Two family converted from one family
22 FANCHER PLACE
STATEN ISLAND · BIN 5028549
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R3XZoning
1,968 sfGross Floor Area
2Units
Rent Stabilized2 Active Violations ▸FDNY Report ↗
Two family converted from one family · Owner of record: Continental Place Ventures · 3,700 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Family residence1 filing · 14 docs
Floor 1Family residence2 filings · 16 docs
CellarFamily residence1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Continental Place Ventures103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ryan Design Architecture304/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Fatima Yaha303/21/2026
Building Lifecycle
12/08/2025
Objection resolved — Addressed
04/10/2025
Objection raised — Scope
04/08/2025
Filed — Alteration CO
Plumbing work for Legalization of the conversion 1 to 2 family and extension
S00828610-S2
01/07/2025
Filed — Alteration
new 10' cc
S00845108-I1
12/19/2023
Work without a permit .upon inspection observed a 1 story building converted to a full 2 stories in a vertical extension .according to DOB records…
ECB violation · open
22 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 04/08/2025
Gas Water/Sanitary
FiledStatusContractorScope
04/08/2025——Gas, Water/Sanitary
1 project · most recent 10/08/2022
General Wiring
FiledStatusContractorScope
10/08/2022Permit IssuedHigh Beam ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
04/25/2023Subsurface Investigations (Borings/Test Pits)—special
03/16/2023Fire-Resistant Penetrations and Joints—special
03/16/2023Subgrade Inspections—special
03/16/2023Energy Code Compliance Inspections—progress
03/16/2023Fire-Resistance Rated Construction—progress
03/16/2023Fenestration air leakage—energy_progress
03/16/2023Fenestration areas—energy_progress
03/16/2023Metering—energy_progress
03/16/2023Concrete - Cast-In-Place—special
03/16/2023Fenestration and door U-factor and product ratings—energy_progress
28 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account