DOB01/17/2020VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
HPD04/06/2010SECTION 27-2091 HMC, ? 302 MDL : APARTMENTS HAVE BEEN ISSUED A COMMISSIONER'S ORDER AND OCCUPANTS ARE IN NEED OF RELOCATION SERVICES. APARTMENTS CANNOT BE RE-OCCUPIED UNITL THE COMMISSIONER'S ORDER IS REVOKED AFTER HPD INSPECTION OF APARTMENTS. COMMISSIONER'S ORDER # 09/0146 IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY
DOB12/23/2009V-DOB VIOLATION - ACTIVE
ECB01/06/2011FILED A C/C OR OTHER RELATED MATERIALS CONTAINING FALSE STATEMENT(S). RESPONDENT FILED A C/C ON 8.24.10 FOR NOV 34848611Z, UPON INSPECTION FOUND THAT THE CONDITION(S)WHICH RESPONDENET DESCRIBED AS HAVING BEINGNothing owed — awaiting certificate of correction
ECB01/06/2011FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A C/C W/THE DOB. RESPONDENT FAILED TO COMPLY W/THE COMMISSIONER'S ORDER TO CORRECT THE VIO CONDITION(S) & FILE A C/C PURSUANT TO 28-204.2 FOR NOV #34848011Z. A FALSENothing owed — awaiting certificate of correction
ECB07/16/2010WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS FOR THIS PRO CERT ALT II JOB #420092161 DWG: 5.24.10. NOTED: 1) AT REAR GARAGE, PLAN PROPOSES 1 MEZZANINE, AT REAR OF 2 STYNothing owed — awaiting certificate of correction