← Back
BuildNYC
Multi-story retail building (2+)
2192 BROADWAY
MANHATTAN · BIN 1030897
💬 Discuss this project
1910Year Built
2Stories
K2Building Class
C4-6AZoning
9,110 sfGross Floor Area
11Units
0 Active Violations
Multi-story retail building (2+) · Owner of record: L & M 2180 · 3,866 sf lot · 2.36 FAR built · Flood zone X
Locations of Work
Mechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofCrunch1 filing · 14 docs
Floor 2CrunchUnder Construction1p · 6 filings · 20 docs
Floor 1CrunchUnder Construction1p · 6 filings · 20 docs
CellarFriedland PropertiesUnder Construction2p · 6 filings · 20 docs
Sub-CellarFriedland PropertiesUnder Construction2p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
L M 21802903/21/2026
Lawrence Fried Land403/21/2026
The TJX Companies203/21/2026
Calhoun School103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S. J. ElectricElectrical203/21/2026
Arch ElectricElectrical103/21/2026
C.Q. Electr'l ContractingElectrical103/21/2026
Walton Electrical ConstructionElectrical103/21/2026
Econo Air Heating/Coolingspecialty_contractor110/04/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tamborra Architecture5339110/05/2026
Active Design Group Engineering6666209/22/2026
UG Engineering Services P9041210/20/2025
Building Lifecycle
All (100)Filed (12)Permit Issued (1)Violation (29)Objection (28)Special Inspection (30)
10/05/2026
Filed — Alteration
Remove Two (2) Existing Escalators on Cellar Floor to Sub-Cellar Floor within existing building as indicated in Approved DOBNOW Application #M01267325-I1. Cellar Escalator Floor Openings to be closed under a separate application by others.
M01458412-I1
09/24/2026
Filed — Alteration
GENERAL CONSTRUCTION FOR SELECTIVE INTERIOR DEMO-REMOVALS OF PARTITIONS, FURRING AT COLUMNS, DROPPED ACT CEILING, & WALLS OF RETAIL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01267325-P1
09/24/2026
Permit issued — Mechanical Systems
M01267613-I1-MS
09/22/2026
Filed — Alteration
STRUCTURAL WORK TO INFILL EXISTING ESCALATOR PIT IN SUB-CELLAR AND SLAB OPENINGS ON CELLAR AND 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01296956-P1
09/18/2026
Special inspection requirement — Interior lighting power
09/18/2026
Special inspection requirement — Energy Code Compliance Inspections
09/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/18/2026
Special inspection requirement — Lighting controls
09/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nicholas Tamborra
09/10/2026
Special inspection requirement — Final
09/04/2026
Special inspection requirement — Fenestration areas
09/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
09/04/2026
Special inspection requirement — Fenestration air leakage
09/04/2026
Special inspection requirement — Air barrier - visual inspection
07/27/2026
Objection resolved — Resolved
07/24/2026
Objection raised — Energy
07/24/2026
Objection raised — Energy
07/23/2026
Objection raised — Scope
06/30/2026
Objection resolved — Resolved
06/24/2026
Objection resolved — Addressed
06/22/2026
Objection resolved — Addressed
06/22/2026
Objection resolved — Resolved
06/22/2026
Objection resolved — Addressed
06/15/2026
Objection resolved — Addressed
06/15/2026
Objection resolved — Addressed
06/15/2026
Objection resolved — Addressed
06/12/2026
Objection raised — Scope
06/12/2026
Objection raised — Cost
06/09/2026
Objection raised — Cost
06/09/2026
Objection raised — Cost
06/09/2026
Objection raised — Scope
06/09/2026
Objection raised — Scope
06/09/2026
Objection resolved — Addressed
06/09/2026
Objection resolved — Addressed
06/08/2026
Objection raised — Scope
06/08/2026
Objection raised — Scope
06/08/2026
Objection raised — Energy
06/08/2026
Objection raised — Cost
06/04/2026
Special inspection requirement — Final
06/04/2026
Special inspection requirement — Final
Narendra SHAH
06/04/2026
Special inspection requirement — Structural Steel - Details
Narendra SHAH
06/04/2026
Special inspection requirement — Concrete - Cast-In-Place
Narendra SHAH
06/04/2026
Special inspection requirement — Post-installed Anchors
Narendra SHAH
06/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Narendra SHAH
06/04/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Narendra SHAH
06/01/2026
Filed — Alteration CO
MECHANICAL SCOPE ASSOCIATED WITH PHYSICAL CULTURE ESTABLISHMENT.
M01396734-S2
05/20/2026
Filed — Alteration CO
MECHANICAL SCOPE ASSOCIATED WITH PHYSICAL CULTURE ESTABLISHMENT.
M01396734-S3
05/20/2026
Filed — Alteration CO
MECHANICAL SCOPE ASSOCIATED WITH PHYSICAL CULTURE ESTABLISHMENT.
