← Back
Miscellaneous two family
22 3 PLACE
BROOKLYN · BIN 3005340
💬 Discuss this project
1899Year Built
2Stories
B9Building Class
R6BZoning
2,208 sfGross Floor Area
2Units
Miscellaneous two family · 1,700 sf lot · 1.3 FAR built · Flood zone X
Locations of Work
Architecture
Floor 25p · 1 filing · 20 docs
Floor 15p · 1 filing · 20 docs
Cellar5p · 1 filing · 20 docs
Basement4p · 1 filing · 20 docs
2 jobs · most recent 08/12/2024
General Wiring HVAC Wiring
FiledStatusContractorScope
08/12/2024CompleteSUNBIRD ELECTRICAL CONTRGeneral Wiring
03/11/2023CompleteSUNBIRD ELECTRICAL CONTRGeneral Wiring, HVAC Wiring
Building Lifecycle
All (36)Filed (6)Permit Issued (4)Signed Off (3)Inspection (7)Objection (8)Special Inspection (8)
01/03/2025
Signed off — Alteration
RENOVATION OF KITCHEN AND BATHROOM ON 1ST FLOOR AS PER PLANS.
B01065298-I1
12/24/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/20/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/17/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/24/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/28/2024
Permit issued — Plumbing
B01065298-I1-PL
06/13/2024
Filed — Alteration
RENOVATION OF KITCHEN AND BATHROOM ON 1ST FLOOR AS PER PLANS.
B01065298-I1
05/23/2024
Special inspection requirement — Interior lighting power
Vicente Varela
05/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
Vicente Varela
05/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Vicente Varela
05/23/2024
Special inspection requirement — Lighting controls
Vicente Varela
05/15/2024
Filed — Alteration CO
APPLICATION FILED TO CONVERT FROM 2 TO 1 FAMILY DWELLING. REMOVE 1 KITCHEN ON 2ND FLOOR AND ADD 1 BEDROOM AS PER PLANS.
B00910891-P2
05/10/2024
Special inspection requirement — Energy Code Compliance Inspections
Vicente Varela
05/10/2024
Special inspection requirement — Fire-Resistance Rated Construction
Vicente Varela
05/10/2024
Special inspection requirement — Lighting controls
Vicente Varela
05/10/2024
Special inspection requirement — Interior lighting power
Vicente Varela
04/23/2024
Objection resolved — Addressed
03/15/2024
Objection resolved — Addressed
03/15/2024
Objection resolved — Addressed
02/16/2024
Objection raised — Scope
02/16/2024
Objection raised — Cost
02/02/2024
Objection raised — Scope
01/26/2024
Filed — Alteration CO
APPLICATION FILED TO CONVERT FROM 2 TO 1 FAMILY DWELLING. REMOVE 1 KITCHEN ON 2ND FLOOR AND ADD 1 BEDROOM AS PER PLANS.
B00910891-P1
10/26/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/27/2023
Signed off — Alteration
MINOR WORK ON 1ST FLOOR. INTERIOR RENOVATION ON 2ND FLOOR TO RELOCATE BATHROOM AND KITCHEN AS PER PLANS. REPLACE FLOORING, WALLS, AND FINISHES.
B00821916-I1
09/14/2023
Permit issued — General Construction
B00910891-I1-GC
09/12/2023
Signed off — Alteration
MINOR WORK ON 1ST FLOOR. INTERIOR RENOVATION ON 2ND FLOOR TO RELOCATE BATHROOM AND KITCHEN AS PER PLANS. REPLACE FLOORING, WALLS, AND FINISHES.
B00821916-S1
09/07/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/01/2023
Objection resolved — Addressed
08/21/2023
Objection raised — Scope
08/16/2023
Filed — Alteration CO
APPLICATION FILED TO CONVERT FROM 2 TO 1 FAMILY DWELLING. REMOVE 1 KITCHEN ON 2ND FLOOR AND ADD 1 BEDROOM AS PER PLANS.
B00910891-I1
04/18/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/08/2023
Permit issued — Plumbing
B00821916-S1-PL
03/06/2023
Filed — Alteration
MINOR WORK ON 1ST FLOOR. INTERIOR RENOVATION ON 2ND FLOOR TO RELOCATE BATHROOM AND KITCHEN AS PER PLANS. REPLACE FLOORING, WALLS, AND FINISHES.
B00821916-S1
02/15/2023
Permit issued — General Construction
B00821916-I1-GC
02/10/2023
Filed — Alteration
MINOR WORK ON 1ST FLOOR. INTERIOR RENOVATION ON 2ND FLOOR TO RELOCATE BATHROOM AND KITCHEN AS PER PLANS. REPLACE FLOORING, WALLS, AND FINISHES.
B00821916-I1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/29/2022$2.9M—Private party → Private party$1,332/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARQUITECTURA VARELA606/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L & J DESIGN GROUP1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GOWANUS CUSTOM INS LLCGeneral Contractor403/21/2026
ASPECT PLBNG&HTNG CO LLCPlumbing207/08/2026
SUNBIRD ELECTRICAL CONTRElectrical103/22/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offASPECT PLBNG&HTNG CO LLC06/28/2024
DOB NOWGeneral ConstructionPermit IssuedGOWANUS CUSTOM INS LLC09/14/2023
DOB NOWPlumbingSigned-offASPECT PLBNG&HTNG CO LLC03/08/2023
DOB NOWGeneral ConstructionSigned-offGOWANUS CUSTOM INS LLC02/15/2023
BISPLISSUEDJOHN HLAD P & H CO., INC09/30/2014
BISMHISSUEDALL HVAC SERVICE CO. INC11/07/2013
BISPLISSUEDJOHN HLAD P & H CO., INC07/23/2013
BISPLISSUEDJOHN HLAD P & H CO., INC08/31/2012
BISOTISSUEDIFTE CONSTRACTING CORP04/24/2009
BISOTISSUEDIFTE CONST CORP05/21/2008
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/17/2024Fail-Final CND-Occupancy InspectionFailView ↗
07/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/26/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
05/23/2024Interior lighting powerVicente Varelaenergy_progress
05/23/2024Fire-Resistance Rated ConstructionVicente Varelaprogress
05/23/2024Energy Code Compliance InspectionsVicente Varelaprogress
05/23/2024Lighting controlsVicente Varelaenergy_progress
05/10/2024Energy Code Compliance InspectionsVicente Varelaprogress
05/10/2024Fire-Resistance Rated ConstructionVicente Varelaprogress
05/10/2024Lighting controlsVicente Varelaenergy_progress
05/10/2024Interior lighting powerVicente Varelaenergy_progress
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026B00821916-S1Request digital key ↗
08/27/2026B00821916-I1Request digital key ↗
08/25/2026B00910891-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00910891-I1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature8
08/28/2026B00910891-I1Open ↗
08/28/2026B00910891-I1Open ↗
08/28/2026B00910891-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026B00821916-S1Open ↗
08/27/2026B00821916-I1Open ↗
08/13/2026B00910891-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist3
08/13/2026B00910891-P2Open ↗
08/13/2026B00910891-P1Open ↗
08/13/2026B00910891-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00910891-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00910891-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026B00821916-S1Open ↗
08/27/2026B00821916-I1Open ↗
08/13/2026B00910891-P2Open ↗
Showing 3 of 6 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/13/2026B00910891-P2Open ↗
08/13/2026B00910891-P1Open ↗
08/13/2026B00910891-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00910891-I1Open ↗