← Back
BuildNYC
Office with commercial, 1-6 stories
22-11 43RD AVENUE
QUEENS · BIN 4005067
💬 Discuss this project
1918Year Built
4Stories
O5Building Class
M1-6AZoning
61,460 sfGross Floor Area
4Units
LL97 Covered0 Active Violations
Office with commercial, 1-6 stories · Owner of record: 23rd St Associates · 19,839 sf lot · 3.1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofWerwaiss & Co., L.tWerwaiss & Co.31p · 3 filings · 20 docs
Floor 4Werwaiss & Co., L.tWerwaiss & Co.46p · 4 filings · 20 docs
Floor 3Werwaiss & Company, INC.1p · 1 filing · 4 docs
Floor 2Werwaiss & Co.24p · 2 filings · 20 docs
Floor 11 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Werwaiss & Company8407/08/2026
Twenty Third St Realty Associates5103/21/2026
23rd Street203/22/2026
Always Best Co203/21/2026
Tri County Care103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jack Green Associates801/11/2024
Bromley Caldari Architects404/04/2023
Leon Skvirsky PE111/08/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
William Vitacco Associates2003/21/2026
Great Neck Signs Inc Dba Mineola203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cook & KrupaGeneral Contractor307/08/2026
Capitol Fire Sprinkler CoFire Protection307/08/2026
Moreair Mechanical Servicesspecialty_contractor207/08/2026
J.G.C. Plumbing & HeatingPlumbing207/08/2026
Willdan Electrical of NYElectrical203/22/2026
Premium Contracting ServicesGeneral Contractor107/08/2026
Green Power ElectricElectrical103/21/2026
Five Town Neon Sign CoSign hanger107/08/2026
Signs CadSign hanger107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jack Green Associates4221301/11/2024
Special Testing & Consulting1688204/04/2023
Building Lifecycle
All (128)Filed (13)Permit Issued (12)Signed Off (7)Violation (60)Inspection (6)Special Inspection (30)
01/26/2024
Signed off — Alteration
Q00775638-I1
01/24/2024
Signed off — Alteration
Filing for sprinkler medication at the 4th floor. No change to use, egress, or occupancy.
Q00840866-I1
01/11/2024
Filed — Alteration
Filing for sprinkler medication at the 4th floor. No change to use, egress, or occupancy.
Q00840866-P1
12/27/2023
Special inspection requirement — Sprinkler Systems
JACK GREEN
12/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
12/15/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/14/2023
Signed off — Alteration
Filing for plumbing work at the 4th Floor. No change to use, egress, or occupancy.
Q00775656-I1
12/13/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/13/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/08/2023
Signed off — Alteration
Filing for new mechanical work on the 4th floor. No change to use, egress, or occupancy.
Q00840878-I1
10/13/2023
Filed — Alteration
Filing for new mechanical work on the 4th floor. No change to use, egress, or occupancy.
Q00840878-P1
10/11/2023
Special inspection requirement — Mechanical Systems
JACK GREEN
10/11/2023
Special inspection requirement — Final
JACK GREEN
10/11/2023
Special inspection requirement — Heating Systems
JACK GREEN
09/16/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/16/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/26/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/11/2023
Permit issued — Plumbing
Q00775656-I1-PL
04/06/2023
Permit issued — General Construction
Q00775638-I1-GC
04/06/2023
Special inspection requirement — Interior lighting power
JACK GREEN
04/06/2023
Special inspection requirement — Fire-Resistance Rated Construction
SEBASTIAN SETTEDUCATE JR., P.E
04/06/2023
Special inspection requirement — Final
Jerry Caldari
04/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
04/06/2023
Special inspection requirement — Lighting controls
JACK GREEN
04/05/2023
Permit issued — Sprinklers
Q00840866-I1-EW-SP
04/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
04/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
04/04/2023
Filed — Alteration
Filing for plumbing work at the 4th Floor. No change to use, egress, or occupancy.
Q00775656-P1
04/04/2023
Filed — Alteration
Q00775638-P1
03/31/2023
Permit issued — Mechanical Systems
Q00840878-I1-MS
03/28/2023
Filed — Alteration
Filing for sprinkler medication at the 4th floor. No change to use, egress, or occupancy.
Q00840866-I1
03/28/2023
Filed — Alteration
Filing for new mechanical work on the 4th floor. No change to use, egress, or occupancy.
