← Back
Single or multiple dwelling with stores or offices
220 AVENUE B
MANHATTAN · BIN 1005250
💬 Discuss this project
1920Year Built
4Stories
S9Building Class
C1-6AZoning
5,251 sfGross Floor Area
8Units
Rent Stabilized5 Open Violations ▸
Single or multiple dwelling with stores or offices · Owner of record: 220 AVENUE B, LLC · 2,541 sf lot · 2.07 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanical
Floor 110p · 2 filings · 20 docs
Cellar12p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BIG APPLE MANAGEMENT1807/08/2026
220 AVENUE B603/22/2026
OWNER OF 220 AVE B103/22/2026
220 AVE B AQUISITION403/21/2026
220 AVEB ACQUISITION203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MURRAY ENGINEERING PC306/29/2026
WILLIAM F. RYAN, JR. P.E. PC101/31/2024
MARINA FERRANTE-LIBONATI212/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DEXTER NEWMAN503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TEMA BUILDERS GROUP CORPGeneral Contractor607/08/2026
AMOK INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN SPECIAL ENGINEERING2018706/29/2026
VIBRANALYSIS INC., DBA VT6864306/29/2026
Building Lifecycle
All (103)Filed (6)Permit Issued (5)Violation (54)Inspection (2)Objection (6)Special Inspection (30)
07/13/2026
Special inspection requirement — Final
William Ryan
07/13/2026
Special inspection requirement — Post-installed Anchors
William Ryan
07/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
William Ryan
07/13/2026
Special inspection requirement — Structural Steel - Details
JUAN GOMEZ
07/13/2026
Special inspection requirement — Masonry
William Ryan
07/13/2026
Special inspection requirement — Wood – Seismic Resistance
William Ryan
07/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Ryan
07/13/2026
Special inspection requirement — Structural Steel - High Strength Bolting
William Ryan
06/29/2026
Filed — Alteration
NON-STRUCTURAL INTERIOR RENOVATION. NO CHANGE TO EGRESS, USE OR OCCUPANCY. REPLACEMENT OF WINDOWS IN REAR YARD
M00971523-P3
06/10/2026
Special inspection requirement — Final
William Ryan
06/10/2026
Special inspection requirement — Masonry
William Ryan
06/10/2026
Special inspection requirement — Post-installed Anchors
William Ryan
06/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Ryan
06/10/2026
Special inspection requirement — Structural Steel - Details
JUAN GOMEZ
06/10/2026
Special inspection requirement — Structural Steel - High Strength Bolting
William Ryan
06/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
William Ryan
06/10/2026
Special inspection requirement — Wood – Seismic Resistance
William Ryan
04/29/2026
Violation issued (HPD, closed)
A
01/20/2026
Filed — Alteration
NON-STRUCTURAL INTERIOR RENOVATION. NO CHANGE TO EGRESS, USE OR OCCUPANCY. REPLACEMENT OF WINDOWS IN REAR YARD
M00971523-P2
09/03/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/09/2024
Permit issued — Structural
M00971523-S1-ST
04/17/2024
Permit issued — Mechanical Systems
M00988549-I1-MS
04/03/2024
Filed — Alteration
NON-STRUCTURAL INTERIOR RENOVATION. NO CHANGE TO EGRESS, USE OR OCCUPANCY. REPLACEMENT OF WINDOWS IN REAR YARD
M00971523-S1
03/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/27/2024
Permit issued — General Construction
M00971523-I1-GC
02/08/2024
Objection raised — Other
02/08/2024
Objection resolved — Addressed
02/08/2024
Objection raised — Other
02/08/2024
Objection resolved — Addressed
02/08/2024
Objection raised — Other
02/08/2024
Objection resolved — Addressed
01/31/2024
Filed — Alteration
PROVIDE MECHNICAL DESIGN FOR CELLAR AND FIRST FLOOR STOREFRONT. PROVIDE (1) NEW AIR-COOLED CONDENSING UNIT. PROVIDE (2) SPLIT HEAT PUMP UNITS.
