QUEENS
22-43 JACKSON AVENUE
QUEENS · BIN 4000561
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Active Violations
Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofTrader Joe's9p · 2 filings · 15 docs
Floor 3Temporary scaffold installation1p · 1 filing · 9 docs
Floor 2Circle F Capital9p · 1 filing · 12 docs
Floor 1Five Iron Golf, Trader Joe's13p · 12 filings · 20 docs
CellarFive Iron Golf, Trader Joe's13p · 9 filings · 20 docs
Site & exteriorFive Iron Golf, Trader Joe's20p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Circle F 2243 Jackson8007/08/2026
NYC Department of Design and Construction303/21/2026
2243 Jackson103/22/2026
City of New York Department Design103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/01/2017$23.0M—Private party → CIRCLE F 2243 JACKSON LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Dxu202/22/2023
Case Engineering501/16/2023
Custodio Consulting212/12/2022
Leon Skvirsky PE106/27/2022
MSM Engineering Services205/23/2022
CS Engineering PC (CBP Engineering)411/29/2021
Syed Engineering209/29/2021
New York & Company304/01/2021
HC Engineering211/05/2020
Pace Engineering703/17/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Building Brothers203/21/2026
Custodio Consulting1803/21/2026
J.A.M. Associates1403/21/2026
Consolidated Scaffold Bridge403/21/2026
JD Design Associates403/21/2026
JP Expedite403/21/2026
Eurocelt Expediting1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Consolidated ScaffoldingScaffold1807/08/2026
Vanguard Construction andGeneral Contractor807/08/2026
Signs CadSign hanger407/08/2026
Warner Construction ServicesGeneral Contractor303/21/2026
Premier Fire Sprinkler CoFire Protection207/08/2026
Bedrock Plumbing & HeatingPlumbing107/08/2026
Full Capacity FireFire Protection107/08/2026
Joe Parziale Plumbing CoPlumbing107/08/2026
Maccarone PlumbingPlumbing107/08/2026
MPS Plumbing & HeatingPlumbing107/08/2026
Paul SignsSign hanger107/08/2026
KJK ElectricElectrical103/22/2026
V. Vass ElectricElectrical103/22/2026
Retail Project MangementGeneral Contractor107/08/2026
Commercial Electric ContElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Custodio Consulting1835502/22/2023
Hawa Engineering7982312/12/2022
AK Engineering678311/29/2021
Times Buildings Engineering710304/01/2021
Building Lifecycle
All (170)Filed (30)Permit Issued (29)Signed Off (19)Violation (51)Inspection (11)Special Inspection (30)
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/24/2023
Violation issued (ECB, closed)
Elevators
02/28/2023
Signed off — Alteration
INTERIOR BUILD OUT AND RENOVATION OF AN EXISTING DEMISED SPACE. WORK TO INCLUDE THE INSTALLATION OF CEILINGS, PARTITIONS, DOORS AND INTERIOR FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00701354-I1
02/24/2023
Special inspection requirement — Final
Anthony Caserma
02/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Anthony Caserma
02/24/2023
Special inspection requirement — Fire-Resistance Rated Construction
Anthony Caserma
02/24/2023
Special inspection requirement — Interior lighting power
Anthony Caserma
02/24/2023
Special inspection requirement — Lighting controls
Anthony Caserma
02/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Caserma
02/22/2023
Filed — Alteration
INTERIOR BUILD OUT AND RENOVATION OF AN EXISTING DEMISED SPACE. WORK TO INCLUDE THE INSTALLATION OF CEILINGS, PARTITIONS, DOORS AND INTERIOR FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00701354-P1
02/03/2023
Signed off — Alteration
MODIFICATION OF EXISTING HVAC SYSTEM, INCLUDING RANGEHOOD COOKING EXHAUST SYSTEM, ON THE CELLAR AND FIRST FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00701732-I1
02/02/2023
Signed off — Alteration
Q00702074-I1
01/17/2023
Special inspection requirement — Interior lighting power
Anthony Caserma
01/17/2023
Special inspection requirement — Lighting controls
Anthony Caserma
01/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Anthony Caserma
01/17/2023
Special inspection requirement — Final
Anthony Caserma
01/17/2023
