← Back
Three families
22 REVERE PLACE
BROOKLYN · BIN 3030525
💬 Discuss this project
1897Year Built
2Stories
C0Building Class
R6Zoning
2,495 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Three families · 1,542 sf lot · 1.62 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalCivil
Roof3p · 1 filing · 20 docs
Floor 24p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
Basement3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PSA BROOKLYN DEVELOPMENT LLC1503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/24/2025$2.1M—22 REVERE PLACE TOWNHOUSE LLC → Private party$834/sf building
07/19/2023$1.2M—Private party → 22 REVERE PLACE TOWNHOUSE LLC$483/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PETER CHO ARCHITECTS, PLLC307/23/2024
CL ENGINEERING P.C.206/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TWO BROTHERS K CONST CORPGeneral Contractor303/21/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
VMC PLUMBING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781507/23/2024
Building Lifecycle
All (57)Filed (5)Permit Issued (2)Signed Off (2)Violation (15)Inspection (5)Special Inspection (28)
11/24/2025
Violation issued (HPD, open)
I
08/14/2024
Signed off — Alteration
INTERIOR RENOVATION ON EXISITING TWO (2) FAMILY, THREE (3) STORY MASONRY RESIDENTIAL BUILDING WORK INCLUDING NEW MECHANICAL SYSTEM. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00908641-S1
07/26/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
07/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
07/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
07/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
07/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
07/23/2024
Filed — Alteration
INTERIOR RENOVATION ON EXISITING TWO (2) FAMILY, THREE (3) STORY MASONRY RESIDENTIAL BUILDING WORK INCLUDING NEW MECHANICAL SYSTEM. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00908641-P3
07/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/28/2024
Filed — Alteration
INTERIOR RENOVATION ON EXISITING TWO (2) FAMILY, THREE (3) STORY MASONRY RESIDENTIAL BUILDING WORK INCLUDING NEW MECHANICAL SYSTEM. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00908641-P2
06/27/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
06/27/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
06/27/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
06/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
06/27/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
06/24/2024
Signed off — Alteration
INTERIOR RENOVATION ON EXISITING TWO (2) FAMILY, THREE (3) STORY MASONRY RESIDENTIAL BUILDING WORK INCLUDING NEW MECHANICAL SYSTEM. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00908641-I1
06/21/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
06/06/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
06/06/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
06/06/2024
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
06/06/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
06/06/2024
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
06/06/2024
Special inspection requirement — Duct leakage testing, insulation and design
CHRISTIAN LOZADA
06/06/2024
Special inspection requirement — Ventilation and air distribution system
CHRISTIAN LOZADA
06/06/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
06/05/2024
Filed — Alteration
INTERIOR RENOVATION ON EXISITING TWO (2) FAMILY, THREE (3) STORY MASONRY RESIDENTIAL BUILDING WORK INCLUDING NEW MECHANICAL SYSTEM. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00908641-P1
06/05/2024
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
06/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
06/05/2024
Special inspection requirement — Ventilation and air distribution system
CHRISTIAN LOZADA
06/05/2024
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
06/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
06/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
06/05/2024
Special inspection requirement — Duct leakage testing, insulation and design
CHRISTIAN LOZADA
06/05/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
06/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
02/02/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/17/2024
Permit issued — Plumbing
B00908641-S1-PL
12/22/2023
Permit issued — General Construction
B00908641-I1-GC
12/21/2023
Filed — Alteration
INTERIOR RENOVATION ON EXISITING TWO (2) FAMILY, THREE (3) STORY MASONRY RESIDENTIAL BUILDING WORK INCLUDING NEW MECHANICAL SYSTEM. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00908641-S1
12/21/2023
Filed — Alteration
INTERIOR RENOVATION ON EXISITING TWO (2) FAMILY, THREE (3) STORY MASONRY RESIDENTIAL BUILDING WORK INCLUDING NEW MECHANICAL SYSTEM. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00908641-I1
07/02/2012
Violation issued (HPD, closed)
B
07/02/2012
Violation issued (HPD, closed)
B
07/02/2012
Violation issued (HPD, closed)
B
07/02/2012
Violation issued (HPD, closed)
B
02/21/2012
Violation issued (HPD, closed)
C
02/03/2012
Violation issued (HPD, closed)
B
02/03/2012
Violation issued (HPD, closed)
B
02/03/2012
Violation issued (HPD, closed)
B
02/03/2012
Violation issued (HPD, closed)
B
02/03/2012
Violation issued (HPD, closed)
B
02/03/2012
Violation issued (HPD, closed)
B
02/03/2012
Violation issued (HPD, closed)
B
01/29/2012
Violation issued (HPD, closed)
B
01/29/2012
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM. SPINELLI PLB & HTG INC01/17/2024
DOB NOWGeneral ConstructionSigned-offTWO BROTHERS K CONST CORP12/22/2023
1 project · most recent 06/20/2024
General Wiring
FiledStatusContractorScope
06/20/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/21/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/02/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/02/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
07/26/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
07/26/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
07/26/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
07/26/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
07/26/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
06/27/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
06/27/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
06/27/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
06/27/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
06/27/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
06/06/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
06/06/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
06/06/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
06/06/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
06/06/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
06/06/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
06/06/2024Duct leakage testing, insulation and designCHRISTIAN LOZADAenergy_progress
06/06/2024Ventilation and air distribution systemCHRISTIAN LOZADAenergy_progress
06/06/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
06/05/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
06/05/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
06/05/2024Ventilation and air distribution systemCHRISTIAN LOZADAenergy_progress
06/05/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
06/05/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
06/05/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
Latest 25 of 28.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026B00908641-P3Request digital key ↗
08/26/2026B00908641-P2Request digital key ↗
08/26/2026B00908641-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits5
▸DOB NOWLPC Approval/Permit5
08/26/2026B00908641-I1Open ↗
08/26/2026B00908641-P2Open ↗
08/26/2026B00908641-S1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature8
08/28/2026B00908641-P2Open ↗
08/28/2026B00908641-P2Open ↗
08/27/2026B00908641-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026B00908641-P2Open ↗
08/26/2026B00908641-S1Open ↗
08/26/2026B00908641-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026B00908641-P2Open ↗
08/27/2026B00908641-S1Open ↗
08/25/2026B00908641-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026B00908641-P2Open ↗
08/26/2026B00908641-S1Open ↗
08/26/2026B00908641-I1Open ↗
Showing 3 of 5 on file for this type