← Back
BuildNYC
BROOKLYN
22 LORRAINE STREET
BROOKLYN · BIN 3429648
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X500
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsEALincoMPAN1 filing
Floor 22p · 1 filing · 20 docs
Floor 1Proposed 8 story building5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Red Hook Buiding B Owner103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Design Build Engineering102/19/2026
JZN Engineering112/24/2025
Associates403/26/2025
Thornton Tomasetti202/18/2025
Aufgang Architects101/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Yona Love Consulting Services1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M.R. Electrical ServiceElectrical203/22/2026
Power Direct ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Big Apple Group NY A Rma9168703/26/2025
Building Lifecycle
All (55)Filed (9)Objection (16)Special Inspection (30)
02/19/2026
Filed — Alteration
Proposed construction fence. No change to use, egress or occupancy under this application.
B01362396-I1
12/30/2025
Objection resolved — Addressed
12/30/2025
Objection resolved — Addressed
12/30/2025
Objection resolved — Addressed
12/27/2025
Objection raised — Other
12/27/2025
Objection raised — Other
12/27/2025
Objection raised — Other
12/24/2025
Filed — New Building
subsequent document to do Sprinkler/Standpipe work in conjunction with NB application
B00934265-S6
12/18/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
08/15/2025
Objection resolved — Addressed
07/16/2025
Objection resolved — Addressed
07/14/2025
Objection resolved — Addressed
07/08/2025
Objection resolved — Addressed
07/03/2025
Objection resolved — Addressed
05/19/2025
Special inspection requirement — Vestibules
SOORJBALLY HARILALL
05/19/2025
Special inspection requirement — Air barrier continuity plan testing
SOORJBALLY HARILALL
05/19/2025
Special inspection requirement — Metering
SOORJBALLY HARILALL
05/19/2025
Special inspection requirement — Protection of exposed foundation insulation
SOORJBALLY HARILALL
05/19/2025
Special inspection requirement — Air barrier — testing
SOORJBALLY HARILALL
04/11/2025
Objection raised — Other
04/03/2025
Objection raised — Other
03/26/2025
Filed — New Building
subsequent document to do Sprinkler/Standpipe work in conjunction with NB application
B00934265-S3
03/26/2025
Filed — New Building
subsequent document to do Sprinkler/Standpipe work in conjunction with NB application
B00934265-S4
03/19/2025
Filed — Alteration
Alteration application to do Temporary Standpipe work in conjunction with NB application
B01179568-I1
03/18/2025
Filed — New Building
subsequent document to do Sprinkler/Standpipe work in conjunction with NB application
B00934265-S5
02/20/2025
Objection raised — Other
02/20/2025
Objection raised — Other
02/18/2025
Filed — New Building
subsequent document to do Sprinkler/Standpipe work in conjunction with NB application
B00934265-S2
02/18/2025
Filed — New Building
subsequent document to do Sprinkler/Standpipe work in conjunction with NB application
B00934265-S1
02/18/2025
Special inspection requirement — Structural Steel - Welding
SOORJBALLY HARILALL
02/18/2025
Special inspection requirement — Masonry
SOORJBALLY HARILALL
02/18/2025
Special inspection requirement — Structural Steel - High Strength Bolting
SOORJBALLY HARILALL
02/18/2025
Special inspection requirement — Deep Foundation Elements
02/18/2025
Special inspection requirement — Concrete - Cast-In-Place
SOORJBALLY HARILALL
02/18/2025
Special inspection requirement — Structural Steel - Details
SOORJBALLY HARILALL
02/18/2025
Special inspection requirement — Post-installed Anchors
SOORJBALLY HARILALL
02/12/2025
Special inspection requirement — Post-installed Anchors
SOORJBALLY HARILALL
02/12/2025
Special inspection requirement — Concrete - Cast-In-Place
SOORJBALLY HARILALL
02/12/2025
Special inspection requirement — Structural Steel - Welding
SOORJBALLY HARILALL
02/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
02/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
SOORJBALLY HARILALL
02/12/2025
Special inspection requirement — Energy Code Compliance Inspections
SOORJBALLY HARILALL
02/12/2025
Special inspection requirement — Structural Steel - High Strength Bolting
SOORJBALLY HARILALL
02/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SOORJBALLY HARILALL
02/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
SOORJBALLY HARILALL
02/12/2025
Special inspection requirement — Maintenance information
SOORJBALLY HARILALL
02/12/2025
Special inspection requirement — Heating Systems
SOORJBALLY HARILALL
02/12/2025
Special inspection requirement — Structural Steel - Details
SOORJBALLY HARILALL
02/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
02/12/2025
Special inspection requirement — Masonry
SOORJBALLY HARILALL
02/12/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SOORJBALLY HARILALL
02/12/2025
Special inspection requirement — Energy Code Compliance Inspections
SOORJBALLY HARILALL
02/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
SOORJBALLY HARILALL
02/10/2025
Objection raised — Other
01/28/2025
Filed — New Building
subsequent document to do Sprinkler/Standpipe work in conjunction with NB application
B00934265-I1
Nothing on file for this building.