Special inspection requirement — Mechanical Systems
Anthony Caserma
01/17/2023
Special inspection requirement — Shutoff dampers
Anthony Caserma
01/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Caserma
01/17/2023
Special inspection requirement — Energy Code Compliance Inspections
Anthony Caserma
01/17/2023
Special inspection requirement — Final
Anthony Caserma
01/17/2023
Special inspection requirement — Fire-Resistance Rated Construction
Anthony Caserma
01/16/2023
Filed — Alteration
MODIFICATION OF EXISTING HVAC SYSTEM, INCLUDING RANGEHOOD COOKING EXHAUST SYSTEM, ON THE CELLAR AND FIRST FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00701732-P2
12/13/2022
Signed off — Alteration
MODIFICATION OF SPRINKLERS ON THE CELLAR LEVEL AND FIRST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00702094-I1
12/13/2022
Special inspection requirement — Post-installed Anchors
WASEEM HAKEEM
12/13/2022
Special inspection requirement — Sprinkler Systems
WASEEM HAKEEM
12/12/2022
Filed — Alteration
MODIFICATION OF SPRINKLERS ON THE CELLAR LEVEL AND FIRST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00702094-P1
11/22/2022
Special inspection requirement — Final
Anthony Caserma
11/22/2022
Special inspection requirement — Shutoff dampers
Anthony Caserma
11/22/2022
Special inspection requirement — Mechanical Systems
Anthony Caserma
11/22/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Anthony Caserma
11/17/2022
Signed off — Alteration
Q00702020-I1
11/14/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/08/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/19/2022
Filed — Alteration
MODIFICATION OF EXISTING HVAC SYSTEM, INCLUDING RANGEHOOD COOKING EXHAUST SYSTEM, ON THE CELLAR AND FIRST FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00701732-P1
09/22/2022
Signed off — Alteration
Q00602806-I1
09/20/2022
Signed off — Alteration
INTERIOR RENOVATION EXISTING STORE WITH PARTITION WORK AT 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00740558-I1
09/20/2022
Signed off — Alteration
INTERIOR RENOVATION EXISTING STORE WITH PLUMBING WORK AT 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00740601-I1
09/19/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/16/2022
Signed off — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (5i)
Q00757142-I1
08/22/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/19/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/27/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/22/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/22/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/22/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/12/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/12/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/30/2022
Permit issued — Sign
Q00757142-I1-SG
06/28/2022
Permit issued — Plumbing
Q00740601-I1-PL
06/27/2022
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (5i)
Q00757142-I1
06/24/2022
Permit issued — General Construction
Q00701354-I1-GC
06/24/2022
Permit issued — Structural
Q00702074-I1-ST
06/22/2022
Permit issued — General Construction
Q00740558-I1-GC
06/14/2022
Special inspection requirement — Final
LEON SKVIRSKY
05/23/2022
Filed — Alteration
INTERIOR RENOVATION EXISTING STORE WITH PARTITION WORK AT 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00740558-I1
05/23/2022
Filed — Alteration
INTERIOR RENOVATION EXISTING STORE WITH PLUMBING WORK AT 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00740601-I1
05/23/2022
Special inspection requirement — Lighting controls
MOHAMED MAHMOUD
05/23/2022
Special inspection requirement — Interior lighting power
MOHAMED MAHMOUD
04/28/2022
Permit issued — Plumbing
Q00702020-I1-PL
Latest 60 of 170 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offPaul Signs06/30/2022
DOB NOWPlumbingSigned-offMPS Plumbing & Heating06/28/2022
DOB NOWGeneral ConstructionSigned-offVanguard Construction and06/24/2022
DOB NOWStructuralSigned-offVanguard Construction and06/24/2022
