← Back
Office with commercial, 7-19 stories
Green Light Energy Conservation
22 WEST 48 STREET · Midtown-Times Square · BIN 1034491
💬 Discuss this project
1940Year Built
15Stories
O6Building Class
C6-4.5Zoning
80,604 sfGross Floor Area
60Units
LL97 Covered5 Open Violations 3 unresolved · 2 paperwork only ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: YADIDI 22 TIC LLC · 6,727 sf lot · 11.98 FAR built · Flood zone X
Locations of Work
Mechanical
Roof2p · 2 filings · 15 docs
Floor 141p · 1 filing · 12 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 71p · 1 filing · 3 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SIONI GROUP1908/29/2026
YADIDI 22 TIC LLC303/22/2026
22 ROCK PLAZA6203/22/2026
22 ROCK PLAZA LLC 525103/22/2026
PAUMI CO NY1703/22/2026
PAUMI COMPANY,NYLP103/22/2026
PAUMIC CO.203/22/2026
PAUMI CO.203/22/2026
DRUNMOND + HILL INC.103/22/2026
OWNER OF PREMISES103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALL CITY ENGINEERING PC507/07/2026
ALLEN SHINFELD, P.E. PLLC112/16/2023
URBAN INTEGRATIONS312/02/2023
ENGINEERING GROUP ASSOCIATES, PC209/05/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.403/21/2026
YOUN DESIGN CORP203/21/2026
UNITED SAFETY CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEYOND COOLING LLCGeneral Contractor707/15/2026
SPRING SCAFFOLDING LLCGeneral Contractor307/08/2026
HINKE, WILLIAMElectrical203/21/2026
STABILE CHRISTOPHERElectrical203/21/2026
CHRISTOPHER STABILEElectrical203/21/2026
ABBASI GENERAL CONSTRUCTIGeneral Contractor207/08/2026
JACKUS, STEVEElectrical203/21/2026
RONALD TESTA, JR.Electrical103/21/2026
SYED-NAQVI ALTAFElectrical103/21/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
DICAPUA, JOHNElectrical103/21/2026
INNER CITY CONTRACTINGElectrical103/21/2026
JOHN DICAPUAElectrical103/21/2026
JOSEPH SORTINOElectrical103/21/2026
NYC TRANSITElectrical103/21/2026
PARISI, DINOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JD ENGINEERING PC9859107/07/2026
ALL CITY ENGINEERING PC7115410/03/2025
Z & T ENGINEERING, P.C.591209/05/2023
Building Lifecycle
All (120)Filed (11)Permit Issued (11)Signed Off (8)Facade (FISP) (9)Violation (60)Inspection (1)Special Inspection (20)
07/16/2026
Signed off — Alteration
FILING FOR OBTAINING CERTIFICATE OF COMPLIANCE OF EXISTING A/C. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
M01397734-I1
07/14/2026
Permit issued — Mechanical Systems
M01397734-I1-MS
07/07/2026
Filed — Alteration
FILING FOR OBTAINING CERTIFICATE OF COMPLIANCE OF EXISTING A/C. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
M01397734-I1
10/23/2025
Signed off — Alteration
FILING FOR OBTAINING CERTIFICATE OF COMPLIANCE OF EXISTING A/C. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
M01266949-I1
10/10/2025
Permit issued — Mechanical Systems
M01266949-I1-MS
10/03/2025
Filed — Alteration
FILING FOR OBTAINING CERTIFICATE OF COMPLIANCE OF EXISTING A/C. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
M01266949-I1
08/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
Liangkai Xia
08/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Liangkai Xia
08/05/2025
Special inspection requirement — Maintenance information
Liangkai Xia
08/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
Liangkai Xia
08/05/2025
Special inspection requirement — Mechanical Systems
Liangkai Xia
08/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Liangkai Xia
08/05/2025
Special inspection requirement — Final
Liangkai Xia
08/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Liangkai Xia
03/14/2025
Signed off — Alteration
FILING FOR OBTAINING CERTIFICATE OF COMPLIANCE OF EXISTING A/C. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
M01163120-I1
03/13/2025
Permit issued — Mechanical Systems
M01163120-I1-MS
02/13/2025
Filed — Alteration
FILING FOR OBTAINING CERTIFICATE OF COMPLIANCE OF EXISTING A/C. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
M01163120-I1
01/16/2025
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
