One story retail building
22-58 31 STREET
QUEENS · BIN 4017624
💬 Discuss this project
1931Year Built
1Stories
K1Building Class
C4-2AZoning
580 sfGross Floor Area
2Units
4 Open Violations 2 unresolved · 2 paperwork only ▸
One story retail building · 818 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 20 docs
Floor 1Under Construction11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AMTRAK103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TL ENGINEERING, PC603/04/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZHONGSHUN JIANZHU INCGeneral Contractor207/08/2026
CROSSFIELD PLBG.&HTGPlumbing109/13/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TL ENGINEERING, PC1222412/12/2025
Building Lifecycle
All (60)Filed (6)Permit Issued (3)Violation (4)Objection (26)Special Inspection (21)
09/11/2026
Permit issued — Plumbing
Q01232650-S2-PL
07/06/2026
Permit issued — Mechanical Systems
Q01232650-S3-MS
07/06/2026
Permit issued — General Construction
Q01232650-I1-GC
03/04/2026
Filed — Alteration
DEMOLITION UNAUTHORIZED REAR EXTENSION CONSTRUCTED WITHOUT A PERMIT: REMOVE ECB VIOLATION #39138331J. REMOVE ALL WOODEN STUDS, JOISTS AND PLYWOOD ASSOCIATED WITH THE EXTENSION.
Q01367218-I1
03/04/2026
Special inspection requirement — Final
Simon Lee
01/08/2026
Objection resolved — Addressed
12/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Simon Lee
12/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Simon Lee
12/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
Simon Lee
12/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Simon Lee
12/29/2025
Special inspection requirement — Air barrier - visual inspection
Simon Lee
12/29/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Simon Lee
12/29/2025
Special inspection requirement — Insulation placement and R values
Simon Lee
12/29/2025
Special inspection requirement — Fenestration air leakage
Simon Lee
12/29/2025
Special inspection requirement — Fenestration areas
Simon Lee
12/16/2025
Objection resolved — Addressed
12/16/2025
Objection resolved — Addressed
12/16/2025
Objection resolved — Addressed
12/12/2025
Filed — Alteration
HEREWITH FILE TO RESTORE THE FIRE DAMAGED RETAIL STORE INCLUDES THE REPLACEMENT OF FIRE-DAMAGED BEARING WALLS AND ROOFING, FLOORING REPAIRS, NEW PAINT, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
Q01232650-P2
12/03/2025
Objection raised — Plumbing
12/03/2025
Objection raised — Plumbing
12/03/2025
Objection raised — Plumbing
12/02/2025
Objection resolved — Addressed
12/02/2025
Objection resolved — Addressed
12/02/2025
Objection resolved — Addressed
12/02/2025
Objection resolved — Addressed
11/29/2025
Objection raised — Mechanical
11/29/2025
Objection raised — Plumbing
11/29/2025
Objection raised — Fire_Protection
11/29/2025
Objection raised — Mechanical
11/29/2025
Objection raised — Plumbing
11/04/2025
Filed — Alteration
HEREWITH FILE TO RESTORE THE FIRE DAMAGED RETAIL STORE INCLUDES THE REPLACEMENT OF FIRE-DAMAGED BEARING WALLS AND ROOFING, FLOORING REPAIRS, NEW PAINT, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
Q01232650-S2
11/04/2025
Filed — Alteration
HEREWITH FILE TO RESTORE THE FIRE DAMAGED RETAIL STORE INCLUDES THE REPLACEMENT OF FIRE-DAMAGED BEARING WALLS AND ROOFING, FLOORING REPAIRS, NEW PAINT, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
Q01232650-S3
11/04/2025
Special inspection requirement — Mechanical Systems
Simon Lee
11/04/2025
Special inspection requirement — Final
Simon Lee
10/09/2025
Objection resolved — Addressed
10/09/2025
Objection resolved — Addressed
10/06/2025
Objection raised — Scope
10/06/2025
Objection raised — Scope
09/16/2025
Filed — Alteration
HEREWITH FILE TO RESTORE THE FIRE DAMAGED RETAIL STORE INCLUDES THE REPLACEMENT OF FIRE-DAMAGED BEARING WALLS AND ROOFING, FLOORING REPAIRS, NEW PAINT, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
