New Haven Towers
22-10 NEW HAVEN AVENUE · Far Rockaway-Bayswater · BIN 4300884
💬 Discuss this project
1962Year Built
6Stories
D1Building Class
R5Zoning
180,300 sfGross Floor Area
153Units
LL97 CoveredRent Stabilized4 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: NEW HAVEN ROCKAWAY, LLC · 48,685 sf lot · 3.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Roof2p · 2 filings · 8 docs
Floor 64p · 1 filing · 4 docs
Floor 54p · 1 filing · 4 docs
Floor 44p · 1 filing · 4 docs
Floor 34p · 1 filing · 4 docs
Floor 25p · 1 filing · 4 docs
Floor 17p · 3 filings · 11 docs
Cellar5p · 4 filings · 20 docs
Sub-Basement4p · 2 filings · 7 docs
Site & exterior13p · 3 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHATEAU GC LLC1907/08/2026
NHT OWNERS1603/21/2026
PROGRESSIVE MANAGEMENT703/22/2026
NSACONTRACTING607/08/2026
GUL & G CONTRACTING INC503/22/2026
RELIABLE ENTERPRISES407/08/2026
RMZ CONTRACTING403/21/2026
NAT OWNERS203/21/2026
NEW HAVEN ROCKAWAY, LLC103/22/2026
SKYWORX CONTRACTING INC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/31/2022$45.0M—NHT OWNERS, LLC → NEW HAVEN ROCKAWAY, LLC$250/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROBERT GERMAIN JR. PE402/08/2023
ENTHINK ENGINEERS LLC101/26/2023
DANIEL R. WAPNER PE., P.C.112/29/2022
AUFGANG ARCHITECTS110/28/2022
THE MTM DESIGN GROUP, LLC108/04/2022
AZIMUTH ENGINEERING111/09/2021
ASHRAF CORP312/09/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES103/21/2026
W J PROFESSIONAL EXPEDITING COMPANY203/21/2026
4444 PPPP CORP103/21/2026
DANICO SERVICES603/21/2026
BILTMORE GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHATEAU GC LLCGeneral Contractor407/08/2026
GOTHAM COMMUNICATIONS LLCGeneral Contractor407/08/2026
NY CITY PLUMBER CORPPlumbing307/08/2026
GUL & G CONTRACTING INCGeneral Contractor303/21/2026
ABILENE INCGeneral Contractor203/21/2026
SYED-NAQVI ALTAFElectrical103/21/2026
H&F IRON WORKSElectrical103/21/2026
FOY, REMERElectrical103/21/2026
NADEEM AKHTARGeneral Contractor107/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor107/08/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROBERT F. GERMAIN JR. PE5100402/08/2023
DANIEL WAPNER, PE819112/29/2022
THE MTM DESIGN GROUP, LLC1319108/04/2022
JEREMY K MCKEON, P.E.7263111/09/2021
Building Lifecycle
All (129)Filed (12)Permit Issued (11)Signed Off (10)Facade (FISP) (17)Violation (60)Inspection (5)Special Inspection (14)
03/04/2026
Violation issued (HPD, closed)
C
03/04/2026
Violation issued (HPD, closed)
C
05/27/2025
Violation issued (HPD, closed)
B
01/08/2025
Violation issued (HPD, closed)
A
01/08/2025
Violation issued (HPD, closed)
C
01/08/2025
Violation issued (HPD, closed)
A
01/08/2025
Violation issued (HPD, closed)
C
01/08/2025
Violation issued (HPD, closed)
A
05/05/2024
Signed off — Alteration
INSTALLATION OF HEAVYDUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
Q00193881-I1
04/19/2024
Violation issued (ECB, closed)
Construction
01/11/2024
Signed off — Alteration
Q00818344-I1
12/27/2023
Cycle 9 facade report submitted
12/27/2023
Cycle 9 facade report signed — SAFE
12/16/2023
Violation issued (HPD, closed)
C
12/13/2023
Signed off — Alteration
Filing for moderate interior renovation including kitchens and bathrooms, new common area finishes, elevator cab finishes and garage repairs. No change in egress use, zoning or occupancy.
