← Back
BuildNYC
Church, synagogue, chapel
220 EAST 118TH STREET
MANHATTAN · BIN 1052631
💬 Discuss this project
1920Year Built
1Stories
M1Building Class
R7AZoning
1,500 sfGross Floor Area
2Units
4 Active Violations ▸
Church, synagogue, chapel · Owner of record: 118 Standard Realty · 5,046 sf lot · 0.3 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofAssembly of Pentecostal ChurchUnder Construction11p · 1 filing · 12 docs
Floor 2Assembly of Pentecostal ChurchUnder Construction11p · 1 filing · 12 docs
Floor 1Assembly of Pentecostal ChurchUnder Construction28p · 3 filings · 14 docs
MezzanineAssembly of Pentecostal ChurchUnder Construction6p · 1 filing · 12 docs
CellarAssembly of Pentecostal ChurchUnder Construction21p · 1 filing · 12 docs
Site & exteriorAssembly of Pentecostal ChurchUnder Construction13p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Vanguard Investors907/08/2026
Assembly of Pentescostal Church609/13/2026
ZLB110/07/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/20/2025$235K—— → —$157/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Nikolai Katz Architect110/06/2026
KN3 Engineering105/27/2026
SU Architect205/22/2026
Bangash Associates111/26/2025
Scalar Architecture107/09/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution203/21/2026
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Everest ScaffoldingScaffold607/08/2026
Teamwork EnterprisesGeneral Contractor208/16/2026
Topline NYCScaffold204/09/2026
Agius Plumbing & HeatingPlumbing108/20/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Leo Y Lee Associates2481105/27/2026
SU Architect6857205/22/2026
Building Lifecycle
All (48)Filed (6)Permit Issued (9)Signed Off (1)Violation (9)Objection (10)Special Inspection (13)
10/06/2026
Filed — Alteration
FILING APPLICATION FOR UPDATING METES AND BOUNDS, MERGING ZONING LOT 34,36,37 INTO ONE ZONING LOT REMAINING SEPERATE TAX LOTS.
M01452295-I1
09/01/2026
Special inspection requirement — Final
08/19/2026
Permit issued — Plumbing
M00960729-S2-PL
08/14/2026
Permit issued — General Construction
M00960729-I1-GC
08/14/2026
Permit issued — Structural
M00960729-S1-ST
05/27/2026
Filed — Alteration
EXTERIOR AND INTERIOR RESTORATION OF AN EXISTING 2 STORY WITH CELLAR CHURCH WITH GENERAL CONSTRUCTION WORK. NO CHANGE TO EXISTING BUILDING BULK, USE, EGRESS OR OCCUPANCY.
M00960729-S1
05/22/2026
Filed — Alteration
EXTERIOR AND INTERIOR RESTORATION OF AN EXISTING 2 STORY WITH CELLAR CHURCH WITH GENERAL CONSTRUCTION WORK. NO CHANGE TO EXISTING BUILDING BULK, USE, EGRESS OR OCCUPANCY.
M00960729-S2
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIANG SU
05/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
QIANG SU
05/20/2026
Special inspection requirement — Energy Code Compliance Inspections
QIANG SU
05/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
QIANG SU
05/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
QIANG SU
05/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
QIANG SU
05/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Leo Lee
05/15/2026
Special inspection requirement — Structural Steel - Welding
Leo Lee
05/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Leo Lee
05/15/2026
Special inspection requirement — Post-installed Anchors
Leo Lee
05/15/2026
Special inspection requirement — Wood – Seismic Resistance
Leo Lee
04/23/2026
Special inspection requirement — Final
KUNAL BAKHTARWALA
02/25/2026
Objection raised — Admin
02/25/2026
Objection resolved — Addressed
12/24/2025
Violation issued (ECB, open)
Construction
12/24/2025
Violation issued (ECB, open)
Construction
12/24/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/24/2025
Violation issued (ECB, open)
Construction
11/26/2025
Filed — Alteration
M01323427-I1
11/26/2025
Permit issued — Supported Scaffold
M01323427-I1-SH
11/26/2025
Permit issued — Sidewalk Shed
M01323427-I1-SF
12/01/2023
Objection raised — Scope
12/01/2023
Objection resolved — Addressed
12/01/2023
Objection raised — Scope
12/01/2023
Objection resolved — Addressed
12/01/2023
Objection raised — Scope
12/01/2023
Objection resolved — Addressed
12/01/2023
Objection raised — Scope
12/01/2023
Objection resolved — Addressed
11/28/2023
Filed — Alteration
EXTERIOR AND INTERIOR RESTORATION OF AN EXISTING 2 STORY WITH CELLAR CHURCH WITH GENERAL CONSTRUCTION WORK. NO CHANGE TO EXISTING BUILDING BULK, USE, EGRESS OR OCCUPANCY.
