← Back
Multi-story retail building (2+)
22 VAN BRUNT ROAD
QUEENS · BIN 4315106
💬 Discuss this project
1931Year Built
2Stories
K2Building Class
C3AZoning
4,230 sfGross Floor Area
3Units
2 Open Violations ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: THE EAST SIDE BOAT CLUB INC. · 8,190 sf lot · 0.52 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanical
Roof2p · 1 filing · 17 docs
Bulkhead2p · 1 filing · 17 docs
Floor 33p · 1 filing · 17 docs
Floor 23p · 1 filing · 17 docs
Floor 11p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MXM CONTRACTORS607/08/2026
THE OWNER OF103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AVID DESIGNS, INC207/10/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MXM CONTRACTORS INCGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AVID DESIGNS, INC.453107/10/2025
JOADEM CORPORATION4350107/10/2025
Building Lifecycle
All (106)Filed (2)Permit Issued (2)Violation (9)Objection (63)Special Inspection (30)
04/01/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/01/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/06/2025
Objection resolved — Addressed
10/06/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
07/29/2025
Objection raised — Zoning
07/29/2025
Objection raised — Zoning
07/29/2025
Objection raised — Other
07/29/2025
Objection raised — Admin
07/29/2025
Objection raised — Structural
07/29/2025
Objection raised — Fire_Protection
07/29/2025
Objection raised — Other
07/29/2025
Objection raised — Zoning
07/29/2025
Objection raised — Zoning
07/29/2025
Objection raised — Zoning
07/29/2025
Objection raised — Zoning
07/29/2025
Objection raised — Zoning
07/29/2025
Objection raised — Energy
07/29/2025
Objection raised — Scope
07/29/2025
Objection raised — Fire_Protection
07/29/2025
Objection raised — Fire_Protection
07/29/2025
Objection raised — Fire_Protection
07/29/2025
Objection raised — Admin
07/29/2025
Objection raised — Fire_Protection
07/29/2025
Objection raised — Fire_Protection
07/29/2025
Objection raised — Fire_Protection
07/29/2025
Objection raised — Fire_Protection
07/29/2025
Objection raised — Fire_Protection
07/29/2025
Objection raised — Admin
07/29/2025
Objection raised — Zoning
07/29/2025
Objection raised — Structural
07/29/2025
Objection raised — Structural
07/29/2025
Objection raised — Scope
07/29/2025
Objection raised — Zoning
07/29/2025
Objection raised — Zoning
07/29/2025
Objection raised — Scope
07/29/2025
Objection raised — Zoning
07/29/2025
Objection raised — Zoning
07/29/2025
Objection raised — Zoning
07/29/2025
Objection raised — Zoning
07/29/2025
Objection raised — Zoning
07/29/2025
Objection raised — Zoning
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedMXM CONTRACTORS INC05/01/2025
DOB NOWConstruction FencePermit IssuedMXM CONTRACTORS INC10/21/2024
1 project · most recent 07/10/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/10/2025——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MSZ-FS06NA 8,700 BTU · Heat Pump Outdoor ×2
PEFYP54NMHSU-E4 / PUHY-P72TNU-A 60,000 BTU · Vrf Outdoor ×2
PEFYP72NMHSU-E / PUHY-P72TNU-A 80,000 BTU · Vrf Outdoor ×2
SLZ-KF18NA / MUZ-KA18NA2 20,900 BTU · Heat Pump Outdoor ×2
Ventilation
Broan A80 80 CFM · Exhaust Fan ×4
Greenheck BSQ-160 2,600 CFM · Kitchen Exhaust ×1
BSQ-180 4,600 CFM · Kitchen Exhaust ×1
CUBE-160 2,700 CFM · Kitchen Exhaust ×1
CUBE-220 4,800 CFM · Kitchen Exhaust ×1
1 project · most recent 07/10/2025
Steel Concrete
FiledStatusContractorScope
07/10/2025——Steel, Concrete
1 project · most recent 04/17/2023
Fence
FiledStatusContractorScope
04/17/2023Permit IssuedMXM CONTRACTORS INCFence
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
07/08/2025Deep Foundation ElementsOLULADE ADEMOKUNspecial
07/01/2025Ventilation and air distribution systemJeffrey Gearyenergy_progress
07/01/2025Protection of exposed foundation insulationJeffrey Gearyenergy_progress
07/01/2025Duct leakage testing, insulation and designJeffrey Gearyenergy_progress
05/09/2025Lighting controlsJeffrey Gearyenergy_progress
05/09/2025Structural Cold-Formed SteelOLULADE ADEMOKUNspecial
05/09/2025Fenestration areasJeffrey Gearyenergy_progress
05/09/2025Air barrier - visual inspectionJeffrey Gearyenergy_progress
05/09/2025HVAC-R and service water piping design and insulationJeffrey Gearyenergy_progress
05/09/2025Maintenance informationJeffrey Gearyenergy_progress
05/09/2025HVAC-R and service water heating equipmentJeffrey Gearyenergy_progress
05/09/2025HVAC-R and service water heating system controlsJeffrey Gearyenergy_progress
05/09/2025Shutoff dampersJeffrey Gearyenergy_progress
05/09/2025Fenestration air leakageJeffrey Gearyenergy_progress
05/09/2025Insulation placement and R valuesJeffrey Gearyenergy_progress
05/09/2025Interior lighting powerJeffrey Gearyenergy_progress
05/09/2025Fenestration and door U-factor and product ratingsJeffrey Gearyenergy_progress
05/08/2025Concrete - PrecastOLULADE ADEMOKUNspecial
05/08/2025Fire-Resistant Penetrations and JointsJeffrey Gearyspecial
05/08/2025MasonryJeffrey Gearyspecial
05/08/2025Structural Steel - High Strength BoltingOLULADE ADEMOKUNspecial
05/08/2025Subgrade InspectionsJeffrey Gearyspecial
05/08/2025Wood – Metal-Plate-Connected Trusses—special
05/08/2025Concrete – PrestressedOLULADE ADEMOKUNspecial
05/08/2025Structural Steel - DetailsOLULADE ADEMOKUNspecial
Latest 25 of 30.
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026Q01138271-I1Request digital key ↗
08/15/2026Q00851748-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01138271-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q01138271-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01138271-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWSpecial Inspector Seal & Signature6
08/31/2026Q01138271-I1Open ↗
08/31/2026Q01138271-I1Open ↗
08/31/2026Q01138271-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026Q01138271-I1Open ↗
08/31/2026Q01138271-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026Q01138271-I1Open ↗
08/13/2026Q00851748-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01138271-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026Q01138271-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01138271-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/19/2026Q01138271-I1Open ↗