8-3Zoning
189,000 sfGross Floor Area
1Units
LL97 Covered25 Open Violations 4 unresolved · 21 paperwork only ▸
Public elementary, junior or senior high · 88,360 sf lot · 2.14 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction18p · 1 filing · 20 docs
Floor 5Under Construction21p · 1 filing · 20 docs
Floor 4
Floor 3
Floor 2
Floor 1
Cellar2p · 1 filing · 10 docs
1 job · most recent 05/27/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/27/2026Permit IssuedNEW YORK INT'L BUILDERS *Air Conditioning Systems
Cooling
Mitsubishi Electric SUZ-KA09NA 317 CFM · Condensing Unit ×1
3 jobs · most recent 08/05/2026
Water/Sanitary Storm
FiledStatusContractorScope
08/05/2026——Storm
05/27/2026Permit IssuedA&H EXPRESS PLBG&HTG CORPWater/Sanitary
04/23/2024——Water/Sanitary
25 jobs · most recent 01/23/2026
General Wiring
FiledStatusContractorScope
01/23/2026CompleteANCO ELECTL CONTCTNG INC—
08/14/2025Permit IssuedAUJLA ELECTRIC CORPGeneral Wiring
05/29/2025CompleteANCO ELECTL CONTCTNG INC—
05/21/2025CompleteURBAN ELECTRICAL CORPGeneral Wiring
10/10/2024CompleteLB ELECTRIC CO.-NORTH LLCGeneral Wiring
04/22/2024Permit IssuedJ&H ELECTRICAL CONT INCGeneral Wiring
04/21/2024CompleteEVS ELECTRIC CORPGeneral Wiring
09/18/2023CompleteANCO ELECTL CONTCTNG INC—
06/15/2023CompleteE-J ELEC. INSTALLATION COGeneral Wiring
02/21/2023CompleteGEMINI ELECTRIC CO., INC.—
01/19/2023CompleteGEMINI ELECTRIC CO., INC.—
08/12/2022CompleteCHARAN ELEC'L ENTERP'S IN—
07/22/2022Permit IssuedA TECH ELEC ENTERPRISESGeneral Wiring
04/20/2022Permit IssuedP.S. MARCATO ELEV. CO INC—
09/08/2021CompleteCHARAN ELEC'L ENTERP'S IN—
2 jobs · most recent 08/05/2026
FiledStatusContractorScope
08/05/2026——2 scope_items
08/05/2026——2 scope_items
1 job · most recent 06/03/2026
Fence
FiledStatusContractorScope
06/03/2026Permit IssuedB & R CONSTRUCTION SERVICFence
Building Lifecycle
All (139)Filed (21)Permit Issued (6)Violation (60)Objection (22)Special Inspection (30)
08/25/2026
Permit issued — General Construction
X00955189-I1-GC
08/10/2026
Objection raised — Other
08/06/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
08/06/2026
Special inspection requirement — Masonry
GEORGE GHEBRYAL
08/06/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
08/06/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
08/06/2026
Special inspection requirement — Concrete - Precast
GEORGE GHEBRYAL
08/06/2026
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
08/05/2026
Filed — Alteration
X137; EXCAVATION AND SHORING DURING FALGPOLE INSTALLATION INCONJUNCTION WITH DOB # X01032222 AND X00979877. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01440780-I1
08/05/2026
Filed — Alteration
TEMPORARY EGRESS PLAN
X00979877-P4
08/04/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
07/28/2026
Permit issued — Construction Fence
X01410012-I1-FN
07/17/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
07/17/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
07/17/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
07/17/2026
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
07/17/2026
Special inspection requirement — Masonry
GEORGE GHEBRYAL
07/17/2026
Special inspection requirement — Concrete - Precast
GEORGE GHEBRYAL
06/29/2026
Special inspection requirement — Post-installed Anchors
06/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JAMES WILSON
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
06/19/2026
Objection resolved — Addressed
06/19/2026
Special inspection requirement — Post-installed Anchors
06/03/2026
Filed — Alteration
X137, INSTALLATION OF +/- 968 LINEAR FEET OF CHAIN LINK FENCE DURING THE PLAYGROUND RENOVATION IN CONJUNCTION WITH DOB # X01032222 AND X00979877. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01410012-I1
06/01/2026
Objection raised — Other
05/27/2026
Filed — Alteration
REMOVAL OF EXISTING PLUMBING FIXTURES AND ITS SUBSEQUENT PIPES, FITTINGS AND VALVES LOCATED IN EXISTING FIFTH FLOOR STUDIO BATHROOM. INSTALL NEW PLUMBING FIXTURES AS SHOWN ON DRAWINGS.
