← Back
BuildNYC
Over six families without stores
220 LENOX AVENUE
MANHATTAN · BIN 1053348
💬 Discuss this project
1889Year Built
4Stories
C1Building Class
R7-2Zoning
—Gross Floor Area
9Units
41 Active Violations 39 unresolved · 2 paperwork only 1 old, status unconfirmed ▸
Over six families without stores · Owner of record: NYC Housing Preservation and Development · 2.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction54p · 1 filing · 20 docs
BulkheadUnder Construction1p · 1 filing · 20 docs
Floor 4Under Construction47p · 1 filing · 20 docs
Floor 3Under Construction52p · 1 filing · 20 docs
Floor 2Under Construction31p · 1 filing · 20 docs
Floor 1Installation of Heavy Duty Sidewalk ShedUnder Construction36p · 2 filings · 20 docs
CellarUnder Construction56p · 2 filings · 20 docs
BasementUnder Construction16p · 1 filing · 20 docs
Site & exteriorInstallation of Temporary Pipe ScaffoldUnder Construction6p · 1 filing · 5 docs
Filed — no permit issued2p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development2810/30/2026
220 Tenant Association103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
McHenery Testing Lab509/29/2026
Romines Architecture309/16/2026
Emtg Consultants709/09/2026
Bazini Engineering105/26/2026
Gilsanz Murray Steficek107/11/2024
McLaren Engineering Group106/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Summit JVGeneral Contractor307/08/2026
Reliable EnterprisesScaffold309/15/2026
L.L.G. Plumbing & HeatingPlumbing310/30/2026
Touchstone RenovationsGeneral Contractor208/14/2026
Remy BuildersElectrical203/21/2026
Casino Plumbing & HeatingFire Protection107/08/2026
Monadnock General ContGeneral Contractor104/09/2026
J & Y Electric and Inter*Electrical103/22/2026
Spectrum ElectricElectrical103/21/2026
ElectricworxnyElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Kce Consulting Engineering37121109/16/2026
Bazini Engineering1808105/26/2026
Building Lifecycle
10/29/2026
Permit issued — Plumbing
M00725682-S1-PL
10/26/2026
Objection raised — Scope
09/29/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01416831-P2
09/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/16/2026
Filed — Alteration CO
BOILER REPLACEMENT FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00725682-P3
155 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedL.L.G. Plumbing & Heating10/29/2026
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises09/14/2026
DOB NOWStructuralPermit IssuedTouchstone Renovations08/13/2026
DOB NOWBoiler EquipmentPermit IssuedL.L.G. Plumbing & Heating06/18/2026
DOB NOWBoiler EquipmentPermit IssuedL.L.G. Plumbing & Heating06/18/2026
DOB NOWSprinklersPermit IssuedCasino Plumbing & Heating06/17/2026
DOB NOWSupported ScaffoldPermit IssuedReliable Enterprises06/16/2026
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises06/15/2026
DOB NOWBoiler EquipmentSigned-offStuart N Schwartz06/01/2026
DOB NOWMechanical SystemsPermit IssuedTouchstone Renovations05/27/2026
DOB NOWGeneral ConstructionPermit IssuedSummit JV03/25/2026
DOB NOWGeneral ConstructionPermit IssuedSummit JV01/16/2026
DOB NOWGeneral ConstructionPermit IssuedSummit JV11/20/2025
DOB NOWGeneral ConstructionPermit IssuedMonadnock General Cont01/27/2025
BISEQISSUEDPowers Bridging & Scaffolding10/30/2009
BISBLISSUEDNuway Fuel Oil Burner04/06/2000
1 project · most recent 09/16/2026
Sprinkler System
FiledStatusContractorScope
09/16/2026Permit IssuedCasino Plumbing & HeatingSprinkler System
1 project · most recent 09/16/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/16/2026Permit IssuedL.L.G. Plumbing & HeatingGas, Storm, Water/Sanitary
5 projects · most recent 06/15/2026
FiledStatusContractorScope
06/15/2026Permit IssuedRichard Neu—
04/20/2026Permit IssuedElectricworxny—
02/04/2026Permit IssuedElectricworxny—
05/14/2022CompleteJ & Y Electric and Inter*—
03/27/2019CompleteDeltex Electrical Cont. I—
1 project · most recent 09/16/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
09/16/2026Permit IssuedL.L.G. Plumbing & HeatingSteel, Concrete, Masonry, Wood
2 projects · most recent 09/29/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
09/29/2026Permit IssuedReliable EnterprisesScaffold
08/11/2026Permit IssuedReliable EnterprisesSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/11/2026Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
08/31/2026Fire-Resistant Penetrations and JointsKemba Walcottspecial
08/31/2026Sprinkler SystemsKemba Walcottspecial
08/31/2026Post-installed AnchorsKemba Walcottspecial
08/18/2026Fire-Resistance Rated ConstructionKemba Walcottprogress
08/18/2026Fire-Resistant Penetrations and JointsKemba Walcottspecial
08/18/2026MasonryKemba Walcottspecial
08/18/2026Sprayed fire-resistant materialsKemba Walcottspecial
05/13/2026Tenant Protection Plan ComplianceJoseph Bazinispecial
05/05/2026Fire-Resistant Penetrations and JointsKemba Walcottspecial
05/05/2026Post-installed AnchorsKemba Walcottspecial
12/31/2025Fire-Resistant Penetrations and JointsKemba Walcottspecial
12/31/2025MasonryKemba Walcottspecial
12/31/2025Sprayed fire-resistant materialsKemba Walcottspecial
12/31/2025Fire-Resistance Rated ConstructionKemba Walcottprogress
12/31/2025Construction Utilizing CLT or SCL, Type IVKemba Walcottspecial
11/19/2025Sprayed fire-resistant materialsKemba Walcottspecial
11/19/2025MasonryKemba Walcottspecial
11/19/2025Fire-Resistant Penetrations and JointsKemba Walcottspecial
11/19/2025Fire-Resistance Rated ConstructionKemba Walcottprogress
06/26/2024Structural Wood FrameKemba Walcottprogress
05/15/2024Heating SystemsKemba Walcottspecial
05/15/2024Post-installed AnchorsKemba Walcottspecial
05/15/2024Heating SystemsKemba Walcottspecial
04/22/2024Post-installed AnchorsKemba Walcottspecial
04/22/2024Structural Stability – Alterations of existing buildingsKemba Walcottspecial
Latest 25 of 37.
112 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account