DOB NOWGeneral ConstructionSigned-offWarner Construction Services06/22/2022
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating04/28/2022
DOB NOWSprinklersSigned-offFull Capacity Fire04/27/2022
DOB NOWMechanical SystemsSigned-offVanguard Construction and04/21/2022
DOB NOWGeneral ConstructionSigned-offVanguard Construction and04/07/2022
DOB NOWStructuralSigned-offVanguard Construction and04/06/2022
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding10/01/2021
DOB NOWSprinklersSigned-offPremier Fire Sprinkler Co07/14/2021
DOB NOWSignSigned-offSigns Cad05/04/2021
DOB NOWSignSigned-offSigns Cad05/04/2021
DOB NOWPlumbingSigned-offJoe Parziale Plumbing Co02/24/2021
DOB NOWPlumbingSigned-offMaccarone Plumbing01/29/2021
DOB NOWSprinklersSigned-offPremier Fire Sprinkler Co01/21/2021
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding11/25/2020
DOB NOWSignSigned-offSigns Cad11/09/2020
DOB NOWSignSigned-offSigns Cad11/09/2020
DOB NOWMechanical SystemsSigned-offRetail Project Mangement10/23/2020
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding06/22/2020
DOB NOWSupported ScaffoldSigned-offConsolidated Scaffolding03/03/2020
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding07/09/2019
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding06/28/2019
DOB NOWSupported ScaffoldSigned-offConsolidated Scaffolding06/26/2019
DOB NOWSupported ScaffoldSigned-offConsolidated Scaffolding01/16/2019
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding11/14/2018
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding11/13/2018
BIS—ISSUEDZhong Wang Construction S03/16/2021
BISEQISSUEDZhong Wang Construction S12/22/2020
BISOTISSUEDRetail Project Mangement10/26/2020
BISOTISSUEDRetail Project Mangement10/26/2020
BISOTISSUEDRetail Project Mangement10/23/2020
BIS—ISSUEDZhong Wang Construction S10/02/2020
BISSDISSUEDGreat City Mechanical07/10/2020
BISEQISSUEDConsolidated Scaffolding03/09/2020
BISPLISSUEDA. M. Plumbing Company02/25/2020
BIS—RE-ISSUEDZhong Wang Construction S11/26/2019
BISEQISSUEDZhong Wang Construction S11/12/2019
+ 22 more permits on file
15 projects · most recent 06/03/2025
General Wiring
FiledStatusContractorScope
06/03/2025Permit IssuedAmpere Electrical Services76 meters, 1 new_meters
10/25/2024Permit IssuedHylan Datacom & Electrical2 meters, 1 new_meters
11/08/2022CompleteCedar Electrical ContractorsGeneral Wiring
07/12/2022CompleteEmpire State Electl—
04/07/2022CompleteCedar Electrical Contractors—
05/28/2021CompleteSigns Cad—
05/28/2021CompleteSigns Cad—
03/15/2021CompleteAmpere Electrical ServicesGeneral Wiring
10/14/2020CompleteCommercial Electric ContGeneral Wiring
08/21/2020CompleteAmpere Electrical Services75 meters, 75 new_meters
05/26/2020CompleteKJK Electric—
04/27/2020CompleteKwong Ming Electric—
12/19/2018CompleteKwong Ming Electric—
11/30/2018CompleteV. Vass Electric—
11/05/2018CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
11/14/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/08/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/19/2022Pass-Final General Construction Non-Directive 14PassView ↗
08/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/22/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/22/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/12/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
02/24/2023FinalAnthony Casermaprogress
02/24/2023Energy Code Compliance InspectionsAnthony Casermaprogress
02/24/2023Fire-Resistance Rated ConstructionAnthony Casermaprogress
02/24/2023Interior lighting powerAnthony Casermaenergy_progress
02/24/2023Lighting controlsAnthony Casermaenergy_progress
02/24/2023Fire-Resistant Penetrations and JointsAnthony Casermaspecial
01/17/2023Interior lighting powerAnthony Casermaenergy_progress
01/17/2023Lighting controlsAnthony Casermaenergy_progress
01/17/2023HVAC-R and service water piping design and insulationAnthony Casermaenergy_progress
01/17/2023FinalAnthony Casermaprogress
01/17/2023Mechanical SystemsAnthony Casermaspecial
01/17/2023Shutoff dampersAnthony Casermaenergy_progress
