Two stories - detached, small or mid-size
220-35 135 AVENUE
QUEENS · Laurelton · BIN 4281349
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R3AZoning
1,218 sfGross Floor Area
1Units
2 Open Violations ▸
Two stories - detached, small or mid-size · Owner of record: U.S. BANK NATIONAL ASSOCIATION, AS CO-TR USTEE · 3,700 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PRIME DESIGN GROUP LLC208/11/2026
Building Lifecycle
All (38)Filed (2)Violation (3)Objection (15)Special Inspection (18)
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Cost
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/11/2026
Filed — Alteration CO
HORIZONTAL ENLARGEMENT & CONVERSION TO 2 FAMILIES
Q01416635-I1
08/11/2026
Filed — Alteration CO
HORIZONTAL ENLARGEMENT & CONVERSION TO 2 FAMILIES
Q01416635-S2
08/11/2026
Special inspection requirement — Protection of exposed foundation insulation
08/11/2026
Special inspection requirement — Concrete - Cast-In-Place
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/11/2026
Special inspection requirement — Masonry
08/11/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
08/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
08/11/2026
Special inspection requirement — Lowest Floor Elevation
08/11/2026
Special inspection requirement — Air barrier - visual inspection
08/11/2026
Special inspection requirement — Interior lighting power
08/11/2026
Special inspection requirement — Exterior lighting power
08/11/2026
Special inspection requirement — Maintenance information
08/11/2026
Special inspection requirement — Fenestration areas
08/11/2026
Special inspection requirement — Fenestration air leakage
08/11/2026
Special inspection requirement — Permanent certificate
08/11/2026
Special inspection requirement — Insulation placement and R values
08/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/10/2015
Violation issued (HPD, closed)
C
07/10/2015
Violation issued (HPD, open)
B
07/10/2015
Violation issued (HPD, open)
B
Nothing on file for this building.
1 project · most recent 08/11/2026
Fence
FiledStatusContractorScope
08/11/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
08/11/2026Protection of exposed foundation insulation—energy_progress
08/11/2026Concrete - Cast-In-Place—special
08/11/2026Fire-Resistant Penetrations and Joints—special
08/11/2026Masonry—special
08/11/2026Subsurface Investigations (Borings/Test Pits)—special
08/11/2026Energy Code Compliance Inspections—progress
08/11/2026Fire-Resistance Rated Construction—progress
08/11/2026Lowest Floor Elevation—progress
08/11/2026Air barrier - visual inspection—energy_progress
08/11/2026Interior lighting power—energy_progress
08/11/2026Exterior lighting power—energy_progress
08/11/2026Maintenance information—energy_progress
08/11/2026Fenestration areas—energy_progress
08/11/2026Fenestration air leakage—energy_progress
08/11/2026Permanent certificate—energy_progress
08/11/2026Insulation placement and R values—energy_progress
08/11/2026Fenestration and door U-factor and product ratings—energy_progress
06/13/2026Structural Stability – Alterations of existing buildings—special
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026Q01416635-S2Request digital key ↗
08/16/2026Q01416635-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026Q01416635-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026Q01416635-S1Open ↗
08/16/2026Q01416635-I1Open ↗
08/16/2026Q01416635-S2Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/16/2026Q01416635-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026Q01416635-S1Open ↗
08/16/2026Q01416635-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/16/2026Q01416635-I1Open ↗
▸Other Documents2
▸DOB NOWSite Survey: Initial1
08/16/2026Q01416635-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/16/2026Q01416635-I1Open ↗