← Back
Single or multiple dwelling with stores or offices
22-24 COLLEGE POINT BLVD
QUEENS · College Point · BIN 4099500
💬 Discuss this project
2021Year Built
3Stories
S9Building Class
R5BZoning
5,517 sfGross Floor Area
4Units
0 Open ViolationsFDNY Report ↗
Single or multiple dwelling with stores or offices · 2,500 sf lot · 2.21 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Roof4p · 2 filings · 20 docs
Bulkhead2p · 1 filing · 4 docs
Floor 41p · 1 filing · 4 docs
Floor 32p · 2 filings · 17 docs
Floor 21p · 1 filing · 4 docs
Floor 12p · 1 filing · 4 docs
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CYC GENERAL CONTRACTING1007/08/2026
GYC GENERAL CONTRACTING103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TAN ARCHITECT P.C1009/12/2022
SH ENGINEERING PLLC209/12/2022
KZ ENGINEERING, P.C207/20/2021
STROH ENGINEERING SERVICES, P.C.107/08/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CHANG HWA TAN203/21/2026
EXPEDITE DEM203/21/2026
SYNERGY BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CYC GENERAL CONTRACTINGGeneral Contractor1707/08/2026
CASE PLUMBING LLCFire Protection207/08/2026
CATMAN PLUMBING INCPlumbing207/08/2026
CS BRIDGE CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Z & T ENGINEERING, P.C.591709/12/2022
Building Lifecycle
All (89)Filed (15)Permit Issued (11)Signed Off (8)Violation (9)Inspection (6)Objection (10)Special Inspection (30)
11/03/2022
Signed off — Alteration
installation of new plumbing for 3 story mixed use building
Q00266213-I1
10/28/2022
Signed off — Alteration
INSTALLATION OF SPRINKLER SYSTEM TO NEW BUILDING AND NEED NEW WATER SERVICE STREET CONNECTION
Q00306979-I1
10/05/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/30/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/29/2022
Signed off — Alteration
installation of split system and baseboard hot water heating system for (1) commercial , (1) community facility, and (2) dwelling units
Q00265503-I1
09/29/2022
Signed off — Alteration
INSTALLATION OF NEW 12'-0" CURBCUT INCLUDING (2) 1'-6" SPLAYS.
Q00306756-I1
09/28/2022
Signed off — Alteration
STRUCTURE
Q00266294-I1
09/28/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/27/2022
Signed off — Alteration
Install New Boiler for Retail Store on first floor and Apartment Units on Second and Third Floor.
Q00780882-I1
09/26/2022
Signed off — Alteration
Q00169966-I1
09/20/2022
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00549746-I1
09/20/2022
Permit issued — Structural
Q00266294-I1-ST
09/20/2022
Permit issued — Sprinklers
Q00306979-I1-EW-SP
09/13/2022
Special inspection requirement — Maintenance information
Fei Zeng
09/13/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Fei Zeng
09/13/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fei Zeng
09/13/2022
Special inspection requirement — Heating Systems
Fei Zeng
09/13/2022
Special inspection requirement — HVAC-R and service water heating system controls
Fei Zeng
09/13/2022
Special inspection requirement — HVAC-R and service water heating equipment
Fei Zeng
09/12/2022
Filed — Alteration
Install New Boiler for Retail Store on first floor and Apartment Units on Second and Third Floor.
Q00780882-P1
09/12/2022
Filed — Alteration
STRUCTURE
Q00266294-P1
09/08/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/07/2022
Permit issued — Mechanical Systems
Q00265503-I1-MS
09/02/2022
Permit issued — Boiler Equipment
Q00780882-I1-BE
08/09/2022
Permit issued — Curb Cut
Q00306756-I1-CC
08/01/2022
Special inspection requirement — Electrical motors
Fei Zeng
08/01/2022
Special inspection requirement — Maintenance information
Fei Zeng
08/01/2022
Special inspection requirement — Electrical energy consumption
Fei Zeng
07/27/2022
Objection raised — Admin
07/27/2022
Objection resolved — Addressed
07/27/2022
Objection raised — Energy
07/27/2022
Objection resolved — Addressed
07/27/2022
Objection raised — Structural
07/27/2022
Objection resolved — Addressed
07/26/2022
Filed — Alteration
Install New Boiler for Retail Store on first floor and Apartment Units on Second and Third Floor.
