← Back
BuildNYC
City university
Receiving Building
2195 LORING PLACE NORTH · BIN 2119433
💬 Discuss this project
1939Year Built
—Stories
W5Building Class
R5Zoning
15,654 sfGross Floor Area
1Units
1 Active Violation ▸
City university · 123,225 sf lot · 0.13 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Bronx Community College CUNY, The City University of New Yor9p · 5 filings · 17 docs
CellarPatterson Garage gas booster pump1 filing · 6 docs
Site & exteriorThe City University of New York, Bronx Community College CUN8p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Dasny607/08/2026
Dormitory Authority of the State503/21/2026
CUNY503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ventrop Engineering Consulting Group106/11/2026
Shenoy Engineering411/13/2025
Graf & Lewent Architects111/06/2025
Peter Tauberer, PE112/02/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services1103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Corzo Electl SystemsElectrical103/21/2026
King Freeze Mechanical Cospecialty_contractor107/08/2026
Z-Car-DSign hanger107/08/2026
Mac FelderPlumbing107/08/2026
Nationwide MechanicalFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106512/02/2021
Building Lifecycle
All (29)Filed (7)Permit Issued (4)Signed Off (4)Violation (1)Special Inspection (13)
06/11/2026
Filed — Alteration
FILING FOR INSTALLATION OF NEW HOT WATER FLOW METER AS PER PLANS. WORK INCLUDES PROVIDING A BTU METER TO MEASURE SUPPLY AND RETURN TEMPERATURE & TO RE-INSTALLED ALL DISTURBED PIPING, ASSOCIATED SUPPORT AND RE-INSULATE DISTURBED PIPING AS PER SPECIFICATION
X01250729-I1
11/13/2025
Filed — Alteration
INSTALLATION OF GAS BOOSTER PUMP IN OSP AS PER PLANS
X01282340-S1
11/06/2025
Filed — Alteration
INSTALLATION OF GAS BOOSTER PUMP IN OSP AS PER PLANS
X01282340-I1
09/04/2025
Special inspection requirement — Final
07/02/2025
Special inspection requirement — Metering
07/02/2025
Special inspection requirement — Energy Code Compliance Inspections
07/02/2025
Special inspection requirement — Final
07/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/02/2025
Special inspection requirement — Mechanical Systems
05/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/03/2023
Signed off — Alteration
MECHANICAL RELATED WORK AS PER DRAWINGS.
X00196048-I1
03/16/2023
Signed off — Alteration
X00603251-I1
01/26/2023
Signed off — Alteration
FILING HEREWITH SPRINKLER LAYOUT FOR RENOVATION OF EXISTING BUILDING
X00196193-I1
01/26/2023
Signed off — Alteration
PLUMBING RELATED WORK FOR RENOVATION OF EXISTING BUILDING INCLUDING NEW FIRE SERVICE WITH DOMESTIC TAKEOFF, ELECTRIC HOT WATER HEATER, GAS SERVICE, AND ASSOCIATED PIPING DISTRIBUTION.
X00196156-I1
12/06/2022
Permit issued — Sign
X00603251-I1-SG
09/13/2022
Permit issued — Plumbing
X00196156-I1-PL
08/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDUARDO LIEVANO
05/21/2022
Permit issued — Mechanical Systems
X00196048-I1-MS
12/02/2021
Filed — Alteration
X00603251-I1
09/30/2021
Special inspection requirement — Final
GEORGE GHEBRYAL
09/30/2021
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
09/30/2021
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
09/30/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
05/18/2021
Permit issued — Sprinklers
X00196193-I1-EW-SP
06/24/2020
Special inspection requirement — Sprinkler Systems
EDUARDO LIEVANO
06/24/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDUARDO LIEVANO
01/09/2020
Filed — Alteration
MECHANICAL RELATED WORK AS PER DRAWINGS.
X00196048-I1
01/09/2020
Filed — Alteration
FILING HEREWITH SPRINKLER LAYOUT FOR RENOVATION OF EXISTING BUILDING
X00196193-I1
01/09/2020
Filed — Alteration
PLUMBING RELATED WORK FOR RENOVATION OF EXISTING BUILDING INCLUDING NEW FIRE SERVICE WITH DOMESTIC TAKEOFF, ELECTRIC HOT WATER HEATER, GAS SERVICE, AND ASSOCIATED PIPING DISTRIBUTION.
