← Back
Church, synagogue, chapel
West Prep Academy
219 WEST 107 STREET · Upper West Side-Manhattan Valley · BIN 1081589
💬 Discuss this project
1900Year Built
1Stories
M1Building Class
R8BZoning
43,700 sfGross Floor Area
2Units
8 Open Violations 4 unresolved · 4 paperwork only ▸
Church, synagogue, chapel · 17,925 sf lot · 2.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingLandscapeGeneralOther
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 3 docs
Floor 48p · 1 filing · 17 docs
Floor 36p · 1 filing · 17 docs
Floor 22p · 2 filings · 9 docs
Floor 1Under Construction7p · 2 filings · 20 docs
MezzanineUnder Construction2p · 1 filing · 20 docs
CellarUnder Construction9p · 5 filings · 20 docs
Sub-Basement2p · 1 filing · 20 docs
Site & exteriorUnder Construction34p · 4 filings · 20 docs
Filed — no permit issued51p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ASCENSION CHURCH1407/08/2026
NEW YORK CITY PUBLIC SCHOOL1207/08/2026
THE CHURCH OF THE ASCENSION907/08/2026
PLATINUM SERVICES NY703/22/2026
ARCHDIOCESE OF NEW YORK503/21/2026
ARCHDIOCESE503/21/2026
Z facilities Management303/22/2026
EXPERT ENTERPRISES303/21/2026
NYCSCA203/21/2026
SCHOOL OF ASCENSION103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC103/21/2026
ROBERT S SCHNITZER1603/21/2026
BLANCO DESIGN, INC203/21/2026
ROCK ARCH ENG CORP203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
STRONG STEEL DOOR103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATINUM SERVICES NY LLCGeneral Contractor603/21/2026
PIPE RITE CORPPlumbing407/08/2026
MJH ENERGY CONSULTING INCPlumbing307/08/2026
BIG CITY BOILER LLCGeneral Contractor303/21/2026
NIKA CONTRACTING GROUP COGeneral Contractor207/08/2026
EXPERT GROUPENTERPRISE INGeneral Contractor107/08/2026
MELVYN ZWEBNERElectrical103/21/2026
CANIDO BASONAS CONST SVCGeneral Contractor107/08/2026
HAL OZKURTElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC LOGISTICS DBA JPCL EN351709/13/2024
VENTROP ENGINEERING CONSU450802/21/2022
Building Lifecycle
All (44)Filed (24)Permit Issued (13)Signed Off (7)
04/13/2026
Permit issued — Structural
M01101814-S2-ST
04/13/2026
Permit issued — Structural
M01101814-S2-GC
07/25/2025
Filed — Alteration
M01256187-I1
06/27/2025
Filed — Alteration
M01230317-I1
06/20/2025
Signed off — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01030722-I1
02/17/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01043102-I1
09/13/2024
Filed — Alteration
Construction of a new exterior vertical lift.
M01101814-S2
08/27/2024
Filed — Alteration
Construction of a new exterior vertical lift.
M01101814-I1
08/27/2024
Filed — Alteration
Construction of a new exterior vertical lift.
M01101814-S1
08/13/2024
Filed — Alteration
Installing supplemental split AC systems and Energy Recovery Ventilators for Gym/Auditorium and Cafeteria
M01090206-I1
08/13/2024
Filed — Alteration
Installing supplemental split AC systems and Energy Recovery Ventilators for Gym/Auditorium and Cafeteria
M01090206-S1
07/22/2024
Permit issued — Plumbing
M01047872-S1-PL
07/18/2024
Signed off — Alteration
M00394169-I1
07/18/2024
Signed off — Alteration
(2) new gas boilers with Hydronic piping, replacement of chimney liner (flue) & supports, new FAI fan & storm proof louver, new CO, & Smoke detection, insulation for new and affected piping.
M00479077-I1
06/13/2024
Filed — Alteration
Installation of two windows ACs, one exhaust fan and a transfer duct to the Hydroponic classroom.
M01047872-S1
06/13/2024
Filed — Alteration
Installation of two windows ACs, one exhaust fan and a transfer duct to the Hydroponic classroom.
M01047872-S2
06/13/2024
Filed — Alteration
Installation of two windows ACs, one exhaust fan and a transfer duct to the Hydroponic classroom.