Q00780882-I1
07/26/2022
Filed — Alteration
installation of new plumbing for 3 story mixed use building
Q00266213-P4
07/26/2022
Special inspection requirement — Electrical motors
Fei Zeng
07/26/2022
Special inspection requirement — Maintenance information
Fei Zeng
07/26/2022
Special inspection requirement — Electrical energy consumption
Fei Zeng
06/22/2022
Filed — Alteration
installation of new plumbing for 3 story mixed use building
Q00266213-P3
06/02/2022
Special inspection requirement — Electrical energy consumption
Fei Zeng
06/02/2022
Special inspection requirement — Maintenance information
Fei Zeng
06/02/2022
Special inspection requirement — Electrical motors
Fei Zeng
02/25/2022
Special inspection requirement — HVAC and service water heating system controls
Fei Zeng
02/25/2022
Special inspection requirement — HVAC and service water heating equipment
Fei Zeng
02/25/2022
Special inspection requirement — HVAC insulation and sealing
Fei Zeng
02/10/2022
Violation issued (ECB, closed)
Unknown
02/10/2022
Violation issued (ECB, closed)
Unknown
02/09/2022
Violation issued (ECB, closed)
Unknown
01/07/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/07/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/05/2022
Special inspection requirement — Sprinkler Systems
Fei Zeng
12/23/2021
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM TO NEW BUILDING AND NEED NEW WATER SERVICE STREET CONNECTION
Q00306979-P1
12/23/2021
Filed — Alteration
installation of new plumbing for 3 story mixed use building
Q00266213-P1
12/22/2021
Special inspection requirement — Sprinkler Systems
Fei Zeng
11/08/2021
Special inspection requirement — Electrical motors
Fei Zeng
11/08/2021
Special inspection requirement — Electrical energy consumption
Fei Zeng
11/08/2021
Special inspection requirement — Maintenance information
Fei Zeng
08/20/2021
Violation issued (ECB, closed)
Construction
08/20/2021
Violation issued (ECB, closed)
Construction
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offCYC GENERAL CONTRACTING09/20/2022
DOB NOWSprinklersSigned-offS & L PLUMBING INC09/20/2022
DOB NOWMechanical SystemsSigned-offCYC GENERAL CONTRACTING09/07/2022
DOB NOWBoiler EquipmentSigned-offCATMAN PLUMBING INC09/02/2022
DOB NOWCurb CutSigned-offCYC GENERAL CONTRACTING08/09/2022
DOB NOWSprinklersSigned-offS & L PLUMBING INC08/13/2021
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC08/09/2021
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP07/06/2021
DOB NOWConstruction FenceSigned-offCYC GENERAL CONTRACTING03/01/2021
DOB NOWConstruction FenceSigned-offCYC GENERAL CONTRACTING05/19/2020
DOB NOWConstruction FenceSigned-offCYC GENERAL CONTRACTING07/09/2019
BIS—ISSUEDCYC GENERAL CONTRACTING03/28/2022
BIS—ISSUEDCYC GENERAL CONTRACTING03/28/2022
BIS—ISSUEDCYC GENERAL CONTRACTING11/07/2021
BIS—ISSUEDCYC GENERAL CONTRACTING11/07/2021
BIS—ISSUEDCYC GENERAL CONTRACTING10/26/2020
BIS—ISSUEDCYC GENERAL CONTRACTING10/22/2020
BIS—RE-ISSUEDNY DRILLING INC07/10/2019
2 projects · most recent 08/25/2021
General Wiring
FiledStatusContractorScope
08/25/2021CompleteKJK ELECTRIC INCGeneral Wiring
06/30/2021CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/05/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/30/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/28/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
09/08/2022Pass-Final Boiler Equipment InspectionPassView ↗
01/07/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/07/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
09/13/2022Maintenance informationFei Zengenergy_progress
09/13/2022HVAC-R and service water piping design and insulationFei Zengenergy_progress
09/13/2022Fire-Resistant Penetrations and JointsFei Zengspecial
