| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/29/2026 | Permit Issued | L&K PARTNERS, INC | Heating and Air Conditioning Systems | Heat / Cool Daikin FXSQ48TBVJU 40,500 BTU · Vrf Indoor ×9 FXSQ54TBVJU 45,700 BTU · Vrf Indoor ×6 FXUQ36PVJU 29,600 BTU · Vrf Indoor ×1 RWEQ96TAYDA 8 tons · Vrf Outdoor ×3 WEQ144TAYDA 12 tons · Vrf Indoor ×1 FXUQ36PAVJU 29,600 BTU · Vrf Indoor ×2 RWEQ144TAYDA 12 tons · Vrf Outdoor ×2 |
| 04/06/2026 | Signed-off | JT MAGEN & COMPANY INC | Air Conditioning Systems | Cooling Stulz OHS-24-W-LP 900 CFM · Crac Unit ×2 |
| 01/13/2026 | Signed-off | SCIAME CONSTRUCTION LLC | Air Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Above Air HKW-007S1-4-00000-EC-DC-SFO-HA 21,000 BTU · Crac Unit ×1 HKW-007S1 21,000 BTU · Crac Unit ×1 Mammoth VVW-342-GXS 425,000 BTU · Wshp ×2 Heat / Cool Heating Trane MODEL S 14 kW · Water Heater ×6 DW0B12020G 115,000 BTU ×2 Model S 24,000 BTU · Electric Heater ×2 Cronomite CRONOMITE 4 kW · Water Heater ×1 Ventilation |
| 11/19/2025 | Permit Issued | SCIAME CONSTRUCTION LLC | Heating and Air Conditioning Systems | Heat / Cool Climatemaster SC-048 4 tons · Wshp ×1 |
| 06/25/2025 | Permit Issued | SCIAME CONSTRUCTION LLC | Air Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems | Cooling Mitsubishi Electric TPEFYP036MH142A 85,000 BTU · Vrf Indoor ×2 Heat / Cool Mitsubishi Electric TQHYP0964AL41AN 96,000 BTU · Vrf Outdoor ×1 Heating Qmark ×1 |
| 01/21/2025 | Permit Issued | SCIAME CONSTRUCTION LLC | Air Conditioning Systems | Cooling Vertiv PX029UG 3,900 CFM · Crac Unit ×2 |
| 11/26/2024 | Permit Issued | SCIAME CONSTRUCTION LLC | Air Conditioning Systems | Cooling Moveincool MOVEINCOOL
CLIMATE PRO K36 3 tons ×4 Above Air HKW-012S 500 CFM · Crac Unit ×2 Vertiv PX029DH 4,500 CFM · Crac Unit ×2 |
| 05/21/2024 | Permit Issued | SCIAME CONSTRUCTION LLC | Air Conditioning Systems, Heating Systems | |
| 04/11/2024 | Permit Issued | SCIAME CONSTRUCTION LLC | Air Conditioning Systems, Heating Systems | |
| 03/19/2024 | Permit Issued | SCIAME CONSTRUCTION LLC | Air Conditioning Systems, Heating Systems | |
| 12/04/2023 | Permit Issued | SCIAME CONSTRUCTION LLC | Heating and Air Conditioning Systems | Heat / Cool Climatemaster TCH-018 1 tons · Heat Pump Outdoor ×6 |
| 11/03/2022 | Permit Issued | SCIAME CONSTRUCTION LLC | Air Conditioning Systems, Heating Systems | |
| 03/09/2022 | Permit Issued | SCIAME CONSTRUCTION LLC | Air Conditioning Systems | Cooling Climatemaster TCH018AGSC0NT2S 15 tons · Wshp ×1 TYH024BFSC0GSBS 2 tons · Wshp ×1 TYH042AFSC0GTSS 1,300 CFM · Wshp ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/29/2026 | Signed-off | SIRINA FIRE PROT CORP | Sprinkler System |
| 04/06/2026 | Signed-off | PREFERRED SPKLR AND MECH | Sprinkler System |
| 01/13/2026 | Signed-off | KG SPRINKLER CORP | 1,141 heads |
| 11/19/2025 | Permit Issued | AMI AND ASSOCIATES INC | 4 heads |
| 09/09/2025 | — | — | 23 heads |
| 08/28/2025 | Signed-off | SEAN COAKLEY P & H INC | 166 heads |
| 06/25/2025 | Permit Issued | REAL PLUMBING CORP | — |
| 05/23/2025 | — | — | 85 heads |
| 05/09/2025 | Permit Issued | REAL PLUMBING CORP | 840 heads |
| 01/21/2025 | Permit Issued | MASTER PLBG AND HTG INC | — |
| 11/26/2024 | Signed-off | REAL PLUMBING CORP | — |
| 09/27/2024 | Permit Issued | RRP PLUMBING CORP | Sprinkler System |
| 07/01/2024 | Signed-off | REAL PLUMBING CORP | 724 heads |
| 10/11/2023 | Permit Issued | REAL PLUMBING CORP | 36 heads |
