22 MOUNT HOPE PLACE
BRONX · BIN 2008223
💬 Discuss this project
1923Year Built
3Stories
C3Building Class
R8Zoning
3,072 sfGross Floor Area
4Units
Rent Stabilized1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Four families · 3,125 sf lot · 0.98 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsTemporary pipe scaffold installationUnder Construction2 filings
RoofTemporary overhead protectionUnder Construction1p · 2 filings
Floor 31p · 1 filing
Floor 21p · 1 filing
Floor 11p · 1 filing
Site & exteriorSidewalk shed installationUnder Construction4 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Walton Developers2410/13/2026
Grun Group506/27/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/11/2026$2.4M—Private party → 20 MH LLC$773/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Express Filing1803/21/2026
Advanced Builders Services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Innovative Construction NYCGeneral Contractor608/08/2026
Core Scaffold SystemsScaffold408/11/2026
Prime Piping & HeatingFire Protection306/28/2026
Innovative Construction NYCScaffold209/09/2026
Ace Group NYScaffold107/08/2026
N Tech Design of AmericaGeneral Contractor107/08/2026
Prime Piping & HeatingPlumbing106/02/2026
M.R. Electrical ServiceElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161208/28/2026
South Bay Engineering PLL6682110/01/2025
Building Lifecycle
All (142)Filed (20)Permit Issued (18)Signed Off (1)Violation (7)Inspection (3)Objection (60)Special Inspection (30)Tax Incentive (3)
06/01/2027
485-x construction completed
10/19/2026
Objection resolved — Resolved
10/19/2026
Objection resolved — Resolved
10/16/2026
Objection raised — Other
10/16/2026
Objection raised — Other
09/25/2026
Objection resolved — Resolved
09/21/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/14/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Bin Li
09/14/2026
Special inspection requirement — Concrete - Cast-In-Place
SHAHRIAR QUAYYUM
09/14/2026
Special inspection requirement — Subgrade Inspections
SHAHRIAR QUAYYUM
09/14/2026
Special inspection requirement — Deep Foundation Elements
SHAHRIAR QUAYYUM
09/14/2026
Special inspection requirement — Footing and Foundation
SHAHRIAR QUAYYUM
09/14/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
09/14/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SHAHRIAR QUAYYUM
09/08/2026
Permit issued — Protection and Mechanical Methods
X01252589-Z2-PMM
09/04/2026
Filed — New Building
SPRINKLER & STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01252589-I1
X01252589-Z2
09/04/2026
Objection resolved — Addressed
09/02/2026
Objection raised — Other
09/02/2026
Objection raised — Other
08/28/2026
Filed — New Building
SPRINKLER & STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01252589-I1
X01252589-P4
08/27/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
08/27/2026
Special inspection requirement — Electrical motors and elevators
SHAHRIAR QUAYYUM
08/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
08/27/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
08/27/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
08/27/2026
Special inspection requirement — Lighting in dwelling units
SHAHRIAR QUAYYUM
08/27/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
08/27/2026
Special inspection requirement — Protection of exposed foundation insulation
SHAHRIAR QUAYYUM
08/27/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
08/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
08/27/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
08/27/2026
Special inspection requirement — Air barrier — testing
SHAHRIAR QUAYYUM
08/27/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
08/27/2026
Special inspection requirement — Exterior lighting power
SHAHRIAR QUAYYUM
08/27/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
08/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
08/27/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
08/13/2026
Filed — New Building
SPRINKLER & STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01252589-I1
X01252589-P3
08/13/2026
Special inspection requirement — Structural Steel - Welding
08/13/2026
Special inspection requirement — Structural Steel - Details
08/13/2026
485-x registration filed
08/12/2026
Filed — New Building
SPRINKLER & STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01252589-I1
X01252589-P2
08/12/2026
Filed — New Building
SPRINKLER & STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01252589-I1
X01252589-P1
08/12/2026
Special inspection requirement — Deep Foundation Elements
08/12/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Bin Li
08/12/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SHAHRIAR QUAYYUM
08/12/2026
Special inspection requirement — Subgrade Inspections
SHAHRIAR QUAYYUM
08/10/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01412048-I1
08/10/2026
Permit issued — Sidewalk Shed
X01412048-I1-SH
08/07/2026
Permit issued — Earth Work
X01252589-S2-FO-EA
08/06/2026
Permit issued — Structural
X01252589-S3-ST
08/05/2026
Permit issued — General Construction
X01252589-I1-GC
08/04/2026
Permit issued — Earth Work
X01252589-S2-FO-EA
08/04/2026
485-x construction commenced
07/16/2026
Permit issued — Protection and Mechanical Methods
X01431193-I1-PMM
07/16/2026
Permit issued — Support of Excavation
X01252589-S4-SE
07/15/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01431193-I1
07/13/2026
Signed off — Full Demolition
Full demolition of a 3-story brick and wood frame building.
