← Back
BuildNYC
Over six families without stores
22-69 41ST STREET
QUEENS · BIN 4015339
💬 Discuss this project
1930Year Built
4Stories
C1Building Class
R5Zoning
8,500 sfGross Floor Area
12Units
Rent Stabilized15 Active Violations 1 likely answered ▸
Over six families without stores · Owner of record: Allionii · 2,500 sf lot · 3.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed Exterior Repairs Exist. 4-Story Building2p · 1 filing · 8 docs
BulkheadPipe scaffold with material hoist1p · 1 filing · 2 docs
Site & exteriorProposed Exterior Repairs Exist. 4-Story Building14p · 4 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Allionii903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Noesis Designs Architecture204/17/2023
Empire Design305/18/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Yerasimos Mazarakis203/21/2026
AK Consulting Services603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rajput RestorationScaffold1207/08/2026
Rajput RestorationGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Silvia Fuca-Tomescu3725204/17/2023
Empire Design5474105/18/2021
Building Lifecycle
All (53)Filed (5)Permit Issued (7)Signed Off (2)Violation (34)Objection (2)Special Inspection (3)
01/28/2024
Violation issued (HPD, open)
A
01/28/2024
Violation issued (HPD, open)
C
01/28/2024
Violation issued (HPD, open)
B
01/28/2024
Violation issued (HPD, open)
B
08/31/2023
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 22-69 41ST STREET, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q00516173-I1
08/21/2023
Violation issued (HPD, open)
B
08/21/2023
Violation issued (HPD, open)
A
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/16/2023
Signed off — Alteration
REPLACEMENT OF PORTION OF PARAPET WALL IN 2 LOCATIONS, SECTION OF ROOF IN THESE LOCATIONS APPROXIMATELY 1 FOOT WIDE AND EXTERIOR BRICK REPAIR WORK IN VARIOUS LOCATIONS
Q00600766-I1
05/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SILVIA FUCA-TOMESCU
05/10/2023
Special inspection requirement — Masonry
SILVIA FUCA-TOMESCU
05/10/2023
Special inspection requirement — Final
HARIS MAMAGAKIS
05/01/2023
Objection resolved — Addressed
04/19/2023
Objection raised — Scope
04/17/2023
Filed — Alteration
REPLACEMENT OF PORTION OF PARAPET WALL IN 2 LOCATIONS, SECTION OF ROOF IN THESE LOCATIONS APPROXIMATELY 1 FOOT WIDE AND EXTERIOR BRICK REPAIR WORK IN VARIOUS LOCATIONS
Q00600766-P1
12/16/2021
Permit issued — General Construction
Q00600766-I1-GC
10/29/2021
Permit issued — Sidewalk Shed
Q00516173-I1-SH
10/29/2021
Permit issued — Supported Scaffold
Q00520979-I1-SF
10/29/2021
Permit issued — Supported Scaffold
Q00521163-I1-SF
10/08/2021
Filed — Alteration
REPLACEMENT OF PORTION OF PARAPET WALL IN 2 LOCATIONS, SECTION OF ROOF IN THESE LOCATIONS APPROXIMATELY 1 FOOT WIDE AND EXTERIOR BRICK REPAIR WORK IN VARIOUS LOCATIONS
Q00600766-I1
05/19/2021
Permit issued — Supported Scaffold
Q00521163-I1-SF
05/19/2021
Permit issued — Supported Scaffold
Q00520979-I1-SF
05/18/2021
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 22-69 41ST STREET, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q00520979-I1
05/18/2021
Filed — Alteration
Q00521163-I1
05/10/2021
Permit issued — Sidewalk Shed
Q00516173-I1-SH
05/05/2021
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 22-69 41ST STREET, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q00516173-I1
05/18/2016
Violation issued (ECB, closed)
Construction
08/09/2012
Violation issued (HPD, open)
B
08/09/2012
Violation issued (HPD, open)
B
08/09/2012
Violation issued (HPD, open)
B
08/09/2012
Violation issued (HPD, open)
B
08/09/2012
Violation issued (HPD, open)
B
08/09/2012
Violation issued (HPD, open)
B
08/09/2012
Violation issued (HPD, open)
A
08/01/2010
Violation issued (HPD, open)
B
08/01/2010
Violation issued (HPD, open)
B
04/11/2009
Violation issued (ECB, closed)
Construction
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/28/2008
Violation issued (ECB, closed)
Unknown
04/05/2008
Violation issued (ECB, closed)
Unknown
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/26/2007
Violation issued (ECB, closed)
Unknown
07/21/2007
Violation issued (ECB, closed)
Unknown
05/07/2007
Violation issued (ECB, closed)
Construction
03/06/2007
Violation issued (ECB, closed)
Unknown
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/07/2006
Violation issued (ECB, closed)
Unknown
07/18/2006
Violation issued (ECB, closed)
Quality of Life
07/18/2006
Violation issued (ECB, closed)
Quality of Life
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/11/2004
Violation issued (ECB, closed)
Construction
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRajput Restoration12/16/2021
DOB NOWSidewalk ShedSigned-offRajput Restoration10/29/2021
DOB NOWSupported ScaffoldPermit IssuedRajput Restoration10/29/2021
DOB NOWSupported ScaffoldPermit IssuedRajput Restoration10/29/2021
DOB NOWSupported ScaffoldPermit IssuedRajput Restoration05/19/2021
DOB NOWSupported ScaffoldPermit IssuedRajput Restoration05/19/2021
DOB NOWSidewalk ShedSigned-offRajput Restoration05/10/2021
1 project · most recent 05/18/2021
FiledStatusContractorScope
05/18/2021CompleteGreen Power Electric—
1 project · most recent 05/18/2021
Scaffold
FiledStatusContractorScope
05/18/2021Permit IssuedRajput RestorationScaffold
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
05/10/2023Fire-Resistant Penetrations and JointsSILVIA FUCA-TOMESCUspecial
05/10/2023MasonrySILVIA FUCA-TOMESCUspecial
05/10/2023FinalHARIS MAMAGAKISprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026Q00516173-I1Request digital key ↗
08/27/2026Q00521163-I1Request digital key ↗
08/27/2026Q00520979-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00521163-I1Open ↗
08/27/2026Q00520979-I1Open ↗
08/24/2026Q00600766-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q00600766-I1Open ↗
08/28/2026Q00600766-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026Q00600766-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026Q00600766-I1Open ↗