← Back
One story retail building
Lijmc-satellite Dialysis Facility
220-10 HILLSIDE AVENUE · BIN 4166343
💬 Discuss this project
1951Year Built
1Stories
K1Building Class
R3-2Zoning
48,078 sfGross Floor Area
10Units
LL97 Covered5 Open Violations 4 unresolved · 1 paperwork only ▸FDNY Report ↗
One story retail building · Owner of record: 22-10 HILLSIDE AVE · 127,700 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Roof1p · 1 filing · 2 docs
Floor 13p · 2 filings · 6 docs
Cellar2p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KEY FOOD607/08/2026
VKW DESIGN106/27/2026
85 EAST 158TH STREET503/22/2026
PINNACLE POSTAL LLC503/22/2026
22-10 HILLSIDE AVE203/22/2026
220-10 HILLSIDE AVE603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VKW DESIGN INC106/17/2026
LIZARDOS ENGINEERING104/14/2026
LAWRENCE GROUP106/19/2025
IW ARCHITECTURE, PLLC204/29/2025
MARIO MENDOZA BLANCO109/26/2023
PAUL PERDEK, PROF. ENG. PLLC105/07/2021
KM CONSULTING ENGINEERS, INC.110/23/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GC1 EXPEDITING203/21/2026
PRAXIS WORKSHOP203/21/2026
NEW YORK SIGN CONSULTANTS403/21/2026
GREEN LIGHT EXPEDITING LLC203/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI BOROUGH SCAFFOLDINGGeneral Contractor407/08/2026
VINCENT CASCONEGeneral Contractor203/21/2026
GOING SIGN SVCNGScaffold207/08/2026
DOUBLE 'R' ELEC'L CONTR'GElectrical103/22/2026
WIRELESS SITES DEVELOPMENT NEWGeneral Contractor107/08/2026
VILLAGE P & H NY INCPlumbing107/08/2026
TOP BUILD CONTRACTORS INCGeneral Contractor106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CC@A ENGINEERING P.C1854104/14/2026
COMPLY BUILDING GROUP8622109/26/2023
KM CONSULTING NY, INC.5305110/23/2018
Building Lifecycle
All (70)Filed (8)Permit Issued (8)Signed Off (5)Violation (23)Inspection (3)Objection (16)Special Inspection (7)
06/26/2026
Signed off — Alteration
MECHANICAL WORK AT ROOF TO ADDRESS FDNY VIOLATION NO. 014252480P. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q01418113-I1
06/23/2026
Permit issued — Mechanical Systems
Q01418113-I1-MS
06/17/2026
Filed — Alteration
MECHANICAL WORK AT ROOF TO ADDRESS FDNY VIOLATION NO. 014252480P. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q01418113-I1
04/14/2026
Filed — Alteration
Q01377847-I1
03/25/2026
Special inspection requirement — Final
03/25/2026
Special inspection requirement — Mechanical Systems
CHAROULIS CHARALAMBOUS
03/25/2026
Special inspection requirement — Energy Code Compliance Inspections
CHAROULIS CHARALAMBOUS
03/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
CHAROULIS CHARALAMBOUS
03/19/2026
Violation issued (FDNY_NOV, closed)
03/19/2026
Violation issued (FDNY_NOV, closed)
08/11/2025
Signed off — Alteration
Interior renovation to 1st floor UPS Store #8121 as per plans. No change in use, egress, or occupancy under this application.
Q01227241-I1
07/10/2025
Violation issued (FDNY_ORDER, closed)
07/10/2025
Violation issued (FDNY_ORDER, closed)
07/01/2025
Signed off — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01206126-I1
07/01/2025
Signed off — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01206130-I1
06/25/2025
Permit issued — General Construction
Q01227241-I1-GC
06/19/2025
Filed — Alteration
Interior renovation to 1st floor UPS Store #8121 as per plans. No change in use, egress, or occupancy under this application.
Q01227241-I1
05/16/2025
Special inspection requirement — Final
MATTHEW LUNDGREN
05/06/2025
Permit issued — Sign
Q01206130-I1-SG
05/06/2025
Permit issued — Sign
Q01206126-I1-SG
04/29/2025
Filed — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01206126-I1
04/29/2025
Filed — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01206130-I1
04/04/2025
Special inspection requirement — Final
Israel Wertentheil
10/04/2024
Violation issued (FDNY_ORDER, closed)
10/04/2024
Violation issued (FDNY_ORDER, closed)
10/04/2024
Violation issued (FDNY_ORDER, closed)
10/04/2024
Violation issued (FDNY_ORDER, closed)
07/25/2024
Violation issued (FDNY_NOV, closed)
04/16/2024
Signed off — Alteration
Replace medical waste piping and RO equipment with minor modifications to domestic water lines. No change in bulk, egress, use, or occupancy under this application.
Q00921592-I1
12/19/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/14/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/14/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/10/2023
Permit issued — Plumbing
Q00921592-I1-PL
09/26/2023
Filed — Alteration
Replace medical waste piping and RO equipment with minor modifications to domestic water lines. No change in bulk, egress, use, or occupancy under this application.
Q00921592-I1
08/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANA ACCETTA
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/12/2021
Permit issued — Sidewalk Shed
Q00512419-I1-SH
05/12/2021
Permit issued — Sidewalk Shed
Q00512419-I1-SF
05/07/2021
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00512419-I1
08/21/2019
Violation issued (FDNY_NOV, closed)
04/25/2019
Permit issued — Antenna
Q00066436-I1-AN
04/08/2019
Objection resolved — Addressed
04/08/2019
Objection resolved — Addressed
04/08/2019
Objection resolved — Addressed
04/08/2019
Objection resolved — Addressed
04/08/2019
Objection resolved — Addressed
04/08/2019
Objection resolved — Addressed
04/08/2019
Objection resolved — Addressed
04/08/2019
Objection resolved — Addressed
10/23/2018
Filed — Alteration
Modification of Existing Antenna Site. Replace (2) existing antennas per sector on the roof. (6 total antennas) Relocate (1) existing equipment cabinet on the existing T-Mobile platform and add (2) ship ladders to the platform. All work is in conformance with TPPN #5/98. No change in use, egress, or occupancy. Carrier: T-Mobile.