Q00840878-I1
03/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
03/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
03/08/2023
Special inspection requirement — Fire-Resistance Rated Construction
SEBASTIAN SETTEDUCATE JR., P.E
03/08/2023
Special inspection requirement — Final
Jerry Caldari
03/08/2023
Special inspection requirement — Interior lighting power
JACK GREEN
03/08/2023
Special inspection requirement — Lighting controls
JACK GREEN
03/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
02/01/2023
Signed off — Alteration
Standard tenant fit out, Modification of existing mechanical systems as shown on plans
Q00341268-I1
02/01/2023
Special inspection requirement — HVAC and service water heating system controls
JACK GREEN
02/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
02/01/2023
Special inspection requirement — Heating Systems
JACK GREEN
02/01/2023
Special inspection requirement — Mechanical Systems
JACK GREEN
02/01/2023
Special inspection requirement — Final
JACK GREEN
02/01/2023
Special inspection requirement — Energy Code Compliance Inspections
JACK GREEN
02/01/2023
Special inspection requirement — HVAC and service water heating equipment
JACK GREEN
02/01/2023
Special inspection requirement — Shutoff dampers
JACK GREEN
02/01/2023
Special inspection requirement — HVAC insulation and sealing
JACK GREEN
02/01/2023
Special inspection requirement — Maintenance information
JACK GREEN
01/30/2023
Filed — Alteration
Standard tenant fit out, Modification of existing mechanical systems as shown on plans
Q00341268-P2
01/26/2023
Special inspection requirement — Shutoff dampers
JACK GREEN
01/19/2023
Permit issued — Mechanical Systems
Q00341268-I1-MS
01/19/2023
Permit issued — Mechanical Systems
Q00341268-I1-MS
08/03/2022
Filed — Alteration
Standard tenant fit out, Modification of existing mechanical systems as shown on plans
Q00341268-P1
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/20/2022
Permit issued — Plumbing
Q00775656-I1-PL
07/20/2022
Permit issued — General Construction
Q00775638-I1-GC
Latest 60 of 128 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJ.G.C. Plumbing & Heating04/11/2023
DOB NOWGeneral ConstructionSigned-offCook & Krupa04/06/2023
DOB NOWSprinklersSigned-offCapitol Fire Sprinkler Co04/05/2023
DOB NOWMechanical SystemsSigned-offCook & Krupa03/31/2023
DOB NOWMechanical SystemsSigned-offMoreair Mechanical Services01/19/2023
DOB NOWMechanical SystemsSigned-offMoreair Mechanical Services01/19/2023
DOB NOWPlumbingSigned-offJ.G.C. Plumbing & Heating07/20/2022
DOB NOWGeneral ConstructionSigned-offPremium Contracting Services07/20/2022
DOB NOWSprinklersSigned-offCapitol Fire Sprinkler Co08/05/2021
DOB NOWSprinklersSigned-offCapitol Fire Sprinkler Co08/03/2020
DOB NOWSignSigned-offEnrico Passaro10/03/2019
DOB NOWSignSigned-offSigns Cad11/30/2018
BISOTISSUEDCook & Krupa03/30/2021
BISOTISSUEDCook & Krupa11/23/2020
BISOTISSUEDCook & Krupa06/11/2020
BISSPISSUEDCapitol Fire Sprinkler Co09/23/2019
BISSPISSUEDCapitol Fire Sprinkler Co05/10/2019
BISSPISSUEDCapitol Fire Sprinkler Co05/09/2019
BISPLISSUEDJ.G.C. Plumbing & Heating04/30/2019
BISMHISSUEDCook & Krupa04/22/2019
BISOTISSUEDCook & Krupa04/22/2019
BISMHISSUEDCook & Krupa12/05/2018
BISSPISSUEDAllstate Sprinkler12/03/2018
BISPLISSUEDBedrock Plumbing & Heating11/09/2018
BISMHISSUEDInterior Building Service10/25/2018
BISOTISSUEDInterior Building Service10/25/2018
BISPLISSUEDJ.G.C. Plumbing & Heating09/19/2018
BISOTISSUEDCook & Krupa09/18/2018
BISMHISSUEDCook & Krupa09/18/2018
BISSPISSUEDCapitol Fire Sprinkler Co09/11/2018
BISSPISSUEDCapitol Fire Sprinkler Co05/10/2018
BISMHISSUEDCook & Krupa05/07/2018
BISPLISSUEDJ.G.C. Plumbing & Heating03/02/2018
BISOTISSUEDCook & Krupa02/12/2018
BISOTISSUEDEC Electrical Contractor02/09/2018
BISOTISSUEDEC Electrical Contractor11/03/2017
BISMHISSUEDRand Engineering & Architecture06/16/2016
BISEQISSUEDMetro Contracting NY04/18/2016
BISOTISSUEDCook & Krupa04/12/2016
BISSPISSUEDAccurate Mechanical04/06/2016
+ 22 more permits on file
13 projects · most recent 08/10/2022
General Wiring