1 project · most recent 12/24/2025
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/24/2025——Air Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric mxz-sm36nam2-u1 36,000 BTU · Heat Pump Outdoor ×2
OUZ-A12NKA7 12,000 BTU · Heat Pump Outdoor ×1
mxz-sm48nam2-u1 48,000 BTU · Heat Pump Outdoor ×1
Heat / Cool
Amana PTH123J30 11,600 BTU · Ptac ×147
PTH153J41 14,400 BTU · Ptac ×61
PTH073J21 7,000 BTU · Ptac ×33
Heating
Mitsubishi Electric mxz-sm36nam2-u1 41,000 BTU · Heat Pump Outdoor ×2
PUZ-A12NKA7 14,000 BTU · Heat Pump Outdoor ×1
mxz-sm48nam2-u1 50,000 BTU · Heat Pump Outdoor ×1
Ventilation
Lg U-ERV-COIL-1200 980 CFM ×1
2 projects · most recent 12/24/2025
Sprinkler System
FiledStatusContractorScope
12/24/2025——Sprinkler System
03/19/2025——2 outlets
1 project · most recent 12/24/2025
Storm Water/Sanitary
FiledStatusContractorScope
12/24/2025——Storm, Water/Sanitary
5 projects · most recent 07/15/2026
General Wiring
FiledStatusContractorScope
07/15/2026Permit IssuedOrba Electric—
12/11/2025Permit IssuedPower Direct ElectricGeneral Wiring
12/11/2025Permit IssuedPower Direct Electric93 meters, 93 new_meters
12/11/2025Permit IssuedPower Direct Electric—
12/11/2025Permit IssuedM.R. Electrical ServiceGeneral Wiring
1 project · most recent 12/24/2025
Concrete
FiledStatusContractorScope
12/24/2025——Concrete
1 project · most recent 02/19/2026
Fence
FiledStatusContractorScope
02/19/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
12/18/2025Excavations - Sheeting, Shoring, and Bracing—special
05/19/2025Protection of exposed foundation insulationSOORJBALLY HARILALLenergy_progress
05/19/2025VestibulesSOORJBALLY HARILALLenergy_progress
05/19/2025Air barrier continuity plan testingSOORJBALLY HARILALLenergy_progress
05/19/2025MeteringSOORJBALLY HARILALLenergy_progress
05/19/2025Air barrier — testing SOORJBALLY HARILALLenergy_progress
02/18/2025Deep Foundation Elements—special
02/18/2025Post-installed AnchorsSOORJBALLY HARILALLspecial
02/18/2025Structural Steel - WeldingSOORJBALLY HARILALLspecial
02/18/2025Structural Steel - High Strength BoltingSOORJBALLY HARILALLspecial
02/18/2025Structural Steel - DetailsSOORJBALLY HARILALLspecial
02/18/2025MasonrySOORJBALLY HARILALLspecial
02/18/2025Concrete - Cast-In-PlaceSOORJBALLY HARILALLspecial
02/12/2025Shutoff dampersSOORJBALLY HARILALLenergy_progress
02/12/2025MasonrySOORJBALLY HARILALLspecial
02/12/2025Post-installed AnchorsSOORJBALLY HARILALLspecial
02/12/2025Structural Steel - DetailsSOORJBALLY HARILALLspecial
02/12/2025Structural Steel - High Strength BoltingSOORJBALLY HARILALLspecial
02/12/2025Structural Steel - WeldingSOORJBALLY HARILALLspecial
02/12/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
02/12/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSOORJBALLY HARILALLspecial
02/12/2025Energy Code Compliance InspectionsSOORJBALLY HARILALLprogress
02/12/2025Maintenance informationSOORJBALLY HARILALLenergy_progress
02/12/2025HVAC-R and service water heating system controlsSOORJBALLY HARILALLenergy_progress
02/12/2025HVAC-R and service water piping design and insulationSOORJBALLY HARILALLenergy_progress
Latest 25 of 64.
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/22/2026B00934265-S5Request digital key ↗
08/22/2026B01179568-I1Request digital key ↗
08/18/2026B01362396-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
02/25/2025340916147Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026B00934265-I1Open ↗
08/13/2026B00934265-S6Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00934265-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00934265-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B00934265-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/22/2026B00934265-I1Open ↗
08/22/2026B00934265-S1Open ↗
08/22/2026B00934265-S2Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/25/2025340916147Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/25/2025340916147Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWStandpipe Alarms Drawings1
08/15/2026B00934265-I1—
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B00934265-I1Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
02/25/2025340916147Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/16/2025340916147Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00934265-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/15/2026B00934265-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
02/25/2025340916147Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
02/25/2025340916147Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification1
08/15/2026B00934265-I1Open ↗
▸DOB NOWFlood Plan Emergency Temporary Flood Shields1
08/15/2026B00934265-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B00934265-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00934265-I1Open ↗