11/18/2024
Permit issued — Sign
M00956950-I1-SG
10/18/2024
Signed off — Alteration
INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00929618-I1
09/09/2024
Cycle 9 facade report signed — SAFE
08/28/2024
Signed off — Alteration
INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00929618-S1
08/27/2024
Permit issued — Sidewalk Shed
M00929618-I1-SH
07/25/2024
Cycle 9 facade report submitted
06/18/2024
Signed off — Alteration
APPLICATION FILED FOR FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00576300-I1
05/29/2024
Cycle 9 facade inspection completed
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/22/2024
Signed off — Alteration
M00972320-I1
01/18/2024
Permit issued — Mechanical Systems
M00972320-I1-MS
01/03/2024
Filed — Alteration
M00972320-I1
12/16/2023
Filed — Alteration
M00956950-I1
12/02/2023
Filed — Alteration
INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00929618-P1
11/02/2023
Permit issued — Structural
M00576300-I1-ST
09/13/2023
Permit issued — Supported Scaffold
M00929618-S1-SF
09/12/2023
Filed — Alteration
INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00929618-I1
09/12/2023
Filed — Alteration
INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00929618-S1
09/12/2023
Permit issued — Sidewalk Shed
M00929618-I1-SH
09/05/2023
Filed — Alteration
APPLICATION FILED FOR FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00576300-P1
09/05/2023
Permit issued — Structural
M00576300-I1-ST
09/05/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fei Zeng
09/05/2023
Special inspection requirement — Final
Fei Zeng
08/28/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fei Zeng
08/28/2023
Special inspection requirement — Final
Fei Zeng
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/03/2022
Violation issued (ECB, open)
Local Law
11/05/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/05/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/05/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/03/2021
Filed — Alteration
APPLICATION FILED FOR FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00576300-I1
01/19/2021
Signed off — Alteration
Install New HVAC system for the office space, no change of use, egress and occupancy
M00440434-I1
01/13/2021
Permit issued — Mechanical Systems
M00440434-I1-MS
01/06/2021
Filed — Alteration
Install New HVAC system for the office space, no change of use, egress and occupancy
M00440434-I1
12/14/2020
Special inspection requirement — Mechanical Systems
ZHAO DENG
12/14/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHAO DENG
12/14/2020
Special inspection requirement — Final
ZHAO DENG
12/14/2020
Special inspection requirement — Energy Code Compliance Inspections
ZHAO DENG
12/14/2020
Special inspection requirement — HVAC and service water heating system controls
ZHAO DENG
12/14/2020
Special inspection requirement — HVAC and service water heating equipment
ZHAO DENG
12/14/2020
Special inspection requirement — HVAC insulation and sealing
ZHAO DENG
Latest 60 of 120 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBEYOND COOLING LLC07/14/2026
DOB NOWMechanical SystemsSigned-offBEYOND COOLING LLC10/10/2025
DOB NOWMechanical SystemsSigned-offBEYOND COOLING LLC03/13/2025
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC11/18/2024
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC08/27/2024
DOB NOWMechanical SystemsSigned-offBEYOND COOLING LLC01/18/2024
DOB NOWStructuralSigned-offABBASI GENERAL CONSTRUCTI11/02/2023
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC09/13/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC09/12/2023
DOB NOWStructuralSigned-offABBASI GENERAL CONSTRUCTI09/05/2023
DOB NOWMechanical SystemsSigned-offBEYOND COOLING LLC01/13/2021
BISOTISSUEDHI-TECH C.P.M. CORP03/27/2020
BISMHISSUEDKTC DESIGN GROUP INC10/24/2018
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR07/13/2017
BISOTISSUEDODYSSIA GLOBAL COMM. CORP02/01/2016
BISPLISSUEDATTACK PLUMBING INC01/05/2016
