← Back
Condo, residential unit in 1-3 story building
House Beautiful Condominium
220-50 64 AVENUE · BIN 4446731
💬 Discuss this project
1980Year Built
3Stories
R3Building Class
R4Zoning
156,994 sfGross Floor Area
212Units
LL97 CoveredRent Stabilized66 Open Violations 65 unresolved · 1 paperwork only ▸FDNY Report ↗
Condo, residential unit in 1-3 story building · 130,909 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction6p · 1 filing · 9 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOUSE BEAUTIFUL CONDO I203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURE STUDIO205/19/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AIS RENOVATIONS CORPGeneral Contractor104/09/2026
THOMAS F. CASH & SONS INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURE STUDIO3777105/19/2025
Building Lifecycle
All (28)Filed (2)Permit Issued (2)Violation (9)Objection (12)Special Inspection (3)
05/06/2026
Violation issued (HPD, closed)
A
04/20/2026
Permit issued — Plumbing
Q01208418-S1-PL
11/21/2025
Violation issued (HPD, closed)
I
10/16/2025
Permit issued — General Construction
Q01208418-I1-GC
06/18/2025
Objection resolved — Addressed
06/11/2025
Violation issued (HPD, closed)
A
05/28/2025
Objection resolved — Addressed
05/28/2025
Objection resolved — Addressed
05/28/2025
Objection resolved — Addressed
05/28/2025
Objection resolved — Addressed
05/28/2025
Objection resolved — Addressed
05/27/2025
Objection raised — Cost
05/27/2025
Objection raised — Fire_Protection
05/23/2025
Objection raised — Mechanical
05/23/2025
Objection raised — Other
05/23/2025
Objection raised — Mechanical
05/23/2025
Objection raised — Structural
05/19/2025
Filed — Alteration
Reconfigure the rear condo layout by combining closets and bathrooms into functional bathroom/laundry room. Remove the wall to the open common area, remodel the kitchen, refinish all flooring, replace baseboard heater covers, and update all crown molding.
Q01208418-S1
05/19/2025
Filed — Alteration
Reconfigure the rear condo layout by combining closets and bathrooms into functional bathroom/laundry room. Remove the wall to the open common area, remodel the kitchen, refinish all flooring, replace baseboard heater covers, and update all crown molding.
Q01208418-I1
04/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Gati
04/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Gati
04/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
William Gati
03/28/2023
Violation issued (HPD, closed)
A
03/03/2022
Violation issued (HPD, closed)
I
03/03/2022
Violation issued (HPD, closed)
A
04/14/2021
Violation issued (HPD, closed)
A
10/15/2015
Violation issued (HPD, closed)
I
02/26/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedTHOMAS F. CASH & SONS INC04/20/2026
DOB NOWGeneral ConstructionPermit IssuedAIS RENOVATIONS CORP10/16/2025
1 project · most recent 05/19/2025
Gas Water/Sanitary
FiledStatusContractorScope
05/19/2025Permit IssuedTHOMAS F. CASH & SONS INCGas, Water/Sanitary
1 project · most recent 11/20/2025
General Wiring
FiledStatusContractorScope
11/20/2025Permit IssuedKJK ELECTRIC INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
04/11/2025Fire-Resistant Penetrations and JointsWilliam Gatispecial
04/11/2025Structural Stability – Alterations of existing buildingsWilliam Gatispecial
04/11/2025Tenant Protection Plan ComplianceWilliam Gatispecial
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026Q01208418-S1Request digital key ↗
08/20/2026Q01208418-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026Q01208418-I1Open ↗
08/28/2026Q01208418-I1Open ↗
08/28/2026Q01208418-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q01208418-I1Open ↗
08/13/2026Q01208418-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q01208418-S1Open ↗
08/13/2026Q01208418-I1Open ↗