M00960729-I1
07/23/2021
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00059202-I1
04/01/2020
Permit issued — Sidewalk Shed
M00059202-I1-SH
07/03/2019
Permit issued — Sidewalk Shed
M00059202-I1-SH
08/31/2018
Violation issued (ECB, closed)
Construction
07/26/2018
Permit issued — Sidewalk Shed
M00059202-I1-SH
07/10/2018
Permit issued — Sidewalk Shed
M00059202-I1-SH
07/09/2018
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00059202-I1
07/03/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/02/2018
Violation issued (ECB, closed)
Construction
07/23/1998
Violation issued (ECB, closed)
Construction
07/13/1998
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAgius Plumbing & Heating08/19/2026
DOB NOWGeneral ConstructionPermit IssuedTeamwork Enterprises08/14/2026
DOB NOWStructuralPermit IssuedTeamwork Enterprises08/14/2026
DOB NOWSupported ScaffoldPermit IssuedTopline NYC11/26/2025
DOB NOWSidewalk ShedPermit IssuedTopline NYC11/26/2025
DOB NOWSidewalk ShedSigned-offEverest Scaffolding04/01/2020
DOB NOWSidewalk ShedSigned-offEverest Scaffolding07/03/2019
DOB NOWSidewalk ShedSigned-offEverest Scaffolding07/26/2018
DOB NOWSidewalk ShedSigned-offEverest Scaffolding07/10/2018
1 project · most recent 05/27/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/27/2026Permit IssuedAgius Plumbing & HeatingGas, Water/Sanitary
2 projects · most recent 11/27/2025
FiledStatusContractorScope
11/27/2025Permit IssuedRichard Neu—
07/09/2018CompleteBorowide Elect'l Contractors—
1 project · most recent 05/27/2026
Wood
FiledStatusContractorScope
05/27/2026Permit IssuedAgius Plumbing & HeatingWood
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
09/01/2026Final—progress
05/20/2026Fire-Resistant Penetrations and JointsQIANG SUspecial
05/20/2026Tenant Protection Plan ComplianceQIANG SUspecial
05/20/2026Energy Code Compliance InspectionsQIANG SUprogress
05/20/2026HVAC-R and service water heating system controlsQIANG SUenergy_progress
05/20/2026HVAC-R and service water piping design and insulationQIANG SUenergy_progress
05/20/2026HVAC-R and service water heating equipmentQIANG SUenergy_progress
05/15/2026Structural Stability – Alterations of existing buildingsLeo Leespecial
05/15/2026Structural Steel - WeldingLeo Leespecial
05/15/2026Fire-Resistant Penetrations and JointsLeo Leespecial
05/15/2026Post-installed AnchorsLeo Leespecial
05/15/2026Wood – Seismic ResistanceLeo Leespecial
04/23/2026FinalKUNAL BAKHTARWALAprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Assembly of Pentecostal ChurchReligiousCellar, Floors 1, 2, Mezzanine, Roof
Project M00960729 Alteration · Permit Entire · 11/28/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
10/07/2026M01452295-I1Request digital key ↗
09/06/2026M00059202-I1Request digital key ↗
08/20/2026M01323427-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature6
10/07/2026M01452295-I1Open ↗
08/20/2026M01323427-I1Open ↗
08/17/2026M00960729-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026M00960729-S1Open ↗
08/23/2026M00960729-S2Open ↗
08/23/2026M00960729-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026M00960729-S1Open ↗
08/23/2026M00960729-S2Open ↗
08/23/2026M00960729-S2Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026M00960729-S1Open ↗