Q00066436-I1
10/23/2018
Objection raised — Other
10/23/2018
Objection raised — 1998-AN AC 28-103.14.1-Adminis
10/23/2018
Objection raised — 2014-AN BC 1704-Building Code-
10/23/2018
Objection raised — 2014-AN AC 28-104.11-Building
10/23/2018
Objection raised — 1998-AN AC 28-103.14.1-Adminis
10/23/2018
Objection raised — 2014-AN AC 28-104.7.1-Administ
10/23/2018
Objection raised — 1998-AN BC 501.3-Building Code
10/23/2018
Objection raised — 1998-AN AC 28-103.14.1-Adminis
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTOP BUILD CONTRACTORS INC06/23/2026
DOB NOWGeneral ConstructionSigned-offVINCENT CASCONE06/25/2025
DOB NOWSignSigned-offPOLSINELLI, HENRY05/06/2025
DOB NOWSignSigned-offPOLSINELLI, HENRY05/06/2025
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC10/10/2023
DOB NOWSidewalk ShedPermit IssuedTRI BOROUGH SCAFFOLDING05/12/2021
DOB NOWSidewalk ShedPermit IssuedTRI BOROUGH SCAFFOLDING05/12/2021
DOB NOWAntennaPermit IssuedWIRELESS SITES DEVELOPMEN04/25/2019
BISOTISSUEDNATIONAL MAINTENANCE INC10/04/2017
BISOTISSUEDNATIONAL MAINTENANCE INC10/04/2017
BIS—ISSUEDNATIONAL MAINTENANCE, INC10/04/2017
BIS—ISSUEDNATIONAL MAINTENANCE, INC10/04/2017
BIS—ISSUEDN/A06/07/2016
BISMHISSUEDNAN XIN CONSTRUCTION INC.07/21/2000
5 projects · most recent 08/15/2025
General Wiring
FiledStatusContractorScope
08/15/2025CompleteVOLTRON ELECTRIC LLC1 meters
06/06/2025Permit IssuedSTEEL CITY ELECTRICAL CONGeneral Wiring
12/07/2023CompleteDOUBLE "R" ELEC'L CONTR'GGeneral Wiring
04/30/2021Permit IssuedV. VASS ELECTRIC CORP—
07/01/2019CompleteALL CITY ELECTRICAL INC—
1 project · most recent 05/07/2021
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/07/2021Permit IssuedTRI BOROUGH SCAFFOLDING.&Scaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/14/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
03/25/2026Final—progress
03/25/2026Mechanical SystemsCHAROULIS CHARALAMBOUSspecial
03/25/2026Energy Code Compliance InspectionsCHAROULIS CHARALAMBOUSprogress
03/25/2026Fire-Resistance Rated ConstructionCHAROULIS CHARALAMBOUSprogress
05/16/2025FinalMATTHEW LUNDGRENprogress
04/04/2025FinalIsrael Wertentheilprogress
08/18/2023Fire-Resistant Penetrations and JointsANA ACCETTAspecial
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026Q00512419-I1Request digital key ↗
08/24/2026Q00921592-I1Request digital key ↗
08/20/2026Q01206126-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION7
11/19/2018421231134Open ↗
10/13/2017421552885Open ↗
10/13/2017421552910Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION5
10/13/2017421552885Open ↗
10/13/2017421552910Open ↗
10/13/2017421552929Open ↗
Showing 3 of 5 on file for this type
▸BISPLACE OF ASSEMBLY1
08/06/2013420875627Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/13/2016421231134Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026Q00512419-I1Open ↗
08/20/2026Q01206126-I1Open ↗
08/20/2026Q01206130-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
10/13/2017421552885Open ↗
10/13/2017421552910Open ↗
10/13/2017421552929Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
10/13/2017421552885Open ↗
10/13/2017421552910Open ↗
10/13/2017421552929Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
10/13/2017421552885Open ↗
10/13/2017421552910Open ↗
10/13/2017421552938Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/25/2026Q01227241-I1Open ↗
08/23/2026Q01206130-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026Q00921592-I1Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
10/26/2015421231134Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/20/2026Q01206126-I1Open ↗
08/20/2026Q01206130-I1Open ↗
08/17/2026Q01377847-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/13/2017421552885Open ↗
10/13/2017421552910Open ↗
▸Energy Compliance7
▸BISAS-BUILT ENERGY ANALYSIS4
02/26/2021421552938Open ↗
02/26/2021421552929Open ↗
10/13/2017421552929Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
10/13/2017421552929Open ↗
10/13/2017421552938Open ↗
10/26/2015421231134Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
02/26/2021421552910Open ↗
02/26/2021421552885Open ↗
02/26/2021421552938Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
03/01/2021421552910Open ↗
03/01/2021421552885Open ↗
03/01/2021421552938Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
10/26/2015421231134Open ↗
08/07/2013420875627Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
03/15/2016421231134Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
02/26/2021421552910Open ↗
02/26/2021421552885Open ↗
02/26/2021421552938Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET5
10/19/2017421552910Open ↗
10/19/2017421552938Open ↗
10/19/2017421552885Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION2
10/14/2016421231134Open ↗
04/04/2016421231134Open ↗