BIS—ISSUEDHENRYSMITH PROPERTY MGMT01/05/2016
BISOTISSUEDODYSSIA GLOBAL COMM. CORP08/12/2015
BISOTRE-ISSUEDS.M. CONSTRUCTION CO INC02/26/2014
BISOTISSUEDZHONG TAO GROUP CORP01/02/2014
BIS—ISSUEDA.M.A HOLDINGS INC07/30/2013
BISPLISSUEDS & L PLUMBING INC06/28/2013
BISPLISSUEDS & L PLUMBING INC06/28/2013
BISPLISSUEDS & L PLUMBING INC06/28/2013
BISMHISSUEDHI-TECH C.P.M. CORP06/21/2013
BISEQISSUEDSSP CONSTRUCTION CORP05/28/2013
BISOTISSUEDHI-TECH C.P.M. CORP04/12/2013
BISPLISSUEDPETER PLUMBING ASSOC. INC.04/03/2013
BISPLISSUEDPETER PLUMBING ASSOC. INC.04/03/2013
BISOTISSUEDHI-TECH C.P.M. CORP03/26/2013
BISOTISSUEDHI-TECH C.P.M. CORP03/26/2013
BISEQISSUEDSSP CONSTRUCTION CORP03/19/2013
BISMHISSUEDHI-TECH C.P.M. CORP03/11/2013
BISEQISSUEDHI-TECH C.P.M. CORP02/25/2013
BISOTISSUEDHI-TECH C.P.M. CORP02/25/2013
BISOTISSUEDFIVE STAR CARTING LLC01/29/2013
BISOTISSUEDHI-TECH C.P.M. CORP11/27/2012
BISOTISSUEDHI-TECH C.P.M. CORP11/09/2012
BISOTISSUEDFIVE STAR CARTING LLC10/09/2012
BISOTISSUEDFIVE STAR CARTING LLC09/26/2012
+ 21 more permits on file
1 project · most recent 07/07/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/07/2026Signed-offBEYOND COOLING LLCHeating and Air Conditioning Systems
Heat / Cool
Fujitsu AOU48RLAVS4 48,000 BTU · Heat Pump Outdoor ×4
Gree 4LIV12HP115V1AO 12,000 BTU · Heat Pump Outdoor ×1
4 projects · most recent 12/05/2023
General Wiring
FiledStatusContractorScope
12/05/2023CompleteJONG HYUN KIM—
09/07/2023CompleteTOP SHELF ELECTRIC CORP—
07/19/2023CompleteECNY ELEC'L CONTR'S, INCGeneral Wiring
01/16/2018CompleteSTAR ELEC'L CONTRACTORS C—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/16/2025Pass-Final Sign Permit InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
08/05/2025HVAC-R and service water heating equipmentLiangkai Xiaenergy_progress
08/05/2025HVAC-R and service water piping design and insulationLiangkai Xiaenergy_progress
08/05/2025Maintenance informationLiangkai Xiaenergy_progress
08/05/2025HVAC-R and service water heating system controlsLiangkai Xiaenergy_progress
08/05/2025Mechanical SystemsLiangkai Xiaspecial
08/05/2025Fire-Resistant Penetrations and JointsLiangkai Xiaspecial
08/05/2025FinalLiangkai Xiaprogress
08/05/2025Energy Code Compliance InspectionsLiangkai Xiaprogress
09/05/2023Structural Stability – Alterations of existing buildingsFei Zengspecial
09/05/2023FinalFei Zengprogress
08/28/2023Structural Stability – Alterations of existing buildingsFei Zengspecial
08/28/2023FinalFei Zengprogress
12/14/2020Mechanical SystemsZHAO DENGspecial
12/14/2020Fire-Resistant Penetrations and JointsZHAO DENGspecial
12/14/2020FinalZHAO DENGprogress
12/14/2020Energy Code Compliance InspectionsZHAO DENGprogress
12/14/2020HVAC and service water heating system controls ZHAO DENGenergy_progress
12/14/2020HVAC and service water heating equipment ZHAO DENGenergy_progress
12/14/2020HVAC insulation and sealing ZHAO DENGenergy_progress
12/14/2020Maintenance informationZHAO DENGenergy_progress
▾Documents — 350 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch10
09/03/2026M00576300-P1Request digital key ↗
09/03/2026M00576300-I1Request digital key ↗
08/28/2026M00929618-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00440434-I1Request digital key ↗
▸Applications & Permits78
▸BISWORK PERMIT APPLICATION50
03/26/2020140892434Open ↗
12/27/2018123513527Open ↗
07/24/2017110106064Open ↗
Showing 3 of 50 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION27
03/26/2020140892434Open ↗
12/27/2018123513527Open ↗
03/24/2016122521850Open ↗
Showing 3 of 27 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/21/2016122521850Open ↗
▸Seals & Professional Certifications76
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION31
12/27/2018123513527Open ↗
12/27/2018123513527Open ↗
12/27/2018123513527Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/04/2026M00440434-I1Open ↗
09/03/2026M00576300-I1Open ↗
