22 REVERE PLACE
BROOKLYN · BIN 3030525
💬 Discuss this project
1897Year Built
2Stories
C0Building Class
R6Zoning
2,495 sfGross Floor Area
3Units
Rent Stabilized1 Active Violation ▸FDNY Report ↗
Three families · 1,542 sf lot · 1.62 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof3p · 1 filing · 20 docs
Floor 221p · 1 filing · 20 docs
Floor 119p · 1 filing · 20 docs
Cellar19p · 1 filing · 20 docs
Basement3p · 1 filing · 20 docs
Sub-Basement17p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Psa Brooklyn Development1503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/24/2025$2.1M—22 REVERE PLACE TOWNHOUSE LLC → Private party$834/sf building
07/19/2023$1.2M—Private party → 22 REVERE PLACE TOWNHOUSE LLC$483/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Peter Cho Architects307/23/2024
CL Engineering206/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM Arch1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Two Brothers K ConstructionGeneral Contractor303/21/2026
Power Surge ElectricElectrical103/22/2026
VMC Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL Engineering6781507/23/2024
Building Lifecycle
11/24/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
08/14/2024
Signed off — Alteration
INTERIOR RENOVATION ON EXISITING TWO (2) FAMILY, THREE (3) STORY MASONRY RESIDENTIAL BUILDING WORK INCLUDING NEW MECHANICAL SYSTEM. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00908641-S1
07/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
07/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
07/26/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
57 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM. Spinelli PLB & Heating01/17/2024
DOB NOWGeneral ConstructionSigned-offTwo Brothers K Construction12/22/2023
1 project · most recent 06/20/2024
General Wiring
FiledStatusContractorScope
06/20/2024CompletePower Surge ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/21/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/02/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/02/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
07/26/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
07/26/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
07/26/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
07/26/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
07/26/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
06/27/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
06/27/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
06/27/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
06/27/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
06/27/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
06/06/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
06/06/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
06/06/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
06/06/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
06/06/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
06/06/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
06/06/2024Duct leakage testing, insulation and designCHRISTIAN LOZADAenergy_progress
06/06/2024Ventilation and air distribution systemCHRISTIAN LOZADAenergy_progress
06/06/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
06/05/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
06/05/2024Ventilation and air distribution systemCHRISTIAN LOZADAenergy_progress
06/05/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
06/05/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
06/05/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
06/05/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
Latest 25 of 28.
32 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account