01/17/2023Fire-Resistant Penetrations and JointsAnthony Casermaspecial
01/17/2023Energy Code Compliance InspectionsAnthony Casermaprogress
01/17/2023FinalAnthony Casermaprogress
01/17/2023Fire-Resistance Rated ConstructionAnthony Casermaprogress
12/13/2022Post-installed AnchorsWASEEM HAKEEMspecial
12/13/2022Sprinkler SystemsWASEEM HAKEEMspecial
11/22/2022FinalAnthony Casermaprogress
11/22/2022Shutoff dampersAnthony Casermaenergy_progress
11/22/2022Mechanical SystemsAnthony Casermaspecial
11/22/2022HVAC-R and service water piping design and insulationAnthony Casermaenergy_progress
06/14/2022FinalLEON SKVIRSKYprogress
05/23/2022Lighting controlsMOHAMED MAHMOUDenergy_progress
05/23/2022Interior lighting powerMOHAMED MAHMOUDenergy_progress
Latest 25 of 35.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Five Iron GolfFitness / RecreationCellar, Floor 1
Project Q00702074 Alteration · LOC Issued · 03/29/2022
Project Q00702094 Alteration · LOC Issued · 03/29/2022
Project Q00701732 Alteration · LOC Issued · 03/28/2022
Project Q00702020 Alteration · LOC Issued · 03/28/2022
Project Q00701354 Alteration · LOC Issued · 03/25/2022
Trader Joe'sSupermarketCellar, Floor 1
Project Q00400801 Alteration · LOC Issued · 11/05/2020
Project Q00400810 Alteration · LOC Issued · 11/05/2020
Project Q00345729 Alteration · LOC Issued · 07/29/2020
Project Q00345741 Alteration · LOC Issued · 07/29/2020
Project Q00347215 Alteration · LOC Issued · 07/29/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 498 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch15
08/28/2026Q00096468-I1Request digital key ↗
08/28/2026Q00099321-I1Request digital key ↗
08/27/2026Q00602806-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/28/2026Q00347215-I1Request digital key ↗
08/28/2026Q00395398-I1Request digital key ↗
08/15/2026Q00395398-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold4
08/28/2026Q00119572-I1Request digital key ↗
08/15/2026Q00119572-P3Request digital key ↗
08/15/2026Q00119572-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
08/28/2026Q00099321-P1Request digital key ↗
08/28/2026Q00099321-I1Request digital key ↗
08/27/2026Q00431760-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign2
08/27/2026Q00400810-I1Request digital key ↗
08/27/2026Q00400801-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/28/2026Q00345741-I1Request digital key ↗
08/15/2026Q00345741-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00345729-I1Request digital key ↗
▸Applications & Permits101
▸BISPLAN / WORK APPROVAL APPLICATION67
04/07/2023420272449Open ↗
04/04/2023421421401Open ↗
09/13/2022420659406Open ↗
Showing 3 of 67 on file for this type
▸BISWORK PERMIT APPLICATION31
06/18/2021420659406Open ↗
10/26/2020440598569Open ↗
10/23/2020440608479Open ↗
Showing 3 of 31 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
08/06/2020420659406Open ↗
07/06/2020420659406Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISAMENDED ZONING DIAGRAM1
02/13/2020420659406Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
01/18/2022420659406Open ↗
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications101
▸DOB NOWDPL-1: Design Professional Seal & Signature30
08/28/2026Q00096468-I1Open ↗
08/28/2026Q00119572-P3Open ↗
08/28/2026Q00119572-P2Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/26/2026Q00701732-P2Open ↗
09/26/2026Q00701732-P2Open ↗
09/26/2026Q00701732-P2Open ↗
Showing 3 of 24 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/26/2026Q00701732-P2Open ↗
09/22/2026Q00345741-P1Open ↗
09/02/2026Q00702074-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
12/22/2020440658780Open ↗
10/21/2020440608479Open ↗
07/15/2020440598569Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
12/22/2020440658780Open ↗
10/21/2020440608479Open ↗
07/15/2020440598569Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
12/22/2020440658780Open ↗
10/21/2020440608479Open ↗
07/15/2020440598569Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment27
