One story - permanent living quarter
220-19 135 AVENUE
QUEENS · Laurelton · BIN 4281353
💬 Discuss this project
1950Year Built
1.5Stories
A2Building Class
R3AZoning
1,038 sfGross Floor Area
1Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
One story - permanent living quarter · Owner of record: BABAKAMA 119 LLC · 5,000 sf lot · 0.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 21p · 2 filings · 20 docs
Floor 11 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZMIROT1604/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/30/2025$1.5M—BABAKAMA 119 LLC → Private party$1,444/sf building
11/26/2024$612K—US BANK TRUST NATIONAL ASSOCIATION → BABAKAMA 119 LLC$589/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN608/06/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
26 BONIM LLCGeneral Contractor204/09/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519508/06/2025
Building Lifecycle
All (60)Filed (6)Permit Issued (3)Signed Off (2)Violation (1)Inspection (10)Objection (8)Special Inspection (30)
03/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/11/2025
Special inspection requirement — Interior lighting power
Younes Abouyaala
09/11/2025
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
09/11/2025
Special inspection requirement — Fenestration areas
Younes Abouyaala
09/11/2025
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
09/11/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
09/11/2025
Special inspection requirement — Final
NAVEEN KUMAR
09/11/2025
Special inspection requirement — Footing and Foundation
Younes Abouyaala
09/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
09/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/11/2025
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
09/11/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
09/11/2025
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
09/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
09/11/2025
Special inspection requirement — Electric vehicle service equipment requirements
Younes Abouyaala
09/11/2025
Special inspection requirement — Permanent certificate
Younes Abouyaala
09/11/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
09/11/2025
Special inspection requirement — Metering
Younes Abouyaala
09/11/2025
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
09/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
08/06/2025
Filed — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS.
Q01171261-P2
08/05/2025
Special inspection requirement — Final
NAVEEN KUMAR
08/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
08/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
08/05/2025
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
08/05/2025
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
08/05/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
08/05/2025
Special inspection requirement — Footing and Foundation
Younes Abouyaala
08/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
08/05/2025
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
07/17/2025
Signed off — Alteration
Installation of new plumbing fixtures. File in conjunction with Alt I application number Q01171261.
Q01202680-I1
07/11/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/09/2025
Signed off — Alteration
Installation of a new temporary construction fence.
Q01181447-I1
07/03/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/26/2025
Filed — Alteration
Installation of new plumbing fixtures. File in conjunction with Alt I application number Q01171261.
Q01202680-P1
06/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/29/2025
Filed — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS.
Q01171261-P1
04/17/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/02/2025
Permit issued — Plumbing
Q01202680-I1-PL
03/31/2025
Filed — Alteration
Installation of new plumbing fixtures. File in conjunction with Alt I application number Q01171261.
Q01202680-I1
03/19/2025
Permit issued — Structural
Q01171261-I1-GC-CX
03/12/2025
Objection resolved — Addressed
03/10/2025
Permit issued — Construction Fence
Q01181447-I1-FN
03/10/2025
Objection raised — Other
03/03/2025
Objection resolved — Addressed
03/03/2025
Objection resolved — Addressed
03/03/2025
Objection resolved — Addressed
02/18/2025
Objection raised — Other
02/18/2025
Objection raised — Other
02/18/2025
Objection raised — Other
02/14/2025
Filed — Alteration
Installation of a new temporary construction fence.
Q01181447-I1
02/07/2025
Filed — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS.
Q01171261-I1
12/04/2024
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPLBG P & H INC04/02/2025
DOB NOWStructuralPermit Issued26 BONIM03/19/2025
DOB NOWConstruction FenceSigned-off26 BONIM03/10/2025
1 project · most recent 04/11/2025
General Wiring
FiledStatusContractorScope
04/11/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 08/06/2025
Concrete Wood
FiledStatusContractorScope
08/06/2025Permit Issued26 BONIM LLCConcrete, Wood
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
03/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/11/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/03/2025Fail-Final CND-Occupancy InspectionFailView ↗
06/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/17/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/17/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
09/11/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/11/2025Subsurface Investigations (Borings/Test Pits)BRIAN FLYNNspecial
09/11/2025Subgrade InspectionsYounes Abouyaalaspecial
09/11/2025Concrete - Cast-In-PlaceYounes Abouyaalaspecial
09/11/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
09/11/2025Structural Wood FrameYounes Abouyaalaprogress
09/11/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
09/11/2025FinalNAVEEN KUMARprogress
09/11/2025Footing and FoundationYounes Abouyaalaprogress
09/11/2025Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
09/11/2025Interior lighting powerYounes Abouyaalaenergy_progress
09/11/2025Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
09/11/2025Insulation placement and R valuesYounes Abouyaalaenergy_progress
09/11/2025Fenestration air leakageYounes Abouyaalaenergy_progress
09/11/2025Fenestration areasYounes Abouyaalaenergy_progress
09/11/2025Electric vehicle service equipment requirementsYounes Abouyaalaenergy_progress
09/11/2025Permanent certificateYounes Abouyaalaenergy_progress
09/11/2025Maintenance informationYounes Abouyaalaenergy_progress
09/11/2025MeteringYounes Abouyaalaenergy_progress
09/11/2025Air barrier - visual inspectionYounes Abouyaalaenergy_progress
08/05/2025Structural Wood FrameYounes Abouyaalaprogress
08/05/2025Concrete - Cast-In-PlaceYounes Abouyaalaspecial
08/05/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/05/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
08/05/2025Subgrade InspectionsYounes Abouyaalaspecial
Latest 25 of 76.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/20/2026Q01181447-I1Request digital key ↗
08/20/2026Q01202680-I1Request digital key ↗
08/20/2026Q01202680-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/19/2026Q01171261-P2Open ↗
08/19/2026Q01171261-P1Open ↗
08/13/2026Q01171261-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/19/2026Q01171261-P1Open ↗
08/19/2026Q01171261-P2Open ↗
08/13/2026Q01171261-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature13
09/24/2026Q01202680-P1Open ↗
09/24/2026Q01202680-P1Open ↗
09/02/2026Q01171261-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/24/2026Q01202680-P1Open ↗
09/02/2026Q01171261-P2Open ↗
09/02/2026Q01171261-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026Q01181447-I1Open ↗
08/19/2026Q01171261-P2Open ↗
08/19/2026Q01171261-P1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/19/2026Q01171261-P2Open ↗
08/19/2026Q01171261-P1Open ↗
08/14/2026Q01171261-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/19/2026Q01171261-P2Open ↗
08/19/2026Q01171261-P1Open ↗
08/14/2026Q01171261-I1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/19/2026Q01171261-P2Open ↗
08/19/2026Q01171261-P1Open ↗
08/13/2026Q01171261-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01171261-I1Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/19/2026Q01171261-P2Open ↗
08/19/2026Q01171261-P1Open ↗
08/13/2026Q01171261-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/19/2026Q01171261-P2Open ↗
08/19/2026Q01171261-P1Open ↗
08/13/2026Q01171261-I1Open ↗
▸DOB NOWPlot Diagram3
08/19/2026Q01171261-P2Open ↗
08/19/2026Q01171261-P1Open ↗
08/13/2026Q01171261-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/19/2026Q01171261-P2Open ↗
08/19/2026Q01171261-P1Open ↗
08/14/2026Q01171261-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01171261-I1Open ↗