← Back
Two family converted from one family
22-14 RYAN STREET
QUEENS · Murray Hill-Broadway Flushing · BIN 4105034
💬 Discuss this project
1940Year Built
2Stories
B3Building Class
R3AZoning
2,690 sfGross Floor Area
2Units
0 Open Violations
Two family converted from one family · 4,600 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof1p · 1 filing · 20 docs
Floor 21p · 2 filings · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar4p · 3 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIKE TECH ASSOCIATES LLC711/13/2023
HAYM S. GROSS, ARCHITECT208/23/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BRITZ ENTERPRISES INC.1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITY BUILDING CONSULTANTSGeneral Contractor903/21/2026
M. BONILLA LANDSCAPING INGeneral Contractor507/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RIKE TECH ASSOCIATES LLC2965607/12/2023
Building Lifecycle
All (81)Filed (9)Permit Issued (8)Signed Off (3)Violation (1)Inspection (6)Objection (24)Special Inspection (30)
05/12/2025
Signed off — Alteration
2nd floor enlargement; relocate bathrooms, kitchens thru out existing 2 family dwelling.
Q00459263-I1
03/10/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/06/2025
Signed off — Alteration
temp. const.fence 8' high max.
Q00460120-I1
07/29/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/07/2024
Signed off — Alteration
application filed for plumbing work thru out; cellar,.001,002.
Q00460123-I1
11/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
HAYM GROSS
11/28/2023
Special inspection requirement — Energy Code Compliance Inspections
HAYM GROSS
11/13/2023
Filed — Alteration
application filed for plumbing work thru out; cellar,.001,002.
Q00460123-P3
08/03/2023
Permit issued — Plumbing
Q00460123-I1-PL
07/12/2023
Filed — Alteration
application filed for plumbing work thru out; cellar,.001,002.
Q00460123-P2
06/22/2023
Special inspection requirement — Energy Code Compliance Inspections
SYED RIZVI
06/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
SYED RIZVI
06/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SYED RIZVI
06/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
SYED RIZVI
06/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
06/22/2023
Special inspection requirement — Energy Code Compliance
SYED RIZVI
05/09/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/19/2023
Permit issued — General Construction
Q00459263-I1-GC
02/17/2023
Objection resolved — Addressed
02/17/2023
Objection resolved — Addressed
02/17/2023
Objection resolved — Addressed
02/17/2023
Objection resolved — Addressed
02/17/2023
Objection resolved — Addressed
02/15/2023
Special inspection requirement — Fenestration air leakage
SYED RIZVI
02/15/2023
Special inspection requirement — Lighting in dwelling units
SYED RIZVI
02/15/2023
Special inspection requirement — Lighting controls
SYED RIZVI
02/15/2023
Special inspection requirement — Fenestration areas
SYED RIZVI
02/15/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
SYED RIZVI
02/15/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SYED RIZVI
02/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
02/15/2023
Special inspection requirement — Concrete - Cast-In-Place
SYED RIZVI
02/15/2023
Special inspection requirement — Masonry
SYED RIZVI
02/15/2023
Special inspection requirement — Energy Code Compliance
SYED RIZVI
02/15/2023
Special inspection requirement — Fire-Resistance Rated Construction
SYED RIZVI
02/15/2023
Special inspection requirement — Energy Code Compliance Inspections
SYED RIZVI
02/14/2023
Objection raised — Admin
02/14/2023
Objection raised — Admin
02/14/2023
Objection raised — Other
02/14/2023
Objection raised — Inspections
02/13/2023
Objection raised — Mechanical
02/09/2023
Filed — Alteration
application filed for plumbing work thru out; cellar,.001,002.
Q00460123-P1
02/09/2023
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
02/08/2023
Filed — Alteration
2nd floor enlargement; relocate bathrooms, kitchens thru out existing 2 family dwelling.
