← Back
BuildNYC
Four families
220 VAN BUREN STREET
BROOKLYN · BIN 3043714
💬 Discuss this project
1931Year Built
3Stories
C3Building Class
R6BZoning
3,420 sfGross Floor Area
4Units
Rent Stabilized12 Active Violations ▸FDNY Report ↗
Four families · 1,900 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInstallation of solar panels8p · 2 filings · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tom Petersen Architect212/31/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Centurion Solar EnergyGeneral Contractor104/09/2026
Solar ContractingGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Thomas Petersen Architect7854212/31/2025
Building Lifecycle
09/03/2026
Permit expired, never signed off — Solar
The city's record still shows this permit as issued, with no sign-off on its filing
B01271894-I1-SL
05/29/2026
Signed off — Alteration
B01340606-I1
05/06/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
04/07/2026
Permit issued — Solar
B01340606-I1-SL
12/31/2025
Filed — Alteration
B01340606-I1
29 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSolar Contracting04/07/2026
DOB NOWSolarPermit IssuedCenturion Solar Energy09/03/2025
3 projects · most recent 04/29/2026
General Wiring
FiledStatusContractorScope
04/29/2026CompleteSolar Electric Contractng—
04/15/2026CompleteVillage Electl ContractorsGeneral Wiring
08/11/2025Permit IssuedBerger Quality Electrical Con—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/29/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
12/29/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
12/29/2025Energy Code Compliance InspectionsTOM PETERSENprogress
12/29/2025FinalTOM PETERSENprogress
12/29/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
12 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account