X00196156-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offZ-Car-D12/06/2022
DOB NOWPlumbingSigned-offMac Felder09/13/2022
DOB NOWMechanical SystemsSigned-offKing Freeze Mechanical Co05/21/2022
DOB NOWSprinklersSigned-offNationwide Mechanical05/18/2021
BIS—ISSUEDConstructomics04/05/2024
BIS—ISSUEDConstructomics04/05/2024
BISOTISSUEDConstructomics08/07/2020
BISEQISSUEDEmpire Control Abatement08/15/2013
BIS—ISSUEDAMG Environmentl Restoration05/14/2013
BISEQISSUEDAMG Environmentl Restoration05/10/2013
BISEQISSUEDAMG Environmentl Restoration02/05/2013
1 project · most recent 11/13/2025
Gas
FiledStatusContractorScope
11/13/2025——Gas
1 project · most recent 11/13/2023
General Wiring
FiledStatusContractorScope
11/13/2023CompleteCorzo Electl SystemsGeneral Wiring
1 project · most recent 11/13/2025
Concrete
FiledStatusContractorScope
11/13/2025——Concrete
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
09/04/2025Final—progress
07/02/2025Metering—energy_progress
07/02/2025Energy Code Compliance Inspections—progress
07/02/2025Final—progress
07/02/2025Fire-Resistant Penetrations and Joints—special
07/02/2025Mechanical Systems—special
08/02/2022Fire-Resistant Penetrations and JointsEDUARDO LIEVANOspecial
09/30/2021FinalGEORGE GHEBRYALprogress
09/30/2021Structural Steel - WeldingGEORGE GHEBRYALspecial
09/30/2021Structural Steel - DetailsGEORGE GHEBRYALspecial
09/30/2021Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
06/24/2020Sprinkler SystemsEDUARDO LIEVANOspecial
06/24/2020Fire-Resistant Penetrations and JointsEDUARDO LIEVANOspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The City University of New YorkEducationFloor 1
Project X01250729 Alteration · Approved · 06/11/2026
Project X00603251 Alteration · LOC Issued · 12/02/2021
Bronx Community College CUNYEducationFloor 1
Project X00196048 Alteration · LOC Issued · 01/09/2020
Project X00196156 Alteration · LOC Issued · 01/09/2020
Project X00196193 Alteration · LOC Issued · 01/09/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 141 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch4
08/25/2026X00603251-I1Request digital key ↗
08/17/2026X01282340-S1Request digital key ↗
08/17/2026X01282340-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/26/2026X00196048-I1Request digital key ↗
08/15/2026X00196048-P2Request digital key ↗
08/14/2026X00196048-P1Request digital key ↗
▸Applications & Permits21
▸BISPLAN / WORK APPROVAL APPLICATION13
11/21/2023220712129Open ↗
12/13/2022220712129Open ↗
07/23/2020220725758Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION7
04/16/2024220712129Open ↗
08/07/2020220725758Open ↗
05/04/2020220712129Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/01/2021220712129Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISFINAL - TOPO STAMP TO VERIFY ADDRESS OF PROPERTY1
05/20/2024220712129Open ↗
▸Seals & Professional Certifications16
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
03/18/2020220712129Open ↗
03/11/2020220725758Open ↗
01/14/2020220712129Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/16/2026X01250729-I1Open ↗
08/13/2026X01282340-S1Open ↗
08/13/2026X00603251-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/23/2026X00603251-I1Open ↗
08/23/2026X00603251-I1Open ↗
08/23/2026X00603251-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026X00603251-I1Open ↗
▸Trade Schedules & Equipment1
▸BISELECTRIC CUT-OFF1
05/14/2013220255097Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST1
02/11/2020220712129Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
05/14/2013220255097Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
05/14/2013220255097Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
03/01/2013220255097Open ↗
▸Environmental & Asbestos12
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
08/07/2020220725758Open ↗
07/14/2020220725758Open ↗
04/06/2020220712129Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/16/2026X01250729-I1Open ↗
08/13/2026X00196156-P2Open ↗
08/13/2026X01282340-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS INSPECTION REPORT3
03/01/2013220255097Open ↗
03/01/2013220255097Open ↗
03/01/2013220255097Open ↗
▸BISRODENT CONTROL1
05/14/2013220255097Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/18/2020220712129Open ↗
03/09/2020220712129Open ↗
01/14/2020220712129Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/31/2022220712129Open ↗
▸BISLIGHTING CONTROLS1
12/15/2023220712129Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/15/2023220712129Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/31/2022220712129Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY16
03/03/2023220725758Open ↗
03/03/2023220725758Open ↗
03/03/2023220725758Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
07/30/2020220712129Open ↗
07/30/2020220712129Open ↗
07/30/2020220712129Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
04/11/2023220725758Open ↗
▸Approvals, Objections & Sign-offs26
▸BISLETTERS - SUPPORTING DOCUMENTATION8
05/04/2020220712129Open ↗
03/11/2020220725758Open ↗
08/08/2019220712129Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/16/2026X01250729-I1Open ↗
08/14/2026X00196156-P1Open ↗
08/13/2026X00196156-P2Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
03/01/2013220255097Open ↗
01/31/2013220249737Open ↗
05/21/2012220205864Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
12/13/2022220712129Open ↗
08/08/2019220712129Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/28/2023220249737Open ↗
04/11/2023220725758Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
05/14/2013220255097Open ↗
▸BISFINAL - FINAL CONSTRUCTION SIGNOFF DATED 12/09/2021 HAD EXPIRED ON 6/09/2023....NEED TO UPDATE FINAL CONSTRUCTION SIGNOFF1
—220712129Open ↗
▸BISFINAL ELECTRICAL SIGNOFF1
02/08/2024220712129Open ↗
▸BISFINAL - 2ND REQUEST FOR UPDATED FINAL CONSTRUCTION SIGNOFF THAT HAD EXPIRED ON 6/09/2024...NEED TO UPDATE FINAL CONSTRUCTION SIGNOFF1
05/28/2024220712129Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT8
03/03/2023220725758Open ↗
03/03/2023220725758Open ↗
02/10/2023220725758Open ↗
Showing 3 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/15/2023220712129Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
07/14/2020220725758Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
05/14/2013220255097Open ↗
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET6
03/11/2020220725758Open ↗
08/08/2019220712129Open ↗
03/01/2013220255097Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION5
02/08/2024220712129Open ↗
07/14/2020220725758Open ↗
07/14/2020220725758Open ↗
Showing 3 of 5 on file for this type
▸Other Documents3
▸BISFINAL - NEED TO SUBMIT FINAL SURVEY. SURVEY SUBMITTED IS NOT THE FINAL SURVEY....ALSO SUBMIT AI-1 FORM TO GO ALONG WITH FINAL SURVEY1
05/28/2024220712129Open ↗
▸BISFINAL - SURVEY SUBMITTED SHOWS1
05/28/2024220712129Open ↗
▸BISFINAL - TAX MAP TO VERIFY BLOCK AND LOT OF PROPERTY1
05/20/2024220712129Open ↗