M00988549-I1
01/31/2024
Special inspection requirement — Shutoff dampers
William Ryan
01/29/2024
Permit issued — Plumbing
M00972361-I1-PL
01/19/2024
Special inspection requirement — Tenant Protection Plan Compliance
William Ryan
01/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
01/10/2024
Special inspection requirement — HVAC-R and service water heating system controls
William Ryan
01/10/2024
Special inspection requirement — Mechanical Systems
William Ryan
01/10/2024
Special inspection requirement — Final
William Ryan
01/10/2024
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
01/10/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
William Ryan
01/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
William Ryan
01/08/2024
Permit issued — General Construction
M00971523-I1-GC
12/19/2023
Filed — Alteration
NON-STRUCTURAL INTERIOR RENOVATION. NO CHANGE TO EGRESS, USE OR OCCUPANCY. REPLACEMENT OF WINDOWS IN REAR YARD
M00971523-I1
12/19/2023
Filed — Alteration
RENOVATION OF EXISTING STORE PLUMBING. NO CHANGE TO USE EGRESS OR OCCUPANCY
M00972361-I1
12/18/2023
Special inspection requirement — Exterior lighting power
Marina Ferrante-Libonati
12/18/2023
Special inspection requirement — Interior lighting power
Marina Ferrante-Libonati
12/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
12/18/2023
Special inspection requirement — Fenestration air leakage
Marina Ferrante-Libonati
12/18/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Marina Ferrante-Libonati
05/21/2023
Violation issued (HPD, closed)
B
04/12/2023
Violation issued (HPD, closed)
C
04/12/2023
Violation issued (HPD, closed)
C
04/12/2023
Violation issued (HPD, closed)
C
04/12/2023
Violation issued (HPD, closed)
B
04/12/2023
Violation issued (HPD, closed)
B
04/12/2023
Violation issued (HPD, closed)
B
04/12/2023
Violation issued (HPD, closed)
B
04/12/2023
Violation issued (HPD, closed)
C
03/15/2023
Violation issued (HPD, closed)
A
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offTEMA BUILDERS GROUP CORP05/09/2024
DOB NOWMechanical SystemsPermit IssuedTEMA BUILDERS GROUP CORP04/17/2024
DOB NOWGeneral ConstructionPermit IssuedTEMA BUILDERS GROUP CORP02/27/2024
DOB NOWPlumbingSigned-offAMOK INC01/29/2024
DOB NOWGeneral ConstructionPermit IssuedTEMA BUILDERS GROUP CORP01/08/2024
BISOTISSUEDWATERWORKS PLG & HTG01/13/1999
BISPLISSUEDCATMAN PLUMBING INC07/08/1998
BISPLISSUEDMORTON CHAIT09/18/1996
BISMHISSUEDG & G CONSTRUCTION09/18/1996
BISOTISSUEDG & G CONSTRUCTION &DEVELOP.CORP04/09/1996
BISOTISSUEDG & G CONSTRUCTION &DEVELOP.CORP04/09/1996
BISOTISSUEDG & G CONSTRUCTION &DEVELOP.CORP04/09/1996
BISPLISSUEDMORTON CHAIT PLUMBING01/25/1996
BISPLISSUEDMORTON CHAIT PLUMBING01/25/1996
BISPLISSUEDMORTON CHAIT PLUMBING01/24/1996
BISOTISSUEDDBA ANATOLE BOHDANOWYCZ12/20/1995
BISOTISSUEDDBA ANATOLE BOHDANOWYCZ11/09/1995
BISOTISSUEDG & G CONSTRUCTION &DEVELOP.CORP10/17/1995
BISMHISSUEDG & G CONSTRUCTION &DEVELOP.CORP10/13/1995
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.09/21/1995
BISOTISSUEDG & G CONSTRUCTION &DEVELOP.CORP09/07/1995