08/28/2026M00929618-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/27/2026M00576300-I1Open ↗
09/23/2026M01266949-I1Open ↗
09/23/2026M01266949-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
03/26/2020140892434Open ↗
12/27/2018123513527Open ↗
01/06/2014121661996Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
12/27/2018123513527Open ↗
01/06/2014121661996Open ↗
11/21/2013121828754Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/27/2026M00576300-I1Open ↗
09/23/2026M01266949-I1Open ↗
08/27/2026M00576300-P1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
03/26/2020140892434Open ↗
05/28/2013140081060Open ↗
03/19/2013140063106Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
03/26/2020140892434Open ↗
05/28/2013140081060Open ↗
03/19/2013140063106Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment21
▸BISSELF-CERT PLUMBING NOTICE11
09/04/2013121577196Open ↗
09/04/2013121554978Open ↗
09/04/2013121554987Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING7
04/01/2013121554987Open ↗
03/29/2013121554978Open ↗
Showing 2 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/24/2016122521850Open ↗
09/29/2015122521850Open ↗
▸BISSIGN HANGER CERTIFICATE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST7
01/14/2016122521850Open ↗
09/29/2015122521850Open ↗
07/29/2013121705137Open ↗
Showing 3 of 7 on file for this type
▸BISST-1 Street Tree Checklist3
04/01/2013121554987Open ↗
04/01/2013121554978Open ↗
Showing 2 of 3 on file for this type
▸Environmental & Asbestos33
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
03/26/2020140892434Open ↗
12/27/2018123513527Open ↗
09/29/2015122521850Open ↗
Showing 3 of 14 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)7
04/01/2013121554987Open ↗
04/01/2013121554987Open ↗
04/01/2013121554978Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/04/2026M00440434-I1Open ↗
09/03/2026M00576300-I1Open ↗
08/28/2026M00972320-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
12/27/2018123513527Open ↗
04/10/2018122410989Open ↗
01/12/2016122521850Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
02/06/2019123513527Open ↗
04/10/2018122410989Open ↗
04/14/2014121828754Open ↗
▸BISTR8: Energy Code Progress Inspections2
04/01/2013121554987Open ↗
04/01/2013121554978Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/26/2020140892434Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/26/2020140892434Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/20/2021140892434Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/04/2026M00440434-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/26/2020140892434Open ↗
05/28/2013140081060Open ↗
03/19/2013140063106Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
02/06/2019123513527Open ↗
▸Approvals, Objections & Sign-offs28
▸BISADMINISTRATIVE OBJECTIONS14
07/29/2013121705137Open ↗
07/29/2013121705128Open ↗
06/27/2013121628587Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
02/06/2019123513527Open ↗
04/10/2018122410989Open ↗
11/17/2017122410989Open ↗
Showing 3 of 12 on file for this type
▸BISSUPERSEDING LETTER1
07/24/2017110106064Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
09/29/2015122521850Open ↗
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT33
03/26/2020140892434Open ↗
02/06/2019123513527Open ↗
12/27/2018123513527Open ↗
Showing 3 of 33 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
08/20/2021140892434Open ↗
▸Filing & Intake Forms31
▸BISEFILING COVER SHEET19
12/27/2018123513527Open ↗
09/29/2015122521850Open ↗
06/11/2015122410989Open ↗
Showing 3 of 19 on file for this type
▸BISADDITIONAL INFORMATION5
04/04/2022140892434Open ↗
08/20/2021140892434Open ↗
04/04/2016122521850Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
02/06/2019123513527Open ↗
04/10/2018122410989Open ↗
11/17/2017122410989Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
03/26/2020140892434Open ↗
05/28/2013140081060Open ↗
03/19/2013140063106Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
09/29/2015122521850Open ↗