09/13/2022Heating SystemsFei Zengspecial
09/13/2022HVAC-R and service water heating system controlsFei Zengenergy_progress
09/13/2022HVAC-R and service water heating equipmentFei Zengenergy_progress
08/01/2022Electrical motorsFei Zengenergy_progress
08/01/2022Maintenance informationFei Zengenergy_progress
08/01/2022Electrical energy consumptionFei Zengenergy_progress
07/26/2022Electrical motorsFei Zengenergy_progress
07/26/2022Maintenance informationFei Zengenergy_progress
07/26/2022Electrical energy consumptionFei Zengenergy_progress
06/02/2022Electrical energy consumptionFei Zengenergy_progress
06/02/2022Maintenance informationFei Zengenergy_progress
06/02/2022Electrical motorsFei Zengenergy_progress
02/25/2022HVAC and service water heating system controls Fei Zengenergy_progress
02/25/2022HVAC and service water heating equipment Fei Zengenergy_progress
02/25/2022HVAC insulation and sealing Fei Zengenergy_progress
01/05/2022Sprinkler SystemsFei Zengspecial
12/22/2021Sprinkler SystemsFei Zengspecial
11/08/2021Electrical motorsFei Zengenergy_progress
11/08/2021Electrical energy consumptionFei Zengenergy_progress
11/08/2021Maintenance informationFei Zengenergy_progress
07/22/2021FinalKarol Zdancewiczprogress
11/15/2019Electrical motorsFei Zengenergy_progress
Latest 25 of 32.
▾Documents — 186 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch - Plumbing4
08/26/2026Q00266213-I1Request digital key ↗
08/26/2026Q00266213-P4Request digital key ↗
08/26/2026Q00266213-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch4
08/27/2026Q00549746-I1Request digital key ↗
08/27/2026Q00549746-P1Request digital key ↗
08/26/2026Q00780882-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
08/28/2026Q00306979-I1Request digital key ↗
08/15/2026Q00306979-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/25/2026Q00266294-I1Request digital key ↗
08/15/2026Q00266294-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/14/2026Q00265503-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00169966-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/28/2026Q00306756-I1Request digital key ↗
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION10
12/09/2022421743858Open ↗
11/28/2022440601671Open ↗
10/21/2022421743858Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION4
11/19/2020421743858Open ↗
11/19/2020421743858Open ↗
10/26/2020421743858Open ↗
Showing 3 of 4 on file for this type
▸BISCertificate Of Occupancy Application1
08/31/2022421743858Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISVERIFY TAX LOT1
09/27/2022421743858Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
07/31/2019421743858Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/27/2022421743858Open ↗
▸BISZONING DIAGRAM1
01/31/2020421743858Open ↗
▸Seals & Professional Certifications51
▸DOB NOWProgress Inspector Seal & Signature27
09/23/2026Q00780882-I1Open ↗
09/23/2026Q00780882-I1Open ↗
09/23/2026Q00780882-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/28/2026Q00169966-I1Open ↗
08/28/2026Q00306979-I1Open ↗
08/28/2026Q00306979-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026Q00780882-I1Open ↗
09/23/2026Q00780882-I1Open ↗
09/02/2026Q00306979-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/18/2019421661339Open ↗
07/29/2019421661339Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/27/2020440601671Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/27/2020440601671Open ↗
▸Trade Schedules & Equipment4
▸BISSprinkler Systems1
09/27/2022421743858Open ↗
▸BISHvac Service Water Heating Equipment1
09/27/2022421743858Open ↗
▸BISHvac Service Water Heating System Controls1
09/27/2022421743858Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
07/26/2019421661339Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE SIGNOFF2