X00955189-P1
05/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JAMES WILSON
05/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/14/2025
Violation issued (ECB, open)
Construction
10/14/2025
Violation issued (ECB, open)
Construction
10/14/2025
Violation issued (ECB, closed)
Construction
10/07/2025
Permit issued — General Construction
X00955189-I1-GC
08/19/2025
Permit issued — Mechanical Systems
X00955189-S1-MS
08/12/2025
Permit issued — Plumbing
X00955189-S2-PL
07/22/2025
Permit issued — General Construction
X00955189-I1-GC
09/20/2024
Violation issued (ECB, open)
Construction
09/20/2024
Violation issued (ECB, open)
Construction
09/20/2024
Violation issued (ECB, closed)
Construction
06/03/2024
Objection resolved — Addressed
05/22/2024
Objection resolved — Addressed
05/17/2024
Objection raised — Other
05/07/2024
Filed — Alteration
TEMPORARY EGRESS PLAN
X00979877-P1
05/07/2024
Filed — Alteration
TEMPORARY EGRESS PLAN
X00979877-P3
05/07/2024
Filed — Alteration
TEMPORARY EGRESS PLAN
X00979877-P2
05/06/2024
Special inspection requirement — Concrete - Precast
05/06/2024
Special inspection requirement — Masonry
05/06/2024
Special inspection requirement — Subgrade Inspections
05/06/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
05/06/2024
Special inspection requirement — Final
05/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/06/2024
Special inspection requirement — Final
05/06/2024
Special inspection requirement — Concrete - Precast
05/06/2024
Special inspection requirement — Concrete - Cast-In-Place
05/03/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/02/2024
Objection raised — Other
05/02/2024
Objection raised — Other
Latest 60 of 139 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEPARTMENT OF EDUCATION503/22/2026
DOE IS 391 UDC603/22/2026
DEPT OF EDUCATION I.S. 39203/22/2026
DOE 040403/22/2026
IS 391 DOE1403/22/2026
DOE IS 391 040403/22/2026
D.O.E. I.S.391 0403/22/2026
DEPARTMENT OF EDUCATION 0103/22/2026
I.S. 391(UDC) DEPARTMENT203/22/2026
I.S. 391 (UDC)103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PRECISION 3SIXTY NYC, INC803/21/2026
SEMMENS ASSOCIATE P C203/21/2026
EME CONSULTING ENGINEERING GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AIR-TEK MECHANICAL INCGeneral Contractor303/21/2026
NEW YORK INT'L BUILDERS *General Contractor308/26/2026
CHARAN ELEC'L ENTERP'S INElectrical203/22/2026
DEREK MOHANElectrical203/21/2026
SMITH, STEPHENElectrical103/21/2026
TUCKERMAN, LElectrical103/21/2026
WILLIE THROWER, JR.Electrical103/21/2026
B & R CONSTRUCTION SERVICGeneral Contractor107/29/2026
BETANCOURT, JOHNElectrical103/21/2026
A&H EXPRESS PLBG&HTG CORPPlumbing106/28/2026
FLORES, KELVINElectrical103/21/2026
JOHNSEN, WARRENElectrical103/21/2026
LORD, JOHNElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106908/05/2026
MP ENGINEERS & ARCHITECTS1438111/01/2023
JPC LOGISTICS DBA JPCL EN351205/04/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNEW YORK INT'L BUILDERS *08/25/2026
DOB NOWConstruction FencePermit IssuedB & R CONSTRUCTION SERVIC07/28/2026
DOB NOWGeneral ConstructionPermit IssuedNEW YORK INT'L BUILDERS *10/07/2025