Q00459263-P1
01/20/2023
Special inspection requirement — Lighting in dwelling units
SYED RIZVI
01/20/2023
Special inspection requirement — Energy Code Compliance
SYED RIZVI
01/20/2023
Special inspection requirement — Energy Code Compliance Inspections
SYED RIZVI
01/20/2023
Special inspection requirement — Fire-Resistance Rated Construction
SYED RIZVI
01/20/2023
Special inspection requirement — Fenestration air leakage
SYED RIZVI
01/20/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
SYED RIZVI
01/20/2023
Special inspection requirement — Lighting controls
SYED RIZVI
01/20/2023
Special inspection requirement — Fenestration areas
SYED RIZVI
01/20/2023
Special inspection requirement — Concrete - Cast-In-Place
SYED RIZVI
01/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
07/19/2022
Permit issued — Plumbing
Q00460123-I1-PL
06/02/2022
Permit issued — Construction Fence
Q00460120-I1-FN
06/02/2022
Permit issued — General Construction
Q00459263-I1-GC
05/24/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2022
Permit issued — General Construction
Q00459263-I1-GC
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT08/03/2023
DOB NOWGeneral ConstructionSigned-offM. BONILLA LANDSCAPING IN04/19/2023
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT07/19/2022
DOB NOWConstruction FenceSigned-offM. BONILLA LANDSCAPING IN06/02/2022
DOB NOWGeneral ConstructionSigned-offM. BONILLA LANDSCAPING IN06/02/2022
DOB NOWGeneral ConstructionSigned-offCITY BUILDING CONSULTANTS04/06/2022
DOB NOWGeneral ConstructionSigned-offCITY BUILDING CONSULTANTS12/10/2021
DOB NOWConstruction FenceSigned-offCITY BUILDING CONSULTANTS11/19/2021
BISOTISSUEDSUNRUN INSTALLATION SVC10/08/2018
BISOTISSUEDSUNRUN INSTALLATION SVC09/24/2018
2 projects · most recent 02/15/2023
General Wiring
FiledStatusContractorScope
02/15/2023CompletePRINCIPAL ELECTRICAL CORPGeneral Wiring
09/25/2018CompleteSUNRUN SOLAR ELECTL CORP—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/10/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/29/2024Fail-Final General Construction Non-Directive 14FailView ↗
05/09/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/09/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/09/2023Pass-Final Fence Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
11/28/2023HVAC-R and service water heating equipmentHAYM GROSSenergy_progress
11/28/2023Energy Code Compliance InspectionsHAYM GROSSprogress
06/22/2023Energy Code Compliance InspectionsSYED RIZVIprogress
06/22/2023HVAC-R and service water heating system controlsSYED RIZVIenergy_progress
06/22/2023HVAC-R and service water piping design and insulationSYED RIZVIenergy_progress
06/22/2023HVAC-R and service water heating equipmentSYED RIZVIenergy_progress
06/22/2023Fire-Resistant Penetrations and JointsSYED RIZVIspecial
06/22/2023Energy Code ComplianceSYED RIZVIprogress
02/15/2023Fenestration air leakageSYED RIZVIenergy_progress
02/15/2023Lighting in dwelling unitsSYED RIZVIenergy_progress
02/15/2023Lighting controlsSYED RIZVIenergy_progress
02/15/2023Fenestration areasSYED RIZVIenergy_progress
02/15/2023Fenestration and door U-factor and product ratingsSYED RIZVIenergy_progress
02/15/2023Structural Stability – Alterations of existing buildingsSYED RIZVIspecial
02/15/2023Fire-Resistant Penetrations and JointsSYED RIZVIspecial
02/15/2023Concrete - Cast-In-PlaceSYED RIZVIspecial
02/15/2023MasonrySYED RIZVIspecial
02/15/2023Energy Code ComplianceSYED RIZVIprogress
02/15/2023Fire-Resistance Rated ConstructionSYED RIZVIprogress
02/15/2023Energy Code Compliance InspectionsSYED RIZVIprogress
01/20/2023Lighting in dwelling unitsSYED RIZVIenergy_progress
01/20/2023Energy Code ComplianceSYED RIZVIprogress
01/20/2023Energy Code Compliance InspectionsSYED RIZVIprogress
01/20/2023Fire-Resistance Rated ConstructionSYED RIZVIprogress
01/20/2023Fenestration air leakageSYED RIZVIenergy_progress
Latest 25 of 39.
▾Documents — 86 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch - Plumbing4
08/25/2026Q00460123-P3Request digital key ↗
08/25/2026Q00460123-I1Request digital key ↗
08/25/2026Q00460123-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
08/27/2026Q00459263-P1Request digital key ↗
08/15/2026Q00459263-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/14/2026Q00460120-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/14/2026Q00502179-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/27/2026Q00460756-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
09/21/2018440510822Open ↗
▸BISWORK PERMIT APPLICATION1
09/21/2018440510822Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWRestrictive Declaration/Easement 14
08/25/2026Q00460123-I1Open ↗
08/25/2026Q00460123-P2Open ↗
08/15/2026Q00460123-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00459263-I1Open ↗
08/13/2026Q00459263-P1Open ↗
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026Q00459263-I1Open ↗
09/02/2026Q00459263-I1Open ↗
08/29/2026Q00460123-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026Q00459263-P1Open ↗
08/27/2026Q00459263-I1Open ↗
08/27/2026Q00460756-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026Q00459263-I1Open ↗
08/29/2026Q00460123-P1Open ↗
08/28/2026Q00460123-P2Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/21/2018440510822Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/21/2018440510822Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/21/2018440510822Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
09/21/2018440510822Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00502179-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/27/2026Q00459263-P1Open ↗
08/27/2026Q00460756-I1Open ↗
08/25/2026Q00460123-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/21/2018440510822Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/04/2019440510822Open ↗
09/21/2018440510822Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00460123-I1Open ↗
08/13/2026Q00459263-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/04/2019440510822Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
01/04/2019440510822Open ↗
▸BISNYCECC ANALYSIS1
09/21/2018440510822Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
09/21/2018440510822Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/21/2018440510822Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/04/2019440510822Open ↗
09/21/2018440510822Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/04/2019440510822Open ↗
09/21/2018440510822Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
01/04/2019440510822Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/04/2019440510822Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/04/2019440510822Open ↗
09/21/2018440510822Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
12/11/2018440510822Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/21/2018440510822Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/13/2026Q00459263-I1Open ↗
08/13/2026Q00459263-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00459263-P1Open ↗
08/13/2026Q00459263-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00459263-I1Open ↗
08/13/2026Q00459263-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00502179-I1Open ↗