Q08027169-I1
12/13/2023
Signed off — Alteration
Q08048729-I1
11/15/2023
Cycle 9 facade inspection completed
11/10/2023
Violation issued (HPD, closed)
C
10/17/2023
Violation issued (HPD, closed)
A
10/02/2023
Signed off — Alteration
RECONNECT EXISTING LP GAS LINE. (2) NEW GAS TRAINS. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
Q00809946-I1
09/25/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/22/2023
Signed off — Alteration
NEW 10 GAGE 304 SS LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
Q00809926-I1
08/22/2023
Signed off — Alteration
REPLACEMENT (1) NEW COMBINATION GAS OIL BURNER ON (1) NEW LP BOILER. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
Q00809985-I1
08/22/2023
Signed off — Alteration
(1) NEW COMBINATION GAS/OIL BURNER ON (1) NEW LP BOILER IN CONJUNCTION WITH DOB NOW QOO809985. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
Q00810253-I1
08/10/2023
Permit issued — General Construction
Q08048729-I1-GC
07/31/2023
Violation issued (ECB, closed)
Construction
07/26/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/19/2023
Signed off — Alteration
Q00607114-I1
07/17/2023
Cycle 9 facade report submitted
07/17/2023
Cycle 9 facade report signed — UNSAFE
07/14/2023
Cycle 9 facade inspection completed
06/27/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/11/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/04/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/19/2023
Violation issued (ECB, closed)
Construction
03/28/2023
Violation issued (ECB, closed)
Construction
03/13/2023
Violation issued (HPD, closed)
B
03/13/2023
Violation issued (HPD, closed)
B
03/13/2023
Violation issued (HPD, closed)
C
03/13/2023
Violation issued (HPD, closed)
C
02/13/2023
Permit issued — Boiler Equipment
Q00809985-I1-BE
02/13/2023
Permit issued — Boiler Equipment
Q00810253-I1-BE
02/10/2023
Permit issued — General Construction
Q00809926-I1-GC
02/10/2023
Permit issued — Plumbing
Q00809946-I1-PL
02/08/2023
Filed — Alteration
RECONNECT EXISTING LP GAS LINE. (2) NEW GAS TRAINS. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
Q00809946-I1
02/08/2023
Filed — Alteration
NEW 10 GAGE 304 SS LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
Q00809926-I1
02/08/2023
Filed — Alteration
REPLACEMENT (1) NEW COMBINATION GAS OIL BURNER ON (1) NEW LP BOILER. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
Q00809985-I1
02/08/2023
Filed — Alteration
(1) NEW COMBINATION GAS/OIL BURNER ON (1) NEW LP BOILER IN CONJUNCTION WITH DOB NOW QOO809985. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
Q00810253-I1
01/26/2023
Filed — Alteration
Q00818344-I1
01/26/2023
Permit issued — Sidewalk Shed
Q00818344-I1-SH
01/10/2023
Violation issued (ECB, closed)
Construction
01/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
01/10/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Germain Jr.
01/10/2023
Special inspection requirement — HVAC-R and service water heating equipment
Robert Germain Jr.
01/10/2023
Special inspection requirement — Maintenance information
Robert Germain Jr.
01/10/2023
Special inspection requirement — HVAC-R and service water heating system controls
Robert Germain Jr.
01/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
01/09/2023
Special inspection requirement — Maintenance information
Robert Germain Jr.
01/09/2023
Special inspection requirement — HVAC-R and service water heating system controls
Robert Germain Jr.
01/09/2023
Special inspection requirement — HVAC-R and service water heating equipment
Robert Germain Jr.