DOB NOWMechanical SystemsPermit IssuedAIR-TEK MECHANICAL INC08/19/2025
DOB NOWPlumbingPermit IssuedA&H EXPRESS PLBG&HTG CORP08/12/2025
DOB NOWGeneral ConstructionPermit IssuedNEW YORK INT'L BUILDERS *07/22/2025
BISMHISSUEDNAMRON, INC12/20/2023
BISBLISSUEDV. C. VITANZA SONS INC01/27/2022
BISPLISSUEDV. C. VITANZA SONS INC06/30/2021
BISBLISSUEDV. C. VITANZA SONS INC04/23/2021
BISBLISSUEDV. C. VITANZA SONS INC07/27/2020
BISPLISSUEDV. C. VITANZA SONS INC07/27/2020
BISOTISSUEDR.A.M.S. MECHANICAL INC05/26/2020
BISMHISSUEDR.A.M.S. MECHANICAL INC05/22/2020
BISOTISSUEDIMPERIUM CONSTRUCTION INC.11/21/2019
BISOTISSUEDIMPERIUM CONSTRUCTION INC.11/21/2019
BISOTISSUEDIMPERIUM CONSTRUCTION INC.11/21/2019
BISOTISSUEDIMPERIUM CONSTRUCTION INC.11/21/2019
BISMHISSUEDCHAPMAN & EVANS INC07/10/2019
BISPLISSUEDV. C. VITANZA SONS INC04/04/2019
BISFBISSUEDV. C. VITANZA SONS INC04/04/2019
BISPLISSUEDFORSYTHE P&H CORP04/01/2019
BISOTISSUEDIMPERIUM CONSTRUCTION INC.10/15/2018
BISOTISSUEDIMPERIUM CONSTRUCTION INC.10/15/2018
BISOTISSUEDIMPERIUM CONSTRUCTION INC.04/05/2018
BISOTISSUEDIMPERIUM CONSTRUCTION INC.04/05/2018
BISPLISSUEDFORSYTHE P&H CORP04/05/2018
BISOTISSUEDIMPERIUM CONSTRUCTION INC.04/05/2018
BISOTISSUEDIMPERIUM CONSTRUCTION INC.04/05/2018
BISEQISSUEDIMPERIUM CONSTRUCTION INC.04/04/2018
BISOTISSUEDR.A.M.S. MECHANICAL INC03/06/2018
BISMHISSUEDR.A.M.S. MECHANICAL INC03/06/2018
BISMHISSUEDACS SYSTEM ASSOCIATES INC.03/27/2017
BISOTISSUEDR.A.M.S. MECHANICAL INC03/09/2017
BISOTISSUEDR.A.M.S. MECHANICAL INC03/09/2017
BISMHISSUEDR.A.M.S. MECHANICAL INC03/06/2017
BISMHISSUEDACS SYSTEM ASSOCIATES INC.08/23/2016
BISOTRE-ISSUEDNATIONAL ENVIROMENTAL SAFETY08/23/2016
BISOTRE-ISSUEDNATIONAL ENVIROMENTAL SAFETY08/23/2016
BISPLISSUEDROBERT PARCHMENT P&H.INC08/23/2016
+ 16 more permits on file
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
08/06/2026FinalGEORGE GHEBRYALprogress
08/06/2026MasonryGEORGE GHEBRYALspecial
08/06/2026Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
08/06/2026Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
08/06/2026Concrete - PrecastGEORGE GHEBRYALspecial
08/06/2026Subgrade InspectionsGEORGE GHEBRYALspecial
08/04/2026Excavations - Sheeting, Shoring, and Bracing—special
07/17/2026Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
07/17/2026FinalGEORGE GHEBRYALprogress
07/17/2026Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
07/17/2026Subgrade InspectionsGEORGE GHEBRYALspecial
07/17/2026MasonryGEORGE GHEBRYALspecial
07/17/2026Concrete - PrecastGEORGE GHEBRYALspecial
06/29/2026Post-installed Anchors—special
06/29/2026HVAC-R and service water piping design and insulationJAMES WILSONenergy_progress
06/29/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
06/19/2026Post-installed Anchors—special
05/21/2026HVAC-R and service water piping design and insulationJAMES WILSONenergy_progress
05/21/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
05/06/2024Concrete - Precast—special
05/06/2024Masonry—special
05/06/2024Subgrade Inspections—special
05/06/2024Subsurface Conditions – Fill Placement & In-Place Density—special
05/06/2024Final—progress
05/06/2024Fire-Resistant Penetrations and Joints—special
Latest 25 of 55.