M01396734-S1
05/19/2026
Filed — Alteration CO
MECHANICAL SCOPE ASSOCIATED WITH PHYSICAL CULTURE ESTABLISHMENT.
M01396734-I1
05/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/18/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
05/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/08/2026
Special inspection requirement — Mechanical Systems
05/08/2026
Special inspection requirement — Sprinkler Systems
05/08/2026
Special inspection requirement — Final
05/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/07/2026
Special inspection requirement — Interior lighting power
05/07/2026
Special inspection requirement — Lighting controls
05/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedEcono Air Heating/Cooling09/24/2026
BIS—ISSUEDPlaza Construction05/01/2014
BISSPISSUEDA & F Fire Protection Co11/07/2013
BISMHISSUEDSchimenti Construction Co10/22/2013
BISOTISSUEDSchimenti Construction Co10/22/2013
BISPLISSUEDParamount Plumbing Co of NY.i08/09/2013
BIS—ISSUEDPlaza Construction05/08/2013
BISEQISSUEDPlaza Construction05/08/2013
BISSPISSUEDApproved Plumbing and Fire PR02/20/2013
BISEQISSUEDAtlantic Hoisting & Scaff12/28/2012
BISEQISSUEDAtlantic Hoisting & Scaff12/27/2012
BISPLISSUEDParamount Plumbing Co of NY.i07/09/2012
BISEQISSUEDAtlantic Hoisting & Scaff07/02/2012
BISEQISSUEDAtlantic Hoisting & Scaff06/26/2012
BISEQISSUEDPlaza Construction05/10/2012
BISOTISSUEDPlaza Construction05/10/2012
BISOTISSUEDPlaza Construction05/10/2012
BISOTISSUEDPlaza Construction05/10/2012
BISOTISSUEDPlaza Construction05/10/2012
BIS—ISSUEDPlaza Construction05/10/2012
BISEQISSUEDPlaza Construction05/10/2012
BIS—ISSUEDPlaza Construction04/24/2012
BISEQISSUEDPlaza Construction04/16/2012
BISOTISSUEDPlaza Construction11/30/2011
BISOTISSUEDPlaza Construction11/01/2011
BISEQISSUEDPlaza Construction11/01/2011
BISOTISSUEDPlaza Construction11/01/2011
BISOTRE-ISSUEDPlaza Construction11/01/2011
BISOTISSUEDUnitech Design08/01/2006
BISFPISSUEDFire Command Co12/29/2005
BISOTISSUEDUnitech Design02/01/2005
BIS—ISSUEDUnitech Design02/01/2005
BIS—ISSUEDUnitech Design02/01/2005
BIS—ISSUEDMarc Andrew Landis11/20/2002
BIS—ISSUEDMarc Andrew Landis11/20/2002
BIS—ISSUEDMontana Electrical Decorating Co10/11/2002
BISPLISSUEDMainland PLG Andhtg07/09/2001
BISOTISSUEDMichael Kuo06/27/2001
BISFPISSUEDGraceon Indystries07/15/1998
BISFPISSUEDMaster Fire Prevention Systems03/10/1992
1 project · most recent 06/01/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/01/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PURY-EM120TXU-A 135,000 BTU · Vrf Outdoor ×1
PURY-HM240TSXU-A 270,000 BTU · Vrf Outdoor ×1
1 project · most recent 06/01/2026
Sprinkler System
FiledStatusContractorScope
06/01/2026——Sprinkler System
1 project · most recent 06/01/2026
Water/Sanitary
FiledStatusContractorScope
06/01/2026——Water/Sanitary
1 project · most recent 07/02/2019
General Wiring
FiledStatusContractorScope
07/02/2019Permit IssuedS. J. ElectricGeneral Wiring
1 project · most recent 09/22/2026
Steel Concrete
FiledStatusContractorScope
09/22/2026——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
09/18/2026Interior lighting power—energy_progress
09/18/2026Energy Code Compliance Inspections—progress
09/18/2026Fire-Resistant Penetrations and Joints—special
09/18/2026Lighting controls—energy_progress
09/10/2026Structural Stability – Alterations of existing buildingsNicholas Tamborraspecial
09/10/2026Final—progress
09/04/2026Fenestration areas—energy_progress
09/04/2026Fenestration and door U-factor and product ratings—energy_progress
09/04/2026Fenestration air leakage—energy_progress
09/04/2026Air barrier - visual inspection—energy_progress
06/04/2026Final—progress
06/04/2026FinalNarendra SHAHprogress
06/04/2026Structural Steel - DetailsNarendra SHAHspecial
06/04/2026Concrete - Cast-In-PlaceNarendra SHAHspecial
06/04/2026Post-installed AnchorsNarendra SHAHspecial
06/04/2026Structural Stability – Alterations of existing buildingsNarendra SHAHspecial
06/04/2026Structural Steel - High Strength BoltingNarendra SHAHspecial
05/18/2026HVAC-R and service water piping design and insulation—energy_progress
05/18/2026Exhaust and Vent Systems in Plenums and Ducts—special
05/18/2026HVAC-R and service water heating equipment—energy_progress
05/18/2026HVAC-R and service water heating system controls—energy_progress
05/08/2026Mechanical Systems—special
05/08/2026Sprinkler Systems—special
05/08/2026Final—progress
05/07/2026Fire-Resistant Penetrations and Joints—special
Latest 25 of 37.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
CrunchFitness / RecreationFloors 1, 2, Roof
