← Back
BuildNYC
Elevator apt, semi-fireproof without stores
New Haven Towers
22-10 NEW HAVEN AVENUE · BIN 4300884
💬 Discuss this project
1962Year Built
6Stories
D1Building Class
R5Zoning
180,300 sfGross Floor Area
153Units
LL97 CoveredRent Stabilized2 Active Violations 1 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: New Haven Rockaway · 48,685 sf lot · 3.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofTelecom site decommissioning and equipment removal2p · 2 filings · 8 docs
Floor 6Interior renovation, kitchens, bathrooms, common areas, elev3p · 1 filing · 4 docs
Floor 5Interior renovation, kitchens, bathrooms, common areas, elev3p · 1 filing · 4 docs
Floor 4Interior renovation, kitchens, bathrooms, common areas, elev3p · 1 filing · 4 docs
Floor 3Interior renovation, kitchens, bathrooms, common areas, elev3p · 1 filing · 4 docs
Floor 2Interior renovation, kitchens, bathrooms, common areas, elev4p · 1 filing · 4 docs
Floor 1Heavy duty sidewalk shed installation6p · 3 filings · 11 docs
CellarReplacement of new gas oil burner and LP boiler5p · 4 filings · 20 docs
BasementInterior renovation, kitchens, bathrooms, common areas, elev1p · 1 filing · 4 docs
Sub-BasementInterior renovation, kitchens, bathrooms, common areas, elev3p · 2 filings · 7 docs
Site & exteriorMedium duty pipe scaffolding installation13p · 3 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NHT Owners2003/21/2026
Nsacontracting607/08/2026
New Haven Rockaway103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/31/2022$45.0M—NHT OWNERS, LLC → NEW HAVEN ROCKAWAY, LLC$250/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Robert Germain Jr. PE402/08/2023
Enthink Engineers101/26/2023
Daniel R. Wapner PE112/29/2022
Aufgang Architects110/28/2022
The MTM Design Group108/04/2022
Azimuth Engineering111/09/2021
Ashraf312/09/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services103/21/2026
W J Professional Expediting Company203/21/2026
Marguerite Connelly Your Expediter103/21/2026
Danico Services603/21/2026
Biltmore Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Chateau GCGeneral Contractor407/08/2026
Gotham Communicationsspecialty_contractor407/08/2026
Gul & G ContractingScaffold303/21/2026
NY City PlumberPlumbing307/08/2026
AbileneGeneral Contractor203/21/2026
Skinner CookGeneral Contractor103/21/2026
Vertical SolutionsGeneral Contractor103/21/2026
Nadeem AkhtarScaffold107/08/2026
Reliable EnterprisesScaffold107/08/2026
Environmental ConstructionGeneral Contractor103/21/2026
Arete DevelopmentGeneral Contractor103/21/2026
Costrotta Construction MGGeneral Contractor103/21/2026
Enviornmental Construction SevrGeneral Contractor103/21/2026
Berliner CommunicationsGeneral Contractor106/11/1999
GuayacosGeneral Contractor206/06/2022
Gul & G ConstructionGeneral Contractor106/03/2016
Gul & G ContractingGeneral Contractor106/07/2017
Highland Construction AssociatesGeneral Contractor111/06/1997
Nadeem AkhtarGeneral Contractor612/02/2019
Northcoast PCS CommunicationsGeneral Contractor111/16/2001
N.S. Construction & WaterproofGeneral Contractor108/03/2010
Odyssia Global CommercialGeneral Contractor107/05/2012
RMZ ContractingGeneral Contractor106/30/2014
Sba Communiications GroupGeneral Contractor103/17/2006
Skyworx ContractingGeneral Contractor106/13/2014
Tradeline PlumbingPlumbing211/17/2010
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Robert F. Germain Jr. PE5100402/08/2023
Daniel Wapner, PE819112/29/2022
The MTM Design Group1319108/04/2022
Jeremy K McKeon, P.E.7263111/09/2021
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
08/14/2026
Elevator Category 1 inspection report filed
03/04/2026
Boiler inspection report filed
Initial · no defects · Accepted
03/04/2026
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 7X, 7th STORY, 6th APARTMENT FROM SOUTH AT WEST
HPD violation · closed
03/04/2026
§ 27-2033 ADM code provide ready access to buildings heating system at cellar story at boiler room
HPD violation · closed
234 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offChateau GC08/10/2023
DOB NOWBoiler EquipmentSigned-offNY City Plumber02/13/2023
DOB NOWBoiler EquipmentSigned-offNY City Plumber02/13/2023
DOB NOWPlumbingSigned-offNY City Plumber02/10/2023
DOB NOWGeneral ConstructionSigned-offAbilene02/10/2023
DOB NOWSidewalk ShedSigned-offReliable Enterprises01/26/2023
DOB NOWAntennaSigned-offGotham Communications12/30/2022
DOB NOWGeneral ConstructionSigned-offChateau GC11/15/2022
DOB NOWAntennaPermit IssuedGotham Communications08/11/2022
DOB NOWSupported ScaffoldPermit IssuedNadeem Akhtar08/20/2019
DOB NOWSidewalk ShedSigned-offGul & G Contracting07/20/2019
BISOTISSUEDGuayacos06/06/2022
BISOTISSUEDGuayacos06/06/2022
BISOTISSUEDNadeem Akhtar12/02/2019
BISOTISSUEDNadeem Akhtar08/29/2017
BISEQISSUEDNadeem Akhtar07/21/2017
BISEQISSUEDGul & G Contracting06/07/2017
BISOTISSUEDNadeem Akhtar06/06/2017
BISOTISSUEDNadeem Akhtar07/22/2016
BISEQISSUEDNadeem Akhtar07/11/2016
BISEQISSUEDGul & G Construction06/03/2016
BISOTISSUEDRMZ Contracting06/30/2014
BISEQISSUEDSkyworx Contracting06/13/2014
BISOTISSUEDVertical Solutions03/11/2013
BISOTISSUEDOdyssia Global Commercial07/05/2012
BISOTISSUEDCostrotta Construction MG02/09/2012
BISPLISSUEDTradeline Plumbing11/17/2010
BISOTISSUEDN.S. Construction & Waterproof08/03/2010
BISPLISSUEDTradeline Plumbing06/03/2008
BISOTISSUEDArete Development03/10/2008
BISOTISSUEDSba Communiications Group03/17/2006
BISEQISSUEDEnvironmental Construction02/01/2006
BISOTISSUEDEnviornmental Construction Sevr01/09/2006
BISEQISSUEDEnvironmental Construction10/27/2005
BISOTISSUEDNorthcoast PCS Communications11/16/2001
BISOTISSUEDSkinner & Cook03/21/2000
BISOTISSUEDSkinner & Cook12/20/1999
BISOTISSUEDBerliner Communications06/11/1999
BISMHISSUEDHighland Construction Associates11/06/1997
BISOTISSUEDHighland Construction Associates08/30/1996
8 projects · most recent 05/21/2023
General Wiring Boiler Controls
FiledStatusContractorScope
05/21/2023CompleteTuxedo Electrical Contracting—
04/13/2023CompleteAbilene ElectricBoiler Controls
01/27/2023CompleteRichard Neu—
01/19/2023CompleteAbilene Electric—
01/10/2023CompleteShelby ElectricalGeneral Wiring
12/28/2022CompleteJem Electrical ContractingGeneral Wiring
04/08/2021Permit IssuedWHYNN ElectricGeneral Wiring
07/19/2019CompleteWCK Electric—
1 project · most recent 12/09/2019
Scaffold
FiledStatusContractorScope
12/09/2019Permit IssuedNadeem AkhtarScaffold
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/25/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/26/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/27/2023Pass-Final Boiler Equipment InspectionPassView ↗
05/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
01/10/2023Fire-Resistant Penetrations and JointsRobert Germain Jr.special
01/10/2023HVAC-R and service water piping design and insulationRobert Germain Jr.energy_progress
01/10/2023HVAC-R and service water heating equipmentRobert Germain Jr.energy_progress
01/10/2023Maintenance informationRobert Germain Jr.energy_progress
01/10/2023HVAC-R and service water heating system controlsRobert Germain Jr.energy_progress
01/09/2023Fire-Resistant Penetrations and JointsRobert Germain Jr.special
01/09/2023Maintenance informationRobert Germain Jr.energy_progress
01/09/2023HVAC-R and service water heating system controlsRobert Germain Jr.energy_progress
01/09/2023HVAC-R and service water heating equipmentRobert Germain Jr.energy_progress
01/09/2023HVAC-R and service water piping design and insulationRobert Germain Jr.energy_progress
12/29/2022Tenant Protection Plan ComplianceDaniel Wapnerspecial
12/02/2022MasonryDaniel Wapnerspecial
12/02/2022Structural Stability – Alterations of existing buildingsDaniel Wapnerspecial
12/02/2022FinalDaniel Wapnerprogress
201 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account