FiledStatusContractorScope
08/10/2022CompleteRainbow Electric Co—
05/25/2022CompleteAUR0RA Electrical ContgGeneral Wiring
05/25/2022CompleteAUR0RA Electrical ContgGeneral Wiring
05/18/2021CompleteWilldan Electrical of NYGeneral Wiring
05/17/2021CompleteWilldan Electrical of NYGeneral Wiring
05/13/2021CompleteWilldan Electrical of NY—
01/08/2020CompleteEastern Electrical ConstructionGeneral Wiring
10/30/2019CompleteEastern Electrical ConstructionGeneral Wiring
09/04/2019CompleteCitywide Electrical WiringGeneral Wiring
03/14/2019CompleteRobert S. Covello—
02/25/2019CompletePro ElectricGeneral Wiring
11/16/2018CompleteEastern Electrical ConstructionGeneral Wiring
09/27/2018CompleteEastern Electrical ConstructionGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/15/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/16/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
12/27/2023Sprinkler SystemsJACK GREENspecial
12/27/2023Fire-Resistant Penetrations and JointsJACK GREENspecial
10/11/2023Mechanical SystemsJACK GREENspecial
10/11/2023FinalJACK GREENprogress
10/11/2023Heating SystemsJACK GREENspecial
04/06/2023Interior lighting powerJACK GREENenergy_progress
04/06/2023Fire-Resistance Rated ConstructionSEBASTIAN SETTEDUCATE JR., P.Eprogress
04/06/2023FinalJerry Caldariprogress
04/06/2023Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
04/06/2023Lighting controlsJACK GREENenergy_progress
04/05/2023Fire-Resistant Penetrations and JointsJACK GREENspecial
04/05/2023HVAC-R and service water piping design and insulationJACK GREENenergy_progress
03/08/2023HVAC-R and service water piping design and insulationJACK GREENenergy_progress
03/08/2023Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
03/08/2023Fire-Resistance Rated ConstructionSEBASTIAN SETTEDUCATE JR., P.Eprogress
03/08/2023FinalJerry Caldariprogress
03/08/2023Interior lighting powerJACK GREENenergy_progress
03/08/2023Lighting controlsJACK GREENenergy_progress
03/08/2023Fire-Resistant Penetrations and JointsJACK GREENspecial
02/01/2023HVAC and service water heating system controls JACK GREENenergy_progress
02/01/2023Fire-Resistant Penetrations and JointsJACK GREENspecial
02/01/2023Heating SystemsJACK GREENspecial
02/01/2023Mechanical SystemsJACK GREENspecial
02/01/2023FinalJACK GREENprogress
02/01/2023Energy Code Compliance InspectionsJACK GREENprogress
Latest 25 of 53.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
L.tWerwaiss & CoOfficeFloor 4, Roof
Project Q00840866 Alteration · LOC Issued · 03/28/2023
Project Q00840878 Alteration · LOC Issued · 03/28/2023
Werwaiss & CoOfficeFloors 2, 4, Roof
Project Q00775638 Alteration · LOC Issued · 07/19/2022
Project Q00775656 Alteration · LOC Issued · 07/19/2022
Project Q00341268 Alteration · LOC Issued · 05/06/2020
Project Q00341271 Alteration · LOC Issued · 05/06/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 815 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch9
08/28/2026Q00089103-I1Request digital key ↗
08/26/2026Q00775656-I1Request digital key ↗
08/26/2026Q00775656-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/26/2026Q00341268-I1Request digital key ↗
08/26/2026Q00341268-P2Request digital key ↗
08/15/2026Q00341268-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/28/2026Q00341271-I1Request digital key ↗
▸Applications & Permits149
▸BISPLAN / WORK APPROVAL APPLICATION80
05/04/2020440593216Open ↗
01/14/2020421667672Open ↗
11/21/2019421738338Open ↗
Showing 3 of 80 on file for this type
▸BISWORK PERMIT APPLICATION63
06/11/2020440593216Open ↗
05/20/2019421738338Open ↗
05/02/2019421739337Open ↗
Showing 3 of 63 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Seals & Professional Certifications210
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION85
03/10/2020421692092Open ↗
12/30/2019421738338Open ↗
12/30/2019421738338Open ↗
Showing 3 of 85 on file for this type
▸DOB NOWProgress Inspector Seal & Signature31
09/30/2026Q00341268-I1Open ↗
09/30/2026Q00341268-I1Open ↗
09/30/2026Q00341268-I1Open ↗
Showing 3 of 31 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST21