X01293841-I1
07/07/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/18/2026
Permit issued — Sidewalk Shed
X01417523-I1-SH
Latest 60 of 142 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedInnovative Construction NYC09/08/2026
DOB NOWSidewalk ShedPermit IssuedCore Scaffold Systems08/10/2026
DOB NOWEarth WorkPermit IssuedInnovative Construction NYC08/07/2026
DOB NOWStructuralPermit IssuedInnovative Construction NYC08/06/2026
DOB NOWGeneral ConstructionPermit IssuedInnovative Construction NYC08/05/2026
DOB NOWEarth WorkPermit IssuedInnovative Construction NYC08/04/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCore Scaffold Systems07/16/2026
DOB NOWSupport of ExcavationPermit IssuedInnovative Construction NYC07/16/2026
DOB NOWSidewalk ShedPermit IssuedAce Group NY06/18/2026
DOB NOWSupported ScaffoldPermit IssuedCore Scaffold Systems06/12/2026
DOB NOWMechanical SystemsPermit IssuedInnovative Construction NYC06/10/2026
DOB NOWFull DemolitionSigned-offN Tech Design of America06/10/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCore Scaffold Systems06/08/2026
DOB NOWSprinklersPermit IssuedPrime Piping & Heating04/17/2026
DOB NOWStandpipePermit IssuedPrime Piping & Heating04/17/2026
DOB NOWPlumbingPermit IssuedPrime Piping & Heating04/17/2026
DOB NOWStandpipePermit IssuedPrime Piping & Heating04/17/2026
DOB NOWConstruction FencePermit IssuedInnovative Construction NYC04/14/2026
BISOTISSUEDPlumbing & Heating & Drainage08/31/1992
BISPLISSUEDPlumbing Heaating & Drainage08/31/1992
BISPLISSUEDYost & Campbell02/13/1990
BISOTISSUED4 Gees General Contracting12/13/1989
1 project · most recent 09/04/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/04/2026Permit IssuedInnovative Construction NYCHeating and Air Conditioning Systems
Heat / Cool
Amana PTH073J35 7,000 BTU · Ptac ×137
PTH123J35 11,600 BTU · Ptac ×62
PTH153J35 14,400 BTU · Ptac ×32
PBH113G35CC 11,500 BTU · Ptac ×14
PTH093J35 9,000 BTU · Ptac ×7
Daikin 3MXS24WMVJU9 24,000 BTU · Heat Pump Outdoor ×1
RXF12AXVJU 13,500 BTU · Heat Pump Outdoor ×1
1 project · most recent 09/04/2026
Sprinkler System
FiledStatusContractorScope
09/04/2026Permit IssuedPrime Piping & HeatingSprinkler System
1 project · most recent 09/04/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/04/2026Permit IssuedPrime Piping & HeatingGas, Storm, Water/Sanitary
7 projects · most recent 07/15/2026
General Wiring
FiledStatusContractorScope
07/15/2026Permit IssuedSolas Electrical—
06/16/2026Permit IssuedHigh Quality Electric of NYC—
06/05/2026Permit IssuedSolas Electrical—
05/27/2026Permit IssuedIntelogic Electric—
12/17/2025Permit IssuedM.R. Electrical ServiceGeneral Wiring
11/24/2025Permit IssuedFirst Quality Electrical1 meters, 1 new_meters
11/24/2025Permit IssuedFirst Quality ElectricalGeneral Wiring
1 project · most recent 09/04/2026
Concrete
FiledStatusContractorScope
09/04/2026Permit IssuedInnovative Construction NYCConcrete
4 projects · most recent 09/04/2026
Sidewalk Shed Fence Scaffold
FiledStatusContractorScope
09/04/2026Permit IssuedInnovative Construction NYCFence
08/10/2026Permit IssuedCore Scaffold SystemsSidewalk Shed
06/16/2026Permit IssuedAce Group NYSidewalk Shed
06/04/2026Permit IssuedCore Scaffold SystemsScaffold
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/21/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/07/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 85
DateRequirementInspectorRole
09/14/2026Subsurface Investigations (Borings/Test Pits)Bin Lispecial
09/14/2026Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
09/14/2026Subsurface Conditions – Fill Placement & In-Place DensitySHAHRIAR QUAYYUMspecial
09/14/2026FinalSHAHRIAR QUAYYUMprogress
09/14/2026Footing and FoundationSHAHRIAR QUAYYUMprogress
09/14/2026Deep Foundation ElementsSHAHRIAR QUAYYUMspecial