M01047872-I1
06/11/2024
Permit issued — General Construction
M01030722-I1-GC
05/29/2024
Permit issued — Suspended Scaffold
M01048456-I1-SC
05/13/2024
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy
M01048456-I1
05/06/2024
Filed — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01030722-I1
05/03/2024
Permit issued — Sidewalk Shed
M01043102-I1-SH
05/03/2024
Permit issued — Supported Scaffold
M01043102-I1-SF
05/02/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01043102-I1
07/10/2023
Filed — No Work
M00891522-I1
05/17/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00029491-I1
03/21/2022
Signed off — Alteration
Mechanical work for (2) new gas boilers (BR-1, BR-2). Work includes pumps, boiler controller, replacement of chimney liner (flue), FAI fan, louver, CO/NG/Smoke detection system, insulation for new & affected piping, goose-neck vent for gas meter room.
M00393589-I1
02/22/2022
Signed off — Alteration
New gas metering rig, and related gas piping risers to supply two (2) new (replacement) gas fired boilers (BR-1 & BR-2), secondary RPZ for Boiler Fill water, and one (1) Gas DHWH for domestic hot water all in Cellar. No change to use, egress, or occupancy
M00386362-I1
02/21/2022
Filed — Alteration
Mechanical work for (2) new gas boilers (BR-1, BR-2). Work includes pumps, boiler controller, replacement of chimney liner (flue), FAI fan, louver, CO/NG/Smoke detection system, insulation for new & affected piping, goose-neck vent for gas meter room.
M00393589-P1
10/04/2021
Permit issued — Plumbing
M00386362-I1-PL
09/22/2021
Filed — Alteration
New gas metering rig, and related gas piping risers to supply two (2) new (replacement) gas fired boilers (BR-1 & BR-2), secondary RPZ for Boiler Fill water, and one (1) Gas DHWH for domestic hot water all in Cellar. No change to use, egress, or occupancy
M00386362-P3
07/20/2021
Filed — Alteration
New gas metering rig, and related gas piping risers to supply two (2) new (replacement) gas fired boilers (BR-1 & BR-2), secondary RPZ for Boiler Fill water, and one (1) Gas DHWH for domestic hot water all in Cellar. No change to use, egress, or occupancy
M00386362-P2
03/26/2021
Permit issued — Boiler Equipment
M00479077-I1-BE
03/08/2021
Filed — Alteration
(2) new gas boilers with Hydronic piping, replacement of chimney liner (flue) & supports, new FAI fan & storm proof louver, new CO, & Smoke detection, insulation for new and affected piping.
M00479077-I1
03/03/2021
Filed — Alteration
New gas metering rig, and related gas piping risers to supply two (2) new (replacement) gas fired boilers (BR-1 & BR-2), secondary RPZ for Boiler Fill water, and one (1) Gas DHWH for domestic hot water all in Cellar. No change to use, egress, or occupancy
M00386362-P1
10/07/2020
Permit issued — Mechanical Systems
M00393589-I1-MS
09/28/2020
Permit issued — Boiler Equipment
M00394169-I1-BE
09/28/2020
Permit issued — Plumbing
M00386362-I1-PL
09/14/2020
Filed — Alteration
M00394169-I1
09/14/2020
Filed — Alteration
Mechanical work for (2) new gas boilers (BR-1, BR-2). Work includes pumps, boiler controller, replacement of chimney liner (flue), FAI fan, louver, CO/NG/Smoke detection system, insulation for new & affected piping, goose-neck vent for gas meter room.
M00393589-I1
09/14/2020
Filed — Alteration
New gas metering rig, and related gas piping risers to supply two (2) new (replacement) gas fired boilers (BR-1 & BR-2), secondary RPZ for Boiler Fill water, and one (1) Gas DHWH for domestic hot water all in Cellar. No change to use, egress, or occupancy
M00386362-I1
07/25/2018
Filed — Alteration
M00064394-I1
03/29/2018
Permit issued — Sidewalk Shed
M00029491-I1-SH
03/23/2018
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00029491-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedNIKA CONTRACTING GROUP CO04/13/2026
DOB NOWStructuralPermit IssuedNIKA CONTRACTING GROUP CO04/13/2026
DOB NOWPlumbingSigned-offMJH ENERGY CONSULTING INC07/22/2024
DOB NOWGeneral ConstructionSigned-offCANIDO BASONAS CONST SVC06/11/2024
DOB NOWSuspended ScaffoldPermit IssuedCANIