← Back
Two stories - detached, small or mid-size
22 HILLIS STREET
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5080399
💬 Discuss this project
1960Year Built
2Stories
A1Building Class
R3XZoning
2,739 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,905 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREGORY D. SACHS, PE102/13/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PACIFICO ENGINEERING PC3157102/13/2024
Building Lifecycle
All (12)Filed (1)Permit Issued (1)Signed Off (1)Objection (4)Special Inspection (5)
07/02/2024
Signed off — Alteration
Installation of roof mounted solar. No change in use, egress, or occupancy.
S00995648-I1
02/29/2024
Permit issued — Solar
S00995648-I1-SL
02/27/2024
Objection resolved — Addressed
02/21/2024
Objection resolved — Addressed
02/15/2024
Objection raised — Other
02/15/2024
Objection raised — Other
02/13/2024
Filed — Alteration
Installation of roof mounted solar. No change in use, egress, or occupancy.
S00995648-I1
01/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Pacifico
01/24/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ralph Pacifico
01/24/2024
Special inspection requirement — Energy Code Compliance Inspections
Ralph Pacifico
01/24/2024
Special inspection requirement — Final
Ralph Pacifico
01/24/2024
Special inspection requirement — Air barrier - visual inspection
Ralph Pacifico
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offGREGORY D. SACHS, PE02/29/2024
BISPLISSUEDN/A05/10/2000
BIS—ISSUEDCONSTRUCTION BY DONALD ROWE,JR04/06/2000
1 project · most recent 01/30/2024
FiledStatusContractorScope
01/30/2024CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/24/2024Fire-Resistant Penetrations and JointsRalph Pacificospecial
01/24/2024Structural Stability – Alterations of existing buildingsRalph Pacificospecial
01/24/2024Energy Code Compliance InspectionsRalph Pacificoprogress
01/24/2024FinalRalph Pacificoprogress
01/24/2024Air barrier - visual inspectionRalph Pacificoenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026S00995648-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026S00995648-I1Open ↗
09/01/2026S00995648-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S00995648-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026S00995648-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S00995648-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S00995648-I1Open ↗