← Back
BuildNYC
Three families
22-30 75TH STREET
QUEENS · BIN 4021857
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R4Zoning
2,079 sfGross Floor Area
3Units
Rent Stabilized1 Active Violation ▸FDNY Report ↗
Three families · 4,000 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 2Plumbing fixture replacementUnder Construction2p · 3 filings · 20 docs
Floor 1Plumbing fixture replacementUnder Construction1p · 3 filings · 20 docs
CellarToilet room and kitchen finishes1 filing · 18 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/10/2025$1.3M—— → —$625/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Angelos Georgopoulos109/18/2026
Vincent J. Liotta P.E409/08/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
David B Nicholson RA203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TPG ContractingGeneral Contractor210/20/2026
Aqueduct MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Angelos Georgopoulos2955109/18/2026
Vincent J. Liotta P. E1974103/13/2026
Building Lifecycle
All (41)Filed (5)Permit Issued (3)Violation (3)Objection (7)Special Inspection (23)
10/19/2026
Permit issued — General Construction
Q01371109-I1-GC
09/21/2026
Objection raised — Other
09/21/2026
Objection raised — Cost
09/18/2026
Filed — Alteration CO
Addition of 2 balconies on 2nd floor, sistering of joists on all floors.
Q01445539-S1
09/11/2026
Objection raised — Other
09/11/2026
Objection raised — Other
09/11/2026
Objection raised — Site survey detailing building
09/11/2026
Objection raised — Other
09/11/2026
Objection raised — Admin
09/08/2026
Filed — Alteration CO
Addition of 2 balconies on 2nd floor, sistering of joists on all floors.
Q01445539-S2
09/08/2026
Filed — Alteration CO
Addition of 2 balconies on 2nd floor, sistering of joists on all floors.
Q01445539-I1
09/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
09/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
09/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/26/2026
Special inspection requirement — Structural Steel - Welding
Angelos Georgopoulos
08/26/2026
Special inspection requirement — Structural Steel - Details
Angelos Georgopoulos
08/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Angelos Georgopoulos
08/26/2026
Special inspection requirement — Post-installed Anchors
Angelos Georgopoulos
08/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Angelos Georgopoulos
08/26/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Angelos Georgopoulos
08/26/2026
Special inspection requirement — Final
Angelos Georgopoulos
08/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/14/2026
Special inspection requirement — Ventilation and air distribution system
08/14/2026
Special inspection requirement — Maintenance information
08/14/2026
Special inspection requirement — Air barrier - visual inspection
08/14/2026
Special inspection requirement — Permanent certificate
08/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/13/2026
Special inspection requirement — Mechanical Systems
08/13/2026
Special inspection requirement — Final
05/26/2026
Permit issued — General Construction
Q01371109-I1-GC
05/06/2026
Violation issued (HPD, open)
A
03/18/2026
Permit issued — Plumbing
Q01371146-I1-PL
03/13/2026
Filed — Alteration
Remove and replace existing plumbing fixtures with new, same location. No chance in use, egress or occupancy under this application
Q01371146-I1
03/13/2026
Filed — Alteration
Interior renovation of the two (2) story, three (3) family house, by installing new finish materials on floors, walls and ceilings, as per plans. No chance in use,egress or occupancy, under this application.
Q01371109-I1
03/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vincent Liotta
03/12/2026
Special inspection requirement — Interior lighting power
Vincent Liotta
03/12/2026
Special inspection requirement — Final
Vincent Liotta
06/10/1988
Violation issued (HPD, closed)
C
09/10/1985
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTPG Contracting10/19/2026
DOB NOWGeneral ConstructionPermit IssuedTPG Contracting05/26/2026
DOB NOWPlumbingPermit IssuedAqueduct Mechanical03/18/2026
1 project · most recent 09/18/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/18/2026——Air Conditioning Systems
Cooling
Mitsubishi Electric MUZ-FX18NLHZ 18,000 BTU · Condensing Unit ×1
MXZ-SM36NAM2 36,000 BTU · Condensing Unit ×1
MXZ-SM36NAMH72 36,000 BTU · Condensing Unit ×1
2 projects · most recent 09/18/2026
Water/Sanitary Gas
FiledStatusContractorScope
09/18/2026——Gas, Water/Sanitary
03/13/2026Permit IssuedAqueduct MechanicalWater/Sanitary
1 project · most recent 05/27/2026
General Wiring
FiledStatusContractorScope
05/27/2026Permit IssuedW & M ElectricGeneral Wiring
1 project · most recent 09/18/2026
Steel Concrete Wood
FiledStatusContractorScope
09/18/2026——Steel, Concrete, Wood
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
09/03/2026HVAC-R and service water heating system controls—energy_progress
09/03/2026HVAC-R and service water heating equipment—energy_progress
09/03/2026HVAC-R and service water piping design and insulation—energy_progress
08/26/2026Structural Steel - WeldingAngelos Georgopoulosspecial
08/26/2026Structural Steel - DetailsAngelos Georgopoulosspecial
08/26/2026Fire-Resistant Penetrations and JointsAngelos Georgopoulosspecial
08/26/2026Post-installed AnchorsAngelos Georgopoulosspecial
08/26/2026Structural Stability – Alterations of existing buildingsAngelos Georgopoulosspecial
08/26/2026Structural Steel - High Strength BoltingAngelos Georgopoulosspecial
08/26/2026FinalAngelos Georgopoulosprogress
08/14/2026HVAC-R and service water heating equipment—energy_progress
08/14/2026Ventilation and air distribution system—energy_progress
08/14/2026Maintenance information—energy_progress
08/14/2026Air barrier - visual inspection—energy_progress
08/14/2026Permanent certificate—energy_progress
08/14/2026HVAC-R and service water piping design and insulation—energy_progress
08/14/2026HVAC-R and service water heating system controls—energy_progress
08/14/2026Fire-Resistant Penetrations and Joints—special
08/13/2026Mechanical Systems—special
08/13/2026Final—progress
03/12/2026Fire-Resistant Penetrations and JointsVincent Liottaspecial
03/12/2026Interior lighting powerVincent Liottaenergy_progress
03/12/2026FinalVincent Liottaprogress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/22/2026Q01445539-S1Request digital key ↗
09/22/2026Q01445539-S2Request digital key ↗
09/22/2026Q01445539-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026Q01445539-S1Open ↗
09/23/2026Q01445539-S1Open ↗
09/23/2026Q01445539-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/22/2026Q01445539-S2Open ↗
09/22/2026Q01445539-S1Open ↗
09/22/2026Q01445539-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026Q01445539-S1Open ↗
08/29/2026Q01371109-I1Open ↗
08/29/2026Q01371109-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
09/22/2026Q01445539-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/23/2026Q01445539-S2Open ↗
09/22/2026Q01445539-S1Open ↗
09/22/2026Q01445539-I1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
09/22/2026Q01445539-I1Open ↗