DOB09/07/2011FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB11/03/2000V-DOB VIOLATION - ACTIVE
DOB07/21/2000V-DOB VIOLATION - ACTIVE
DOB03/24/2000V-DOB VIOLATION - ACTIVE
ECB10/01/2013FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN NOV #34857484J ISSUED ON 6.13.11. WORK W/O PERMIT. 2 STY EXTENSION AT REAR ERECTED. REMEDY: COMPLY W/THE COMMISSIONER'S ORDER.Nothing owed — awaiting certificate of correction
ECB05/11/2013FAILURE TO COMPLY W/COMM'S ORDER TO FILE C OF C W/THE DOB'S FOR VIOL #34587485L FOR RESIDENCE ALTERED. CLASS'A' APT IN BASEMENT ISSUED ON 6-13-11. REMEDY: FILE C OF C.Nothing owed — awaiting certificate of correction
ECB06/13/2011WORK W/O A PERMIT.WORN NOTED:@ THE TIME OF MY INSPECTION I OBSERVED A 2ND FLR. EXTENSION HAS BEEN ADDED APPROX 18' FEET WIDE BY 25'FT. LONG ALSO A 1ST FLR EXTENSION HAS BEEN ADDED APPROX 10'FT.JOB#500332053 HASNothing owed — awaiting certificate of correction
ECB06/13/2011RESIDENCE ALTERD FOR OCCUPANCY AS A DWELLING FOR MORE THAN THE LEGALLYAPPROVED # OF FAMILIES NOTED: @ THE TIME OF MY INSPECTION I OBSERVED A CLASS"A"APT AT THE BASEMNT AREA.KITCHEN(SINK,STOVE03PCS BATHRM(SINK,Nothing owed — awaiting certificate of correction
ECB06/13/2011WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENT.NOTED:AT THE TIME OF MY INSPECTION I OBSERVEDA 2ND FLR. ADD ITION & A CLASS"A" APT AT THE BASMT AREA JOB#500332053 DOES NOT SHOW TNothing owed — awaiting certificate of correction
ECB06/22/2004WORK DOES NOT CONFORM APPOVED PLANS NOTED JOB APPLICATION # 500332053 SHOWS AN ENTIRELY DIFFERENT BUILDING APPROVED PLANS SHOES A 1 1/2 STORY HOUSE WITH A GABLE WITH A FLAT ROOF WINDOW & DOOR PLACEMENT IS ALSONothing owed — awaiting certificate of correction
ECB10/06/2001WORK WITHOUT A PERMIT.WORK NOTED. 2ND FLOOR EXTENSION HAS BEEN ADDED APPROX.8FT X25 FT A REAR 1ST FLOOR EXTENSION HAS ALSO BEEN ADDED APPROX8FT X 25FT A REAR 1ST FLOOR EXTENSION HAS ALSO BEEN ADDED APPROX 10 FTNothing owed — awaiting certificate of correction
ECB10/06/2001WORK WITHOUT A PERMIT/EXPIRED PERMIT.JOB #500332053 ISSUED ON 1/6/99 FOR PROPOSED NEW BASEMENT EXTENSION AND NEW BATHROOM HAS EXPIRED.STOP ALL WORK ORDER ISSUED.WORK APPROX 45% COMPLETE.REMEDY:STOP WORK & RENEWNothing owed — awaiting certificate of correction
ECB05/09/2001WORK WITHOUT A PERMIT EXPIRED PERMIT # 500332053 01 AZ EXP 01/06/00 REMEDY RENEW PERMITNothing owed — awaiting certificate of correction
ECB01/19/2000WORK WITHOUT A PERMIT. WORK NOTED IN THAT BUILDING IS STILL UNDER A MAJOR ALTERATION WITHOUT A WORK PERMIT JOB NUMBER 500332053 WAS FILED BUILDING IS STILL UNDER A WORK PERMIT. OBTAIN APPROVALS TO FINISH ENTINothing owed — awaiting certificate of correction
ECB12/01/1998WORK WIHTOUT A PERMIT IN THAT AN 18 FT X 20 FT CONCRETE FOOTING HAS BEEN PLACED AT REAR OF DWELLING 3FT FROM TOP OF GRADE FOR EXTENSION REMEDY OBTIAN APPROVAL AND PERMITNothing owed — awaiting certificate of correction
ECB11/12/1998NEW PLUMBING SYSTEM BEEING INSTALLED AT CELLAR AND 1ST FLOOR WITHOUT A PERMIT REMEDY STOP ALL PLUMBING WORK OBTAIN PROPER PERMIT AND ARRANGE FOR INSPECTION BY THIS DEPTNothing owed — awaiting certificate of correction
ECB06/26/1998WORK WITHOUT A PERMIT IN THAT AN 18' FEET X 20' FEET CONCRETE FOOTING HAS BEEN PLACED AT REAR DWELLING BEING 3 FEET FROM TOP OOF GRADE. REMEDY: STOP ALL WORK AT ONCE AND OBTAIN APPROVAL AND PERMIT NOTE: ONLY FONothing owed — awaiting certificate of correction