Q01232650-P1
09/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Simon Lee
09/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Simon Lee
09/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Simon Lee
09/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
09/15/2025
Special inspection requirement — Air barrier - visual inspection
09/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
09/15/2025
Special inspection requirement — Fenestration air leakage
09/15/2025
Special inspection requirement — Insulation placement and R values
09/15/2025
Special inspection requirement — Fenestration areas
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
07/07/2025
Objection resolved — Addressed
06/27/2025
Objection raised — Scope
06/27/2025
Objection raised — Inspections
06/27/2025
Objection raised — Scope
06/09/2025
Filed — Alteration
HEREWITH FILE TO RESTORE THE FIRE DAMAGED RETAIL STORE INCLUDES THE REPLACEMENT OF FIRE-DAMAGED BEARING WALLS AND ROOFING, FLOORING REPAIRS, NEW PAINT, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
Q01232650-I1
02/13/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/13/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/13/2025
Violation issued (ECB, open)
Construction
08/22/2007
Violation issued (ECB, open)
Site Safety
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG09/11/2026
DOB NOWMechanical SystemsPermit IssuedZHONGSHUN JIANZHU INC07/06/2026
DOB NOWGeneral ConstructionPermit IssuedZHONGSHUN JIANZHU INC07/06/2026
BIS—ISSUEDPAYLOW DISCOUNT11/15/1989
1 project · most recent 12/12/2025
Others
FiledStatusContractorScopeMake / Model / Capacity
12/12/2025Permit IssuedZHONGSHUN JIANZHU INCOthers
Other
Captiveaire Kitchen Hood with Exhaust Fan 3,000 CFM · Kitchen Exhaust ×1
1 project · most recent 12/12/2025
Water/Sanitary
FiledStatusContractorScope
12/12/2025Permit IssuedCROSSFIELD PLBG.&HTGWater/Sanitary
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
03/04/2026FinalSimon Leeprogress
12/29/2025Structural Stability – Alterations of existing buildingsSimon Leespecial
12/29/2025Fire-Resistant Penetrations and JointsSimon Leespecial
12/29/2025Fire-Resistance Rated ConstructionSimon Leeprogress
12/29/2025Energy Code Compliance InspectionsSimon Leeprogress
12/29/2025Air barrier - visual inspectionSimon Leeenergy_progress
12/29/2025Fenestration and door U-factor and product ratingsSimon Leeenergy_progress
12/29/2025Insulation placement and R valuesSimon Leeenergy_progress
12/29/2025Fenestration air leakageSimon Leeenergy_progress
12/29/2025Fenestration areasSimon Leeenergy_progress
11/04/2025Mechanical SystemsSimon Leespecial
11/04/2025FinalSimon Leeprogress
09/15/2025Fire-Resistant Penetrations and JointsSimon Leespecial
09/15/2025Structural Stability – Alterations of existing buildingsSimon Leespecial
09/15/2025Energy Code Compliance InspectionsSimon Leeprogress
09/15/2025Fire-Resistance Rated Construction—progress
09/15/2025Air barrier - visual inspection—energy_progress
09/15/2025Fenestration and door U-factor and product ratings—energy_progress
09/15/2025Fenestration air leakage—energy_progress
09/15/2025Insulation placement and R values—energy_progress
09/15/2025Fenestration areas—energy_progress
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/18/2026Q01232650-S2Request digital key ↗
08/18/2026Q01232650-P1Request digital key ↗
08/18/2026Q01232650-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/18/2026Q01232650-P1Open ↗
08/18/2026Q01232650-I1Open ↗
08/13/2026Q01232650-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/27/2026Q01232650-I1Open ↗
08/27/2026Q01232650-I1Open ↗
08/27/2026Q01232650-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/27/2026Q01232650-I1Open ↗
08/27/2026Q01232650-I1Open ↗
08/23/2026Q01232650-S3Open ↗
Showing 3 of 5 on file for this type