← Back
Parochial school, yeshiva
Our Lady Queen of Peace School
22 STEELE AVENUE · New Dorp-Midland Beach · BIN 5107549
💬 Discuss this project
1958Year Built
2Stories
W2Building Class
R3XZoning
33,100 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Parochial school, yeshiva · 51,500 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
22 STEELE AVENUE BOROUGH STATEN I1307/08/2026
OUR LADY QUEEN OF PEACE SCHOOL103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PERMANEN ENGINEERING INTERNATIONAL,408/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KAS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SCARAN OIL SERVICE INCGeneral Contractor407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RELIANCE ENGINEERING, P.C322408/13/2021
Building Lifecycle
All (27)Filed (4)Permit Issued (3)Signed Off (3)Violation (6)Special Inspection (11)
11/07/2025
Violation issued (FDNY_ORDER, closed)
06/15/2023
Violation issued (FDNY_ORDER, closed)
10/07/2021
Signed off — Alteration
INSTALLATION OF SPLIT SYSTEM AC UNIT. PROPOSED 1 CONDENSING UNITAT REAR OF EXISTING BUILDING ON BRACKETS. INSTALLATION OF 1 AC UNIT AT 1ST FLOOR CLASSROOM. NO CHANGE IN BULK, USE, OCCUPANCY AND/OR EGRESS.
S00556274-I1
09/01/2021
Permit issued — Mechanical Systems
S00556274-I1-MS
08/13/2021
Filed — Alteration
INSTALLATION OF SPLIT SYSTEM AC UNIT. PROPOSED 1 CONDENSING UNITAT REAR OF EXISTING BUILDING ON BRACKETS. INSTALLATION OF 1 AC UNIT AT 1ST FLOOR CLASSROOM. NO CHANGE IN BULK, USE, OCCUPANCY AND/OR EGRESS.
S00556274-I1
08/13/2021
Special inspection requirement — Energy Code Compliance Inspections
Ralph Giorgio
07/12/2021
Special inspection requirement — Maintenance information
Ralph Giorgio
07/12/2021
Special inspection requirement — Mechanical Systems
Ralph Giorgio
07/12/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Giorgio
07/12/2021
Special inspection requirement — Final
Ralph Giorgio
07/12/2021
Special inspection requirement — Permanent certificate
Ralph Giorgio
09/14/2020
Signed off — Alteration
INSTALLATION OF SPLIT SYSTEM AC UNIT. PROPOSED 2 CONDENSING UNITS AT REAR OF EXISTING BUILDING ON BRACKETS. INSTALLATION OF 2 AC UNIT AT 1ST FLOOR CLASSROOMS. NO CHANGE IN BULK,USE, OCCUPANCY AND/OR EGRESS.
S00386345-I1
09/09/2020
Filed — Alteration
INSTALLATION OF SPLIT SYSTEM AC UNIT. PROPOSED 2 CONDENSING UNITS AT REAR OF EXISTING BUILDING ON BRACKETS. INSTALLATION OF 2 AC UNIT AT 1ST FLOOR CLASSROOMS. NO CHANGE IN BULK,USE, OCCUPANCY AND/OR EGRESS.
S00386345-P1
09/09/2020
Special inspection requirement — Mechanical Systems
Ralph Giorgio
09/09/2020
Special inspection requirement — Final
Ralph Giorgio
09/09/2020
Special inspection requirement — Maintenance information
Ralph Giorgio
09/09/2020
Special inspection requirement — HVAC insulation and sealing
Ralph Giorgio
09/09/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Giorgio
08/21/2020
Permit issued — Mechanical Systems
S00386345-I1-MS
08/18/2020
Filed — Alteration
INSTALLATION OF SPLIT SYSTEM AC UNIT. PROPOSED 2 CONDENSING UNITS AT REAR OF EXISTING BUILDING ON BRACKETS. INSTALLATION OF 2 AC UNIT AT 1ST FLOOR CLASSROOMS. NO CHANGE IN BULK,USE, OCCUPANCY AND/OR EGRESS.
S00386345-I1
10/08/2019
Signed off — Alteration
INSTALLATION OF SPLIT SYSTEM AC UNIT. PROPOSED 2 CONDENSING UNITS AT FRONT OF EXISTING BUILDING ON BRACKETS. INSTALLATION OF 2 AC UNIT AT 1ST FLOOR CLASSROOMS. NO CHANGE IN BULK, USE, OCCUPANCY AND/OR EGRESS.
S00217171-I1
09/05/2019
Permit issued — Mechanical Systems
S00217171-I1-MS
09/04/2019
Filed — Alteration
INSTALLATION OF SPLIT SYSTEM AC UNIT. PROPOSED 2 CONDENSING UNITS AT FRONT OF EXISTING BUILDING ON BRACKETS. INSTALLATION OF 2 AC UNIT AT 1ST FLOOR CLASSROOMS. NO CHANGE IN BULK, USE, OCCUPANCY AND/OR EGRESS.
S00217171-I1
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/18/1989
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSCARAN OIL SERVICE INC09/01/2021
DOB NOWMechanical SystemsSigned-offSCARAN OIL SERVICE INC08/21/2020
DOB NOWMechanical SystemsSigned-offSCARAN OIL SERVICE INC09/05/2019
BISOTISSUEDMARUVO CONST.CORPDBAL.RUSSO FENC11/17/2005
BISMHISSUEDSCARAN PLUMBING INC05/09/2005
BISBLISSUEDSCARAN OIL SERVICE CO INC07/30/2003
BISMHISSUEDSCARAN PLBG, INC.07/24/2003
2 projects · most recent 10/01/2019
General Wiring
FiledStatusContractorScope
10/01/2019CompleteWILLDAN ELECTRICAL OF NYGeneral Wiring
09/11/2018Permit IssuedD.R.P. ELEC'L CONTRG INC1 meters
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
08/13/2021Energy Code Compliance InspectionsRalph Giorgioprogress
07/12/2021Maintenance informationRalph Giorgioenergy_progress
07/12/2021Mechanical SystemsRalph Giorgiospecial
07/12/2021Fire-Resistant Penetrations and JointsRalph Giorgiospecial
07/12/2021FinalRalph Giorgioprogress
07/12/2021Permanent certificateRalph Giorgioenergy_progress
09/09/2020Mechanical SystemsRalph Giorgiospecial
09/09/2020FinalRalph Giorgioprogress
09/09/2020Maintenance informationRalph Giorgioenergy_progress
09/09/2020HVAC insulation and sealing Ralph Giorgioenergy_progress
09/09/2020Fire-Resistant Penetrations and JointsRalph Giorgiospecial
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/26/2026S00217171-I1Request digital key ↗
08/26/2026S00386345-I1Request digital key ↗
08/15/2026S00386345-P1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/25/2026S00556274-I1Request digital key ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature7
08/25/2026S00556274-I1Open ↗
08/25/2026S00556274-I1Open ↗
08/25/2026S00556274-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026S00217171-I1Open ↗
08/13/2026S00386345-P1Open ↗
08/13/2026S00556274-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/25/2026S00556274-I1Open ↗
08/25/2026S00556274-I1Open ↗
08/23/2026S00386345-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026S00217171-I1Open ↗
08/13/2026S00386345-I1Open ↗
08/13/2026S00556274-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00556274-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026S00386345-I1Open ↗
08/13/2026S00386345-P1Open ↗
08/13/2026S00556274-I1Open ↗