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCHATEAU GC LLC08/10/2023
DOB NOWBoiler EquipmentSigned-offNY CITY PLUMBER CORP02/13/2023
DOB NOWBoiler EquipmentSigned-offNY CITY PLUMBER CORP02/13/2023
DOB NOWGeneral ConstructionSigned-offABILENE INC02/10/2023
DOB NOWPlumbingSigned-offNY CITY PLUMBER CORP02/10/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC01/26/2023
DOB NOWAntennaSigned-offGOTHAM COMMUNICATIONS LLC12/30/2022
DOB NOWGeneral ConstructionSigned-offCHATEAU GC LLC11/15/2022
DOB NOWAntennaPermit IssuedGOTHAM COMMUNICATIONS LLC08/11/2022
DOB NOWSupported ScaffoldPermit IssuedNADEEM AKHTAR08/20/2019
DOB NOWSidewalk ShedSigned-offGUL & G CONTRACTING INC07/20/2019
BISOTISSUEDGUAYACOS CORP06/06/2022
BISOTISSUEDGUAYACOS CORP06/06/2022
BISOTISSUEDNADEEM AKHTAR12/02/2019
BISOTISSUEDNADEEM AKHTAR08/29/2017
BISEQISSUEDNADEEM AKHTAR07/21/2017
BISEQISSUEDGUL & G CONTRACTING INC06/07/2017
BISOTISSUEDNADEEM AKHTAR06/06/2017
BISOTISSUEDNADEEM AKHTAR07/22/2016
BISEQISSUEDNADEEM AKHTAR07/11/2016
BISEQISSUEDGUL & G CONSTR. CORP06/03/2016
BISOTISSUEDRMZ CONTRACTING INC06/30/2014
BISEQISSUEDSKYWORX CONTRACTING INC06/13/2014
BISOTISSUEDVERTICAL SOLUTIONS INC03/11/2013
BISOTISSUEDODYSSIA GLOBAL COMM. CORP07/05/2012
BISOTISSUEDCOSTROTTA CONSTRUCT MG IN02/09/2012
BISPLISSUEDTRADELINE PLUMBING INC11/17/2010
BISOTISSUEDN.S. CONSTR & WATERPROOF08/03/2010
BISPLISSUEDTRADELINE PLUMBING INC06/03/2008
BISOTISSUEDARETE DEVELOPMENT INC03/10/2008
BISOTISSUEDSBA COMMUNIICATIONS GROUP03/17/2006
BISEQISSUEDENVIRONMENTAL CONSTRUCTION02/01/2006
BISOTISSUEDENVIORNMENTAL CONST. SEVR INC01/09/2006
BISEQISSUEDENVIRONMENTAL CONSTRUCTION10/27/2005
BISOTISSUEDNORTHCOAST PCS COMMUNICATIONS11/16/2001
BISOTISSUEDSKINNER & COOK INC03/21/2000
BISOTISSUEDSKINNER & COOK INC12/20/1999
BISOTISSUEDBERLINER COMMUNICATIONS INC06/11/1999
BISMHISSUEDHIGHLAND CONSTRUCTION ASSOCIATES11/06/1997
BISOTISSUEDHIGHLAND CONSTRUCTION ASSOCIATES08/30/1996
8 projects · most recent 05/21/2023
General Wiring Boiler Controls
FiledStatusContractorScope
05/21/2023CompleteTUXEDO ELEC'L CONTR'G INC—
04/13/2023CompleteABILENE ELECTRIC INCBoiler Controls
01/27/2023CompleteRICHARD NEU—
01/19/2023CompleteABILENE ELECTRIC INC—
01/10/2023CompleteSHELBY ELECTRICAL CORPGeneral Wiring
12/28/2022CompleteJEM ELEC'L CONTR. CORPGeneral Wiring
04/08/2021Permit IssuedWHYNN ELECTRIC CORP.General Wiring
07/19/2019CompleteWCK ELECTRIC CORP.—
1 project · most recent 12/09/2019
Scaffold
FiledStatusContractorScope
12/09/2019Permit IssuedNADEEM AKHTARScaffold
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/25/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/26/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/27/2023Pass-Final Boiler Equipment InspectionPassView ↗
05/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
01/10/2023Fire-Resistant Penetrations and JointsRobert Germain Jr.special
01/10/2023HVAC-R and service water piping design and insulationRobert Germain Jr.energy_progress
01/10/2023HVAC-R and service water heating equipmentRobert Germain Jr.energy_progress
01/10/2023Maintenance informationRobert Germain Jr.energy_progress
01/10/2023HVAC-R and service water heating system controlsRobert Germain Jr.energy_progress
01/09/2023Fire-Resistant Penetrations and JointsRobert Germain Jr.special
01/09/2023Maintenance informationRobert Germain Jr.energy_progress
01/09/2023HVAC-R and service water heating system controlsRobert Germain Jr.energy_progress
01/09/2023HVAC-R and service water heating equipmentRobert Germain Jr.energy_progress
01/09/2023HVAC-R and service water piping design and insulationRobert Germain Jr.energy_progress
12/29/2022Tenant Protection Plan ComplianceDaniel Wapnerspecial
12/02/2022MasonryDaniel Wapnerspecial
12/02/2022Structural Stability – Alterations of existing buildingsDaniel Wapnerspecial
12/02/2022FinalDaniel Wapnerprogress
▾Documents — 201 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch9
08/27/2026Q00607114-I1Request digital key ↗
08/26/2026Q00771701-I1Request digital key ↗
08/25/2026Q08027169-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
08/28/2026Q00193884-I1Request digital key ↗
08/15/2026Q00193884-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00193881-I1Request digital key ↗
▸Applications & Permits42
▸BISPLAN / WORK APPROVAL APPLICATION24
10/29/2025421943945Open ↗
08/25/2022421941340Open ↗
08/25/2022421941340Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION18