| 03/09/2022 | Signed-off | PAR FIRE PROTECTION LLC | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/29/2026 | Permit Issued | PAR PLUMBING CO., INC | Water/Sanitary |
| 04/06/2026 | Signed-off | ASHLAND PLUMBING CORP | Water/Sanitary |
| 01/13/2026 | Signed-off | DONATO PLUMBING, INC | Water/Sanitary |
| 11/19/2025 | Signed-off | ACCURATE MECH INDSTRS INC | Water/Sanitary |
| 09/09/2025 | — | — | — |
| 08/28/2025 | Signed-off | SEAN COAKLEY P & H INC | Water/Sanitary |
| 06/25/2025 | Signed-off | REAL PLUMBING CORP | Water/Sanitary |
| 05/09/2025 | Permit Issued | GREAT OAKS MECHANICAL INC | Water/Sanitary |
| 01/21/2025 | — | — | Water/Sanitary |
| 11/26/2024 | Signed-off | GREAT OAKS MECHANICAL INC | Water/Sanitary |
| 11/12/2024 | Signed-off | GREAT OAKS MECHANICAL INC | Water/Sanitary |
| 09/27/2024 | Signed-off | RRP PLUMBING CORP | Water/Sanitary |
| 07/01/2024 | Signed-off | GREAT OAKS MECHANICAL INC | Water/Sanitary |
| 05/21/2024 | Signed-off | GREAT OAKS MECHANICAL INC | Water/Sanitary |
| 03/19/2024 | Signed-off | REAL PLUMBING CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/15/2026 | Permit Issued | THOMAS NOTO | General Wiring |
| 12/02/2025 | Permit Issued | CORPORATE ELEC. GROUP INC | — |
| 10/27/2025 | Permit Issued | ERNE VALLEY ELECTRICAL IN | General Wiring |
| 10/14/2025 | Complete | LIVE WIRE ELECTRIC 1 LLC | General Wiring |
| 10/03/2025 | Complete | JRD ELECTRIC CORP. | General Wiring |
| 10/01/2025 | Complete | JRD ELECTRIC CORP. | — |
| 09/11/2025 | Permit Issued | LIVE WIRE ELECTRIC 1 LLC | General Wiring |
| 07/20/2025 | Complete | METROPOLIS ELECTRIC CORP | General Wiring |
| 04/18/2025 | Complete | LIVE WIRE ELECTRIC 1 LLC | General Wiring |
| 04/11/2025 | Permit Issued | ALLRAN ELECTRIC OF NY LLC | — |
| 04/11/2025 | Permit Issued | ALLRAN ELECTRIC OF NY LLC | General Wiring |
| 01/21/2025 | Complete | DAVEN ELECTRIC CORP | — |
| 11/19/2024 | Permit Issued | ERNE VALLEY ELECTRICAL IN | General Wiring |
| 11/07/2024 | Complete | LIVE WIRE ELECTRIC 1 LLC | General Wiring |
| 07/03/2024 | Complete | KLEINKNECHT ELEC. CO.,INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/29/2026 | Permit Issued | L&K PARTNERS, INC | Steel, Concrete |
| 06/18/2026 | Permit Issued | SCIAME CONSTRUCTION LLC | 1 scope_items |
| 01/13/2026 | Signed-off | SCIAME CONSTRUCTION LLC | Steel, Concrete |
| 10/21/2025 | Permit Issued | SEAN COAKLEY P & H INC | Steel, Concrete |
| 06/25/2025 | Permit Issued | SCIAME CONSTRUCTION LLC | Concrete |
| 11/26/2024 | Signed-off | GREAT OAKS MECHANICAL INC | Steel, Concrete |
| 07/01/2024 | Signed-off | REAL PLUMBING CORP | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/05/2025 | Permit Issued | SAFWAY ATLANTIC, LLC | Sidewalk Shed |
| 09/24/2025 | Permit Issued | KING HOIST & SCAFFOLDING | Scaffold |
| 07/29/2025 | Permit Issued | KING HOIST & SCAFFOLDING | Fence |
| Owner | Filings | Most Recent |
|---|---|---|
| MILFORD MANAGEMENT | 198 | 09/25/2026 |
| MILSTEIN PROPERTIES | 191 | 07/08/2026 |
| KINGS GROUP NY CORP | 6 | 07/08/2026 |
| 335 MADISON AVENUE | 114 | 03/22/2026 |
| L K PARTNERS | 2 | 03/22/2026 |
| SCIAME CONSTRUCTION | 9 | 03/22/2026 |
| MB REAL ESTATES | 335 | 03/22/2026 |
| STNY CURTAIN WALLS LLC | 3 | 03/22/2026 |
| 200/10 E 65 STREET CONDO | 1 | 03/22/2026 |
| DAFFY'S | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| SPIVAK ARCHITECTS P.C. | 10 | 08/18/2026 |
| M MOSER ASSOCIATES | 12 | 08/06/2026 |