▸BISSCHEDULE B - PLUMBING10
10/30/2020420659406Open ↗
10/29/2020420659406Open ↗
10/26/2020420659406Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
02/12/2020420659406Open ↗
12/06/2019420659406Open ↗
12/05/2019420659406Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS3
06/10/2022420659406Open ↗
06/10/2022420659406Open ↗
06/01/2022420659406Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
04/27/2022420659406Open ↗
11/23/2021420659406Open ↗
▸BISSEWER CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
03/12/2021420659406Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
03/12/2021420659406Open ↗
▸BISSPRINKLER/STANDPIPE ELECTRICAL LETTER1
08/21/2023420659406Open ↗
▸Safety & Tenant Protection18
▸DOB NOWTenant Protection Plan9
08/13/2026Q00345741-I1Open ↗
08/13/2026Q00395398-P1Open ↗
08/13/2026Q00347215-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES3
10/21/2020440608479Open ↗
07/15/2020440598569Open ↗
Showing 2 of 3 on file for this type
▸BISSTREET TREE CHECKLIST2
06/24/2020421556676Open ↗
Showing 1 of 2 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISRODENT CONTROL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
08/13/2021420659406Open ↗
07/23/2021440598569Open ↗
07/23/2021440608479Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
08/13/2021420659406Open ↗
07/23/2021440598569Open ↗
07/23/2021440608479Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026Q00701354-I1Open ↗
08/13/2026Q00740558-I1Open ↗
08/13/2026Q00701732-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
10/21/2020440608479Open ↗
07/15/2020440598569Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00701732-I1Open ↗
▸Inspections & Test Reports36
▸BISTECHNICAL REPORT: RESPONSIBILITY21
01/27/2023420272449Open ↗
08/13/2021420659406Open ↗
07/23/2021440598569Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
04/08/2021420659406Open ↗
03/15/2021420659406Open ↗
Showing 2 of 3 on file for this type
▸BISMASONRY SUPPLIER'S STATEMENT-FORM 10J1
09/12/2023420659406Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
01/21/2021420659406Open ↗
▸Approvals, Objections & Sign-offs61
▸BISSCHEDULE A - OCCUPANCY / USE23
09/13/2022420659406Open ↗
10/08/2020420659406Open ↗
10/02/2020420659406Open ↗
Showing 3 of 23 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION15
06/27/2022420659406Open ↗
11/11/2020421784732Open ↗
04/11/2019420659406Open ↗
Showing 3 of 15 on file for this type
▸BISSUPERSEDING LETTER9
08/17/2020421575913Open ↗
07/06/2020420659406Open ↗
07/06/2020420659406Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
01/30/2023420272449Open ↗
01/24/2023421421429Open ↗
01/04/2023421555454Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFINAL1
01/27/2023420272449Open ↗
▸BISHOUSE CONNECTION SIGNOFF1
07/20/2023420659406Open ↗
▸BISLANDMARKS APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT11
01/18/2023421421429Open ↗
10/04/2021440608479Open ↗
08/06/2021440598569Open ↗
Showing 3 of 11 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE6
06/18/2021420659406Open ↗
11/29/2019420659406Open ↗
Showing 2 of 6 on file for this type
▸Filing & Intake Forms49
▸BISADDITIONAL INFORMATION26
11/13/2023420659406Open ↗
01/04/2023421555454Open ↗
02/12/2021420659406Open ↗
Showing 3 of 26 on file for this type
▸BISEFILING COVER SHEET15
12/10/2020421784732Open ↗
Showing 1 of 15 on file for this type
▸BISBOROUGH INTAKE FORM4
06/18/2021420659406Open ↗
10/08/2020421544430Open ↗
07/06/2020420659406Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
12/22/2020440658780Open ↗
10/21/2020440608479Open ↗
07/15/2020440598569Open ↗
Showing 3 of 4 on file for this type
▸Other Documents10
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
11/29/2019420659406Open ↗
Showing 1 of 3 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
07/27/2020421556676Open ↗
07/27/2020421556676Open ↗
▸BISPLOT DIAGRAM2
11/11/2020421784732Open ↗
Showing 1 of 2 on file for this type
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTCO - Supporting Documents1
03/15/2021420659406Open ↗