06/21/2022421338314Open ↗
06/21/2022421941340Open ↗
12/06/2019421941340Open ↗
Showing 3 of 18 on file for this type
▸Seals & Professional Certifications52
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/28/2026Q00193881-I1Open ↗
08/28/2026Q00193884-I1Open ↗
08/27/2026Q00607114-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
03/18/2020421943945Open ↗
12/06/2019421941340Open ↗
12/06/2019421941340Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026Q00810253-I1Open ↗
09/23/2026Q00810253-I1Open ↗
09/23/2026Q00809985-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
12/06/2019421941340Open ↗
08/01/2016421338314Open ↗
07/13/2016421338289Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
12/06/2019421941340Open ↗
08/01/2016421338314Open ↗
07/13/2016421338289Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026Q00810253-I1Open ↗
09/23/2026Q00809985-I1Open ↗
08/25/2026Q08048729-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/03/2010420234810Open ↗
06/02/2008410118340Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/30/2014440151988Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/30/2014440151988Open ↗
▸Trade Schedules & Equipment5
▸BISSELF-CERT PLUMBING NOTICE4
03/21/2011410118340Open ↗
02/24/2011410118340Open ↗
01/18/2011410118340Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING1
06/02/2008410118340Open ↗
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes5
03/18/2020421943945Open ↗
12/06/2019421941340Open ↗
08/01/2016421338314Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan3
08/28/2026Q00193881-I1Open ↗
08/28/2026Q00193884-I1Open ↗
08/13/2026Q00193884-P1Open ↗
▸Environmental & Asbestos14
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
03/18/2020421943945Open ↗
12/06/2019421941340Open ↗
08/01/2016421338314Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/25/2026Q00810253-I1Open ↗
08/25/2026Q00809985-I1Open ↗
08/13/2026Q00809946-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
01/30/2012420527264Open ↗
08/03/2010420234810Open ↗
06/02/2008410118340Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026Q00607114-I1Open ↗
08/13/2026Q08027169-I1Open ↗
08/13/2026Q00771701-I1Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
03/18/2020421943945Open ↗
12/06/2019421941340Open ↗
08/01/2016421338314Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/29/2022421338314Open ↗
08/29/2022421338314Open ↗
06/30/2014440151988Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
08/02/2022421338314Open ↗
06/20/2014420527264Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00607114-I1Open ↗
08/13/2026Q00607114-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026Q00809985-I1Open ↗
08/13/2026Q00810253-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/02/2022421941340Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/30/2014440151988Open ↗
▸BISTECHNICAL REPORT: ENERGY1
01/30/2012420527264Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY6
08/29/2022421338314Open ↗
08/29/2022421338314Open ↗
08/02/2022421941340Open ↗
Showing 3 of 6 on file for this type
▸BISDOB FINAL INSPECTION REQUIRED1
08/29/2022421338314Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
08/02/2022421941340Open ↗
▸Approvals, Objections & Sign-offs19
▸BISADMINISTRATIVE OBJECTIONS7
08/01/2016421338314Open ↗
07/13/2016421338289Open ↗
06/07/2016421303967Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
08/31/2022421338314Open ↗
06/20/2014420527264Open ↗
04/14/2011410118340Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
06/20/2014420527264Open ↗
04/14/2011410118340Open ↗
02/09/2011420234810Open ↗
▸BISSUPERSEDING LETTER3
06/21/2022421338314Open ↗
06/21/2022421941340Open ↗
06/30/2017421303967Open ↗
▸BISSHED LETTER1
06/30/2017421303967Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026Q08027169-I1Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT11
08/02/2022421338314Open ↗
03/18/2020421943945Open ↗
12/06/2019421941340Open ↗
Showing 3 of 11 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
08/05/2022421941340Open ↗
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET9
03/18/2020421943945Open ↗
12/06/2019421941340Open ↗
08/01/2016421338314Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM2
06/21/2022421338314Open ↗
06/21/2022421941340Open ↗
▸BISADDITIONAL INFORMATION1
08/25/2022421941340Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/30/2014440151988Open ↗