22 HOOKER PLACE
STATEN ISLAND · Port Richmond · BIN 5026267
💬 Discuss this project
1905Year Built
2.5Stories
A1Building Class
R3AZoning
1,224 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 3,375 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TRINITY SOLAR LLC202/10/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ACA ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRINITY SOLAR LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BITOPI CONSULTANTS LLC7036202/10/2026
Building Lifecycle
All (10)Filed (2)Permit Issued (1)Signed Off (1)Violation (2)Special Inspection (4)
02/13/2026
Signed off — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
S01213643-I1
02/10/2026
Filed — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
S01213643-P1
02/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KAMRUL AHSAN
02/10/2026
Special inspection requirement — Final
Ayracon Almaraz
02/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Ayracon Almaraz
02/10/2026
Special inspection requirement — Air barrier - visual inspection
Ayracon Almaraz
05/01/2025
Permit issued — Solar
S01213643-I1-SL
04/24/2025
Filed — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
S01213643-I1
12/19/2023
Violation issued (ECB, open)
Construction
09/27/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offTRINITY SOLAR LLC05/01/2025
1 project · most recent 04/16/2025
FiledStatusContractorScope
04/16/2025CompleteREDLINE ELECTRIC INC—
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
02/10/2026Fire-Resistant Penetrations and JointsKAMRUL AHSANspecial
02/10/2026FinalAyracon Almarazprogress
02/10/2026Energy Code Compliance InspectionsAyracon Almarazprogress
02/10/2026Air barrier - visual inspectionAyracon Almarazenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026S01213643-I1Request digital key ↗
08/17/2026S01213643-P1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026S01213643-I1Open ↗
08/25/2026S01213643-I1Open ↗
08/25/2026S01213643-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026S01213643-I1Open ↗
08/17/2026S01213643-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026S01213643-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026S01213643-P1Open ↗
08/17/2026S01213643-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01213643-I1Open ↗