09/27/2022421743858Open ↗
09/10/2022421793884Open ↗
▸BISSTREET TREES SITE PLAN2
09/27/2022421743858Open ↗
09/10/2022421793884Open ↗
▸BISSTREET TREE CHECKLIST2
02/19/2020421793884Open ↗
07/31/2019421743858Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
07/26/2019421661339Open ↗
▸Energy Compliance16
▸BISTechnical Report Energy Code Progress Insps3
11/25/2020421743858Open ↗
11/21/2019421743858Open ↗
07/31/2019421743858Open ↗
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026Q00266213-I1Open ↗
08/13/2026Q00265503-I1Open ↗
08/13/2026Q00780882-I1Open ↗
▸BISFenestration Air Leakage1
09/27/2022421743858Open ↗
▸BISAir Sealing And Insulation Testing1
09/27/2022421743858Open ↗
▸BISLighting In Dwelling Units1
09/27/2022421743858Open ↗
▸BISExterior Lighting Power1
09/27/2022421743858Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/27/2020440601671Open ↗
▸BISFenestration Areas1
09/27/2022421743858Open ↗
▸BISInsulation Placement R Values1
09/27/2022421743858Open ↗
▸BISAs Built Energy Analysis En21
09/27/2022421743858Open ↗
▸BISEnergy Code Compliance Inspections1
09/27/2022421743858Open ↗
▸BISAir Sealing And Insulation Visual1
09/27/2022421743858Open ↗
▸Inspections & Test Reports23
▸BISTechnical Report Responsibility Certification5
11/25/2020421743858Open ↗
11/25/2020421743858Open ↗
11/25/2020421743858Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY4
07/27/2020440601671Open ↗
07/27/2020440601671Open ↗
06/04/2021421743858Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
11/25/2020421743858Open ↗
11/25/2020421743858Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
07/27/2020440601671Open ↗
09/09/2019421743858Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
09/27/2022421743858Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
10/24/2022421743858Open ↗
▸BISWall Panels Curtain Walls And Veneers1
09/27/2022421743858Open ↗
▸BISStructural Steel Welding1
09/27/2022421743858Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
09/27/2022421743858Open ↗
▸BISMechanical Systems1
09/27/2022421743858Open ↗
▸BISDemolition Dm Job Signoff1
09/27/2022421743858Open ↗
▸BISStructural Steel Details1
09/27/2022421743858Open ↗
▸BISStructural Steel High Strength Bolting1
09/27/2022421743858Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
09/27/2022421743858Open ↗
▸Approvals, Objections & Sign-offs14
▸BISLETTERS - SUPPORTING DOCUMENTATION8
02/19/2020421793884Open ↗
07/29/2019421661339Open ↗
07/29/2019421661339Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
03/09/2022421743858Open ↗
02/11/2020421743858Open ↗
07/31/2019421743858Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
07/26/2019421661339Open ↗
▸BISLANDMARKS APPROVAL1
07/26/2019421661339Open ↗
▸BISSustainable Roof Zone Form Signoff1
10/11/2022421743858Open ↗
▸Cost, Insurance & Ownership4
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE2
07/29/2019421661339Open ↗
07/29/2019421661339Open ↗
▸BISCOST AFFIDAVIT1
07/27/2020440601671Open ↗
▸BISProject Specific Gl Insurance1
11/25/2020421743858Open ↗
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION4
12/19/2022421743858Open ↗
12/13/2022421743858Open ↗
03/31/2022421743858Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
08/19/2019421793884Open ↗
07/31/2019421743858Open ↗
11/26/2018421661339Open ↗
▸BISBOROUGH INTAKE FORM2
11/19/2020421743858Open ↗
11/19/2020421743858Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/19/2020421793884Open ↗
▸Other Documents5
▸BISPLOT DIAGRAM2
09/27/2022421743858Open ↗
07/31/2019421743858Open ↗
▸BISFire Resistive Rated Construction1
09/27/2022421743858Open ↗
▸BISDetector Smoke Cert Of Installation1
12/13/2022421743858Open ↗
▸BISMaintenance Information1
09/27/2022421743858Open ↗