09/14/2026Subgrade InspectionsSHAHRIAR QUAYYUMspecial
08/27/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
08/27/2026Lighting in dwelling unitsSHAHRIAR QUAYYUMenergy_progress
08/27/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
08/27/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
08/27/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
08/27/2026Exterior lighting powerSHAHRIAR QUAYYUMenergy_progress
08/27/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
08/27/2026Air barrier — testing SHAHRIAR QUAYYUMenergy_progress
08/27/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
08/27/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
08/27/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
08/27/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
08/27/2026Protection of exposed foundation insulationSHAHRIAR QUAYYUMenergy_progress
08/27/2026MeteringSHAHRIAR QUAYYUMenergy_progress
08/27/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
08/27/2026Electrical motors and elevatorsSHAHRIAR QUAYYUMenergy_progress
08/27/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
08/13/2026Structural Steel - Details—special
Latest 25 of 85.
▾Documents — 97 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/18/2026X01293841-I1Request digital key ↗
08/18/2026X01252589-I1Request digital key ↗
08/18/2026X01252589-P2Request digital key ↗
Showing 3 of 18 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWRestrictive Declaration/Easement 15
08/18/2026X01252589-I1Open ↗
08/18/2026X01252589-P2Open ↗
08/18/2026X01252589-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/18/2026X01252589-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/18/2026X01252589-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/18/2026X01252589-I1Open ↗
▸Seals & Professional Certifications46
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/18/2026X01252589-S7Open ↗
08/18/2026X01252589-S6Open ↗
08/18/2026X01252589-S5Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
10/15/2026X01252589-S2Open ↗
10/05/2026X01252589-P2Open ↗
09/30/2026X01252589-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
10/05/2026X01252589-P2Open ↗
09/30/2026X01252589-I1Open ↗
09/30/2026X01252589-I1Open ↗
Showing 3 of 12 on file for this type
▸Trade Schedules & Equipment6
▸DOB NOWElectric Cut-Off1
08/18/2026X01293841-I1Open ↗
▸DOB NOWWater Cut-Off1
08/18/2026X01293841-I1Open ↗
▸DOB NOWGas Cut-Off1
08/18/2026X01293841-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/18/2026X01293841-I1Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/18/2026X01252589-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/18/2026X01252589-I1—
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/18/2026X01252589-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/18/2026X01252589-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWRodent Control1
08/18/2026X01293841-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026X01293841-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT4
08/18/2026X01252589-P3Open ↗
08/18/2026X01252589-P1Open ↗
08/18/2026X01252589-S4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/18/2026X01252589-S2Open ↗
08/18/2026X01252589-S4Open ↗
▸Other Documents9
▸DOB NOWProperty Ownership Certification2
08/18/2026X01252589-I1Open ↗
08/13/2026X01293841-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/18/2026X01252589-S4Open ↗
08/18/2026X01252589-S2Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/18/2026X01293841-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026X01293841-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/18/2026X01252589-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/18/2026X01252589-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/18/2026X01293841-I1Open ↗