2 Open Violations 1 unresolved · 1 paperwork only▸
DOB10/01/2019FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
ECB02/25/20251RCNY 103-09(E). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT BY THE DEADLINE AS REQUIRED BY 1RCNY 103-09(E)(2) AND (5). TO DATE, THE DEPARTMENT HAS NOT RECEIVED A RETAINING WALL CONDITION ASSESSNothing owed — awaiting certificate of correction
Two family converted from one family · 3,800 sf lot · 0.21 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.