| POWER CONTINUUM ENGINEERING, DPC | 53 | 07/29/2026 |
| GILSANZ MURRAY STEFICEK LLP | 3 | 07/23/2026 |
| THORNTON TOMASETTI | 14 | 06/18/2026 |
| GENSLER | 8 | 05/12/2026 |
| ROBERT DERECTOR ASSOCIATES | 14 | 04/06/2026 |
| PERKINS EASTMAN | 3 | 04/03/2026 |
| BRAND ACCESS SOLUTIONS | 4 | 12/05/2025 |
| TOHFAZ UDDIN PE PC | 4 | 11/11/2025 |
| FOWLER + FOWLER ARCHITECTURE, D.P.C | 1 | 10/02/2025 |
| PETER F. FARINELLA ARCHITECT, P.C. | 11 | 09/16/2025 |
| HDR | 3 | 09/09/2025 |
| GPI/GREENMAN-PEDERSEN,INC. | 5 | 08/21/2025 |
| WAVIC ENGINEERING PLLC | 1 | 06/27/2025 |
| HDR ARCHITECTURE & ENGINEERING | 1 | 05/29/2025 |
| LEVIN ENGINEERING PLLC | 4 | 05/23/2025 |
| MILFORD CONSULTANTS | 2 | 05/09/2025 |
| M. ZIEMKE ARCHITECTURE, PC | 2 | 04/24/2025 |
| NELSON ARCHITECTURE &INTERIORS, INC | 5 | 04/08/2025 |
| MG ENGINEERING D.P.C. | 3 | 02/03/2025 |
| SHOP ARCHITECTS PC | 8 | 10/22/2024 |
| SUPERSTRUCTURES ENG. + ARCH. | 1 | 10/14/2024 |
| AMA CONSULTING ENGINEERS, PC | 2 | 09/27/2024 |
| GREGORY RALPH, ARCHITECT | 1 | 09/27/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| RPO | 312 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 14 | 03/21/2026 |
| BAIN COMPANY | 24 | 03/21/2026 |
| JP EXPEDITING+DRAFTING SERVICES | 12 | 03/21/2026 |
| SUPERSTRUCTURES ENG + ARCH | 1 | 03/21/2026 |
| UNITED SAFETY CONSULTANTS | 6 | 03/21/2026 |
| CONNECTED USA | 4 | 03/21/2026 |
| BUILDING BROTHERS | 8 | 03/21/2026 |
| Morning Consult | 4 | 03/21/2026 |
| LEVIN ENGINEERING PLLC | 6 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SCIAME CONSTRUCTION LLC | General Contractor | 77 | 07/08/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 40 | 07/08/2026 |
| R.J.C. MECHANICAL CORP | Plumbing | 20 | 07/08/2026 |
| MEGA PLBG CORP | Fire Protection | 19 | 07/08/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 17 | 07/08/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 16 | 07/08/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 13 | 07/08/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 12 | 07/08/2026 |
| L&K PARTNERS, INC | General Contractor | 8 | 09/25/2026 |
| MEGA PLBG CORP | Plumbing | 5 | 07/08/2026 |
| SPIRO SINANIS | Electrical | 5 | 03/21/2026 |
| OUTER IMAGE LLC | General Contractor | 5 | 07/08/2026 |
| KINGS GROUP NY CORP | General Contractor | 4 | 07/08/2026 |
| LEVINE, GEORGE | Fire Protection | 4 | 03/21/2026 |
| MASTER PLBG AND HTG INC | Fire Protection | 4 | 07/08/2026 |
| ICON INTERIORS INC | General Contractor | 3 | 07/08/2026 |
| KING HOIST & SCAFFOLDING | General Contractor | 3 | 04/09/2026 |
| PAR PLUMBING CO., INC | Plumbing | 3 | 07/08/2026 |
| R G M SIGNS | Scaffold | 2 | 07/08/2026 |
| ERNE VALLEY ELECTRICAL IN | Electrical | 2 | 03/22/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 2 | 07/08/2026 |
| PREFERRED SPKLR AND MECH | Fire Protection | 2 | 07/08/2026 |
| RRP PLUMBING CORP | Fire Protection | 2 | 07/08/2026 |
| SEAN COAKLEY P & H INC | Fire Protection | 2 | 07/08/2026 |
| CONCORD PAINTING INC | General Contractor | 2 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| EP INSPECTIONS AND COMMIS | 7079 | 68 | 08/06/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 14 | 04/06/2026 |
| G. BLINN CONSULTING, LLC | 2894 | 2 | 12/05/2025 |
| ATLAS ATC ENGINEERING INC | 8011 | 25 | 08/21/2025 |
| WAVIC ENGINEERING PLLC | 1733 | 1 | 06/27/2025 |
| AK ENGINEERING PC | 678 | 13 | 05/08/2025 |