▾Documents — 197 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
08/24/2026X00753946-I1Request digital key ↗
08/24/2026X00753946-P1Request digital key ↗
08/22/2026X00955189-S2Request digital key ↗
Showing 3 of 20 on file for this type
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION7
09/01/2021240308485Open ↗
11/08/2017220521219Open ↗
04/22/2016220521166Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION5
08/23/2016220521219Open ↗
08/23/2016220521219Open ↗
08/23/2016220521219Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications64
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/24/2026X00753946-I1Open ↗
08/24/2026X00753946-P1Open ↗
08/22/2026X00955189-S1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
08/29/2026X00955189-P1Open ↗
08/26/2026X00979877-P4Open ↗
08/25/2026X00955189-I1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
01/24/2018220521219Open ↗
09/27/2017220521219Open ↗
09/15/2017220521219Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/11/2026X01032222-S1Open ↗
08/29/2026X00955189-P1Open ↗
08/26/2026X00979877-P4Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
09/01/2021240308485Open ↗
03/18/2016220521219Open ↗
03/18/2016220521219Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/01/2021240308485Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/18/2016220521219Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/01/2021240308485Open ↗
▸Trade Schedules & Equipment4
▸BISFA - FDNY APPROVAL : FD-FAA1
06/28/2022201028262Open ↗
▸BISEQUIPMENT USE PERMITS1
11/01/2018220521219Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/18/2016220521219Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
11/01/2018220521219Open ↗
▸Safety & Tenant Protection1
▸DOB NOWNYCSCA - Approved Site Safety Plans1
08/16/2026X01410012-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026X00753946-P1Open ↗
08/24/2026X00753946-I1Open ↗
08/21/2026X00979877-P4Open ↗
Showing 3 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
08/15/2016220521219Open ↗
08/15/2016220521219Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/01/2021240308485Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/15/2017220521219Open ↗
08/15/2016220521219Open ↗
03/18/2016220521219Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/15/2017220521219Open ↗
▸BISNYCECC ANALYSIS1
09/01/2021240308485Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/01/2021240308485Open ↗
▸Approvals, Objections & Sign-offs50
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter21
08/22/2026X00955189-S2Open ↗
08/22/2026X00955189-S1Open ↗
08/21/2026X00979877-P4Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)19
08/21/2026X00979877-P4Open ↗
08/16/2026X01410012-I1Open ↗
08/15/2026X00955189-P1Open ↗
Showing 3 of 19 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
11/01/2018220521219Open ↗
01/22/2018220521219Open ↗
09/27/2017220521219Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/22/2026X00955189-S2Open ↗
08/22/2026X00955189-S1Open ↗
08/14/2026X00955189-I1Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
09/01/2021240308485Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
04/16/2013201232424Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
09/01/2021240308485Open ↗
09/15/2017220521219Open ↗
09/15/2017220521219Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET4
03/18/2016220521219Open ↗
03/18/2016220521219Open ↗
03/18/2016220521219Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
09/27/2017220521219Open ↗
09/15/2017220521219Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/01/2021240308485Open ↗
▸BISADDITIONAL INFORMATION1
02/14/2017220521219Open ↗
▸Other Documents20
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal18
08/21/2026X00979877-P4Open ↗
08/16/2026X01410012-I1Open ↗
08/15/2026X00955189-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProof of Historic Building2
08/13/2026X00753946-P1Open ↗
08/13/2026X00753946-I1Open ↗