← Back
City residence, one family
220 ALBANY AVENUE
BROOKLYN · BIN 3031360
💬 Discuss this project
1889Year Built
2Stories
A4Building Class
R6Zoning
2,176 sfGross Floor Area
1Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
City residence, one family · 1,327 sf lot · 1.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Floor 210p · 1 filing · 20 docs
Floor 111p · 1 filing · 20 docs
Cellar12p · 1 filing · 20 docs
Sub-Basement10p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
220 ALBANY AVE LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/07/2023$999K—— → —$459/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CQ&J CORPORATION404/02/2025
CL ENGINEERING P.C.103/14/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BH GENERAL CONTRACTING INGeneral Contractor407/08/2026
AL PLUMBING & CONT. INCPlumbing107/08/2026
CREATIVE PLUMBING INPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781207/15/2024
Building Lifecycle
All (39)Filed (5)Permit Issued (6)Signed Off (1)Violation (4)Inspection (4)Special Inspection (19)
01/27/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/24/2025
Violation issued (HPD, open)
I
10/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/19/2025
Signed off — Alteration
EXISTING 1 FAMILY BUILDING WITH PLUMBING WORK ON THE BASEMENT, CELLAR, 1ST, AND 2ND FLOORS IN CONJUNCTION WITH ALT2 JOB # B00917687-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00917687-S2
08/04/2025
Permit issued — General Construction
B00917687-I1-GC
07/07/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/20/2025
Permit issued — Plumbing
B00917687-S1-PL
04/02/2025
Filed — Alteration
EXISTING 1 FAMILY BUILDING WITH PLUMBING WORK ON THE BASEMENT, CELLAR, 1ST, AND 2ND FLOORS IN CONJUNCTION WITH ALT2 JOB # B00917687-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00917687-P1
03/31/2025
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
03/31/2025
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
03/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
03/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
03/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
03/21/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
12/03/2024
Violation issued (HPD, open)
I
08/05/2024
Permit issued — Structural
B00917687-S3-ST
07/15/2024
Filed — Alteration
EXISTING 1 FAMILY BUILDING WITH PLUMBING WORK ON THE BASEMENT, CELLAR, 1ST, AND 2ND FLOORS IN CONJUNCTION WITH ALT2 JOB # B00917687-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00917687-S3
06/28/2024
Permit issued — Plumbing
B00917687-S1-PL
06/28/2024
Violation issued (ECB, closed)
Construction
03/26/2024
Permit issued — General Construction
B00917687-I1-GC
03/20/2024
Permit issued — Construction Fence
B00917687-S2-FN
03/14/2024
Filed — Alteration
EXISTING 1 FAMILY BUILDING WITH PLUMBING WORK ON THE BASEMENT, CELLAR, 1ST, AND 2ND FLOORS IN CONJUNCTION WITH ALT2 JOB # B00917687-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00917687-S2
12/07/2023
Filed — Alteration
EXISTING 1 FAMILY BUILDING WITH PLUMBING WORK ON THE BASEMENT, CELLAR, 1ST, AND 2ND FLOORS IN CONJUNCTION WITH ALT2 JOB # B00917687-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00917687-I1
12/07/2023
Filed — Alteration
EXISTING 1 FAMILY BUILDING WITH PLUMBING WORK ON THE BASEMENT, CELLAR, 1ST, AND 2ND FLOORS IN CONJUNCTION WITH ALT2 JOB # B00917687-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00917687-S1
11/28/2023
Violation issued (HPD, open)
I
10/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
10/17/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
10/17/2023
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
10/17/2023
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
10/17/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
10/17/2023
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
10/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
10/17/2023
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
10/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
10/17/2023
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
10/17/2023
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
10/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
10/17/2023
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
10/17/2023
Special inspection requirement — Metering
CHRISTIAN LOZADA
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBH GENERAL CONTRACTING IN08/04/2025
DOB NOWPlumbingPermit IssuedAB PLUMBING INC06/20/2025
DOB NOWStructuralPermit IssuedBH GENERAL CONTRACTING IN08/05/2024
DOB NOWPlumbingPermit IssuedAL PLUMBING & CONT. INC06/28/2024
DOB NOWGeneral ConstructionPermit IssuedBH GENERAL CONTRACTING IN03/26/2024
DOB NOWConstruction FenceSigned-offBH GENERAL CONTRACTING IN03/20/2024
1 project · most recent 04/02/2025
Gas Water/Sanitary
FiledStatusContractorScope
04/02/2025Permit IssuedMETFLOW MECHANICAL LLCGas, Water/Sanitary
1 project · most recent 06/27/2024
General Wiring
FiledStatusContractorScope
06/27/2024Permit IssuedBLZ ELECTRIC INC.General Wiring
1 project · most recent 04/02/2025
Wood
FiledStatusContractorScope
04/02/2025Permit IssuedBH GENERAL CONTRACTING INWood
1 project · most recent 04/02/2025
Fence
FiledStatusContractorScope
04/02/2025Permit IssuedBH GENERAL CONTRACTING INFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/27/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/07/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/21/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
03/31/2025Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
03/31/2025Maintenance informationCHRISTIAN LOZADAenergy_progress
03/31/2025HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
03/31/2025HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
03/31/2025HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
10/17/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
10/17/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
10/17/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
10/17/2023Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
10/17/2023Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
10/17/2023Fenestration air leakageCHRISTIAN LOZADAenergy_progress
10/17/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
10/17/2023Fenestration areasCHRISTIAN LOZADAenergy_progress
10/17/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
10/17/2023Interior lighting powerCHRISTIAN LOZADAenergy_progress
10/17/2023Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
10/17/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
10/17/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
10/17/2023MeteringCHRISTIAN LOZADAenergy_progress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026B00917687-P1Request digital key ↗
08/24/2026B00917687-S3Request digital key ↗
08/24/2026B00917687-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/13/2026B00917687-S3Open ↗
08/13/2026B00917687-I1Open ↗
08/13/2026B00917687-S1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026B00917687-P1Open ↗
08/24/2026B00917687-S3Open ↗
08/24/2026B00917687-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/20/2026B00917687-P1Open ↗
09/20/2026B00917687-P1Open ↗
09/01/2026B00917687-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026B00917687-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026B00917687-S3Open ↗
08/24/2026B00917687-S1Open ↗
08/24/2026B00917687-I1Open ↗
Showing 3 of 4 on file for this type