| GONY ARCHITECT & PLNNER P | 3629 | 7 | 05/13/2024 |
| DELTA TESTING LABS | 687 | 16 | 12/04/2023 |
| CATALPA SPECIAL INSPECTIO | 2004 | 10 | 01/28/2022 |
| MEP INSPECTIONS, INC | 1102 | 6 | 01/21/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Structural | Permit Issued | L&K PARTNERS, INC | 09/24/2026 |
| DOB NOW | General Construction | Permit Issued | L&K PARTNERS, INC | 09/24/2026 |
| DOB NOW | Sprinklers | Permit Issued | MASTER PLBG AND HTG INC | 07/06/2026 |
| DOB NOW | Structural | Permit Issued | SCIAME CONSTRUCTION LLC | 06/24/2026 |
| DOB NOW | Sprinklers | Permit Issued | MEGA PLBG CORP | 04/27/2026 |
| DOB NOW | Plumbing | Permit Issued | R.J.C. MECHANICAL CORP | 04/06/2026 |
| DOB NOW | Structural | Permit Issued | L&K PARTNERS, INC | 01/21/2026 |
| DOB NOW | General Construction | Signed-off | SCIAME CONSTRUCTION LLC | 01/20/2026 |
| DOB NOW | General Construction | Permit Issued | L&K PARTNERS, INC | 01/16/2026 |
| DOB NOW | General Construction | Permit Issued | SCIAME CONSTRUCTION LLC | 01/16/2026 |
| DOB NOW | Plumbing | Permit Issued | R.J.C. MECHANICAL CORP | 01/16/2026 |
| DOB NOW | Plumbing | Signed-off | H M SPRINKLER INC | 01/07/2026 |
| DOB NOW | Plumbing | Signed-off | REAL PLUMBING CORP | 12/23/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | SAFWAY ATLANTIC, LLC | 12/03/2025 |
| DOB NOW | Plumbing | Signed-off | ACCURATE MECH INDSTRS INC | 11/28/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SAFWAY ATLANTIC, LLC | 11/25/2025 |
| DOB NOW | Plumbing | Permit Issued | AMI AND ASSOCIATES INC | 11/24/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | SCIAME CONSTRUCTION LLC | 11/24/2025 |
| DOB NOW | General Construction | Permit Issued | SCIAME CONSTRUCTION LLC | 11/06/2025 |
| DOB NOW | Sprinklers | Permit Issued | R.J.C. MECHANICAL CORP | 10/27/2025 |
| DOB NOW | Sprinklers | Permit Issued | SEAN COAKLEY P & H INC | 10/27/2025 |
| DOB NOW | General Construction | Permit Issued | SCIAME CONSTRUCTION LLC | 10/27/2025 |
| DOB NOW | Sprinklers | Signed-off | ASHLAND PLUMBING CORP | 10/22/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | SCIAME CONSTRUCTION LLC | 10/22/2025 |
| DOB NOW | General Construction | Permit Issued | L&K PARTNERS, INC | 10/17/2025 |
| DOB NOW | Sprinklers | Signed-off | DONATO PLUMBING, INC | 10/08/2025 |
| DOB NOW | Plumbing | Signed-off | PREFERRED SPKLR AND MECH | 10/08/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | KING HOIST & SCAFFOLDING | 10/02/2025 |
| DOB NOW | General Construction | Signed-off | JT MAGEN & COMPANY INC | 10/01/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | JT MAGEN & COMPANY INC | 10/01/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | KING HOIST & SCAFFOLDING | 09/24/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SCIAME CONSTRUCTION LLC | 09/05/2025 |
| DOB NOW | Plumbing | Signed-off | SEAN COAKLEY P & H INC | 09/02/2025 |
| DOB NOW | Plumbing | Signed-off | SEAN COAKLEY P & H INC | 09/02/2025 |
| DOB NOW | Construction Fence | Permit Issued | KING HOIST & SCAFFOLDING | 07/29/2025 |
| DOB NOW | Sprinklers | Signed-off | MASTER PLBG AND HTG INC | 07/18/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | SCIAME CONSTRUCTION LLC | 07/14/2025 |
| DOB NOW | General Construction | Signed-off | SCIAME CONSTRUCTION LLC | 07/03/2025 |
| DOB NOW | Structural | Permit Issued | SCIAME CONSTRUCTION LLC | 07/01/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | SCIAME CONSTRUCTION LLC | 06/24/2025 |