1 project · most recent 01/31/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/31/2024Permit IssuedTEMA BUILDERS GROUP CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric (1) PKFY-P18NLMU-E-TH (2) PKFY-P18NLMU-E-TH (3) PKFY-P18NLMU-E-TH (4) PKFY-P18NLMU-E-TH 18,000 BTU · Fan Coil Indoor ×4
(5) PKFY-P18NLMU-E-TH (6) PKFY-P18NLMU-E-TH (7) PKFY-P18NLMU-E-TH 18,000 BTU · Vrf Indoor ×3
(1) PUMY-P60NKMU2 (2) PUMY-P60NKMU2 5 tons · Vrf Outdoor ×2
(8) PKFY-P18NLMU-E-TH 18,000 BTU · Vrf Indoor ×1
Ventilation
Mitsubishi Electric LGH-F470RVX-E 470 CFM · Erv ×1
1 project · most recent 02/02/2024
General Wiring
FiledStatusContractorScope
02/02/2024CompleteTWINTECH ELECTRIC INCGeneral Wiring
1 project · most recent 06/29/2026
Steel Masonry Wood
FiledStatusContractorScope
06/29/2026Signed-offTEMA BUILDERS GROUP CORPSteel, Masonry, Wood
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
07/13/2026FinalWilliam Ryanprogress
07/13/2026Post-installed AnchorsWilliam Ryanspecial
07/13/2026Tenant Protection Plan ComplianceWilliam Ryanspecial
07/13/2026Structural Steel - DetailsJUAN GOMEZspecial
07/13/2026MasonryWilliam Ryanspecial
07/13/2026Wood – Seismic ResistanceWilliam Ryanspecial
07/13/2026Structural Stability – Alterations of existing buildingsWilliam Ryanspecial
07/13/2026Structural Steel - High Strength BoltingWilliam Ryanspecial
06/10/2026FinalWilliam Ryanprogress
06/10/2026MasonryWilliam Ryanspecial
06/10/2026Post-installed AnchorsWilliam Ryanspecial
06/10/2026Structural Stability – Alterations of existing buildingsWilliam Ryanspecial
06/10/2026Structural Steel - DetailsJUAN GOMEZspecial
06/10/2026Structural Steel - High Strength BoltingWilliam Ryanspecial
06/10/2026Tenant Protection Plan ComplianceWilliam Ryanspecial
06/10/2026Wood – Seismic ResistanceWilliam Ryanspecial
01/31/2024Shutoff dampersWilliam Ryanenergy_progress
01/19/2024Tenant Protection Plan ComplianceWilliam Ryanspecial
01/10/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
01/10/2024HVAC-R and service water heating system controlsWilliam Ryanenergy_progress
01/10/2024Mechanical SystemsWilliam Ryanspecial
01/10/2024FinalWilliam Ryanprogress
01/10/2024Energy Code Compliance InspectionsWilliam Ryanprogress
01/10/2024HVAC-R and service water piping design and insulationWilliam Ryanenergy_progress
01/10/2024HVAC-R and service water heating equipmentWilliam Ryanenergy_progress
Latest 25 of 36.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/28/2026M00972361-I1Request digital key ↗
08/27/2026M00971523-P2Request digital key ↗
08/27/2026M00971523-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature18
08/30/2026M00971523-P1Open ↗
08/30/2026M00971523-P1Open ↗
08/30/2026M00971523-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
08/30/2026M00971523-P1Open ↗
08/28/2026M00972361-I1Open ↗
08/26/2026M00971523-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026M00988549-I1Open ↗
08/27/2026M00971523-P2Open ↗
08/27/2026M00971523-P1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/27/2026M00971523-P2Open ↗
08/27/2026M00971523-P1Open ↗
08/27/2026M00971523-S1Open ↗
Showing 3 of 7 on file for this type