05/02/2019421739337Open ↗
05/02/2019421738338Open ↗
11/19/2018421692083Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT19
05/04/2020440593216Open ↗
05/02/2019421739337Open ↗
05/02/2019421739337Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/30/2026Q00341268-I1Open ↗
09/30/2026Q00341268-I1Open ↗
09/30/2026Q00341268-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/28/2026Q00089103-I1Open ↗
08/26/2026Q00775656-I1Open ↗
08/26/2026Q00775656-P1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
05/04/2020440593216Open ↗
Showing 1 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
05/04/2020440593216Open ↗
Showing 1 of 6 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment83
▸BISSELF-CERT PLUMBING NOTICE24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE15
11/27/2019421738338Open ↗
11/21/2019421738338Open ↗
10/16/2019421738338Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISEQUIPMENT USE PERMITS11
03/10/2020421692092Open ↗
11/21/2019421739337Open ↗
08/29/2019421659306Open ↗
Showing 3 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT7
11/21/2019421739337Open ↗
08/29/2019421659306Open ↗
08/29/2019421659306Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
08/05/2025421667672Open ↗
10/03/2022421674619Open ↗
12/05/2019421739220Open ↗
Showing 3 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
12/30/2019421739220Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos49
▸BISASBESTOS: CERTIFICATION (DEP ACP5)20
05/04/2020440593216Open ↗
05/06/2019421739220Open ↗
05/02/2019421739337Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/28/2026Q00089103-I1Open ↗
08/26/2026Q00775656-I1Open ↗
08/26/2026Q00775656-P1Open ↗
Showing 3 of 13 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance66
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS32
03/10/2020421692092Open ↗
10/23/2019421692092Open ↗
10/03/2019421692092Open ↗
Showing 3 of 32 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS16
03/10/2020421692092Open ↗
10/23/2019421692092Open ↗
09/19/2019421739337Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
06/08/2020440593216Open ↗
05/04/2020440593216Open ↗
Showing 2 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
05/04/2020440593216Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00775638-I1Open ↗
08/13/2026Q00775656-I1Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/06/2022440593216Open ↗
▸BISLIGHTING CONTROLS1
04/06/2022440593216Open ↗
▸BISINTERIOR LIGHTING POWER1
04/06/2022440593216Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/06/2022440593216Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00341268-I1Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY10
04/06/2022440593216Open ↗
04/06/2022440593216Open ↗
06/08/2020440593216Open ↗
Showing 3 of 10 on file for this type
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Approvals, Objections & Sign-offs82
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST45
09/30/2025421667672Open ↗
10/05/2022421674619Open ↗
04/07/2022440593216Open ↗
Showing 3 of 45 on file for this type
▸BISADMINISTRATIVE OBJECTIONS21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISFINAL1
04/06/2022440593216Open ↗
▸Cost, Insurance & Ownership87
▸BISCOST AFFIDAVIT82
05/06/2025421667672Open ↗
05/04/2020440593216Open ↗
03/10/2020421692092Open ↗
Showing 3 of 82 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
05/08/2025421667672Open ↗
05/08/2025421667672Open ↗
08/11/2022421674619Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms57
▸BISEFILING COVER SHEET35
05/06/2019421739220Open ↗
05/02/2019421738338Open ↗
05/02/2019421739337Open ↗
Showing 3 of 35 on file for this type
▸BISADDITIONAL INFORMATION12
02/19/2020421692092Open ↗
10/30/2019421738338Open ↗
08/01/2019421659306Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
05/04/2020440593216Open ↗
Showing 1 of 6 on file for this type
▸BISBOROUGH INTAKE FORM4
05/18/2020421738338Open ↗
01/09/2019421659306Open ↗
Showing 2 of 4 on file for this type
▸Other Documents3
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type