| Date | Type | Result | Report |
|---|---|---|---|
| 06/30/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 06/04/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/28/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/16/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/14/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/07/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/07/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/13/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/12/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/09/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/09/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/04/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/04/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/19/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/18/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 02/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/09/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 02/09/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/09/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 02/03/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/02/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/02/2026 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 01/30/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 01/23/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 01/22/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/30/2026 | Post-installed Anchors | MOLLY GLENN | special |
| 07/30/2026 | Maintenance information | MOLLY GLENN | energy_progress |
| 07/30/2026 | Fire-Resistant Penetrations and Joints | MOLLY GLENN | special |
| 07/30/2026 | Mechanical Systems | MOLLY GLENN | special |
| 07/30/2026 | HVAC-R and service water heating equipment | MOLLY GLENN | energy_progress |
| 07/30/2026 | HVAC-R and service water heating system controls | MOLLY GLENN | energy_progress |
| 07/30/2026 | Final | MOLLY GLENN | progress |
| 07/30/2026 | Interior lighting power | MOLLY GLENN | energy_progress |
| 07/30/2026 | Energy Code Compliance Inspections | MOLLY GLENN | progress |
| 07/30/2026 | Duct leakage testing, insulation and design | MOLLY GLENN | energy_progress |
| 07/30/2026 | HVAC-R and service water piping design and insulation | MOLLY GLENN | energy_progress |
| 07/30/2026 | Lighting controls | MOLLY GLENN | energy_progress |
| 07/27/2026 | Final | MOLLY GLENN | progress |
| 07/27/2026 | Sprayed fire-resistant materials | MOLLY GLENN | special |
| 07/27/2026 | Structural Steel - Welding | MOLLY GLENN | special |
| 07/27/2026 | Structural Stability – Alterations of existing buildings | MOLLY GLENN | special |
| 07/27/2026 | Structural Steel - High Strength Bolting | MOLLY GLENN | special |
| 07/27/2026 | Structural Steel - Details | MOLLY GLENN | special |
| 07/27/2026 | Concrete - Cast-In-Place | MOLLY GLENN | special |
| 07/23/2026 | HVAC-R and service water heating equipment | MOLLY GLENN | energy_progress |
| 07/23/2026 | HVAC-R and service water heating system controls | MOLLY GLENN | energy_progress |
| 07/23/2026 | Sprinkler Systems | MOLLY GLENN | special |
| 07/23/2026 | Maintenance information | MOLLY GLENN | energy_progress |
| 07/23/2026 | Fire-Resistant Penetrations and Joints | MOLLY GLENN | special |
| 07/23/2026 | Energy Code Compliance Inspections | MOLLY GLENN | progress |