Project M01396734 Alteration CO · Objections · 05/19/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 321 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
10/06/2026M01458412-I1Request digital key ↗
08/21/2026M01267613-I1Request digital key ↗
08/21/2026M01267615-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits58
▸BISPLAN / WORK APPROVAL APPLICATION31
12/06/2016103311774Open ↗
12/06/2016103214264Open ↗
12/06/2016103311408Open ↗
Showing 3 of 31 on file for this type
▸BISWORK PERMIT APPLICATION27
05/06/2014120883990Open ↗
05/06/2014120883990Open ↗
11/11/2013121632162Open ↗
Showing 3 of 27 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISZONING RESOLUTION DETERMINATION2
11/19/2014120883990Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications76
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION44
04/20/2015120808000Open ↗
04/21/2014121632162Open ↗
04/18/2014121628907Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
10/06/2026M01458412-I1Open ↗
10/05/2026M01296956-P1Open ↗
08/21/2026M01267615-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
10/11/2026M01458412-I1Open ↗
10/05/2026M01296956-P1Open ↗
10/05/2026M01296956-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
10/05/2026M01296956-P1Open ↗
08/25/2026M01267613-I1Open ↗
08/23/2026M01296956-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
07/02/2012121133861Open ↗
06/28/2012121078467Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/02/2012121133861Open ↗
06/28/2012121078467Open ↗
▸Trade Schedules & Equipment20
▸BISSELF-CERT PLUMBING NOTICE8
12/04/2014121023310Open ↗
04/22/2014121632162Open ↗
04/04/2014121632162Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING5
09/06/2013121023310Open ↗
06/03/2013121628907Open ↗
05/31/2013121632162Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
03/21/2014121628907Open ↗
03/06/2014121628907Open ↗
12/31/2013121628907Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA3
06/03/2014121906946Open ↗
02/26/2014121139847Open ↗
07/19/2012121139847Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
12/04/2014121023310Open ↗
▸Safety & Tenant Protection3
▸BISDS1-Demolition Submittal Certification Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE CHECKLIST1
03/11/2019120883990Open ↗
▸DOB NOWStreet Tree Checklist1
08/17/2026M01396734-I1Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
10/06/2026M01458412-I1Open ↗
10/05/2026M01267325-P1Open ↗
10/05/2026M01296956-P1Open ↗
Showing 3 of 14 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
11/11/2013121632162Open ↗
Showing 1 of 2 on file for this type
▸BISASBESTOS-CERTIFICATION (DEP ACP5)2
07/05/2012121133861Open ↗
06/28/2012121078467Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
04/18/2014121628907Open ↗
04/16/2014121628907Open ↗
10/03/2013120883990Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX9
06/05/2012120883990Open ↗
Showing 1 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
04/20/2015120808000Open ↗
Showing 1 of 3 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
07/29/2013121632162Open ↗
▸BISHYDRO FLOW TEST LETTER1
07/29/2013121023310Open ↗
▸Approvals, Objections & Sign-offs51
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST40
08/26/2020120883990Open ↗
02/03/2020120883990Open ↗
11/15/2019120883990Open ↗
Showing 3 of 40 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
06/03/2013121628907Open ↗
05/31/2013121632162Open ↗
07/19/2012121139847Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/20/2015120808000Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT15
04/20/2015120808000Open ↗
12/17/2014121023310Open ↗
06/21/2014121632162Open ↗
Showing 3 of 15 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE (PGLI)2
05/14/2013120883990Open ↗
04/25/2012120883990Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
05/06/2014120883990Open ↗
▸Filing & Intake Forms33
▸BISEFILING COVER SHEET14
02/03/2014121906946Open ↗
06/03/2013121628907Open ↗
06/03/2013121628907Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM12
02/03/2020120883990Open ↗
11/15/2019120883990Open ↗
08/20/2019120883990Open ↗
Showing 3 of 12 on file for this type
▸BISADDITIONAL INFORMATION7
09/26/2013121023310Open ↗
09/25/2012120883990Open ↗
09/05/2012120883990Open ↗
Showing 3 of 7 on file for this type
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
07/29/2013121632162Open ↗
04/25/2012120883990Open ↗
Showing 2 of 3 on file for this type
▸BISSupporting Document: Fee Exempt3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDRY PIPE VALVE TEST : FP-101
12/04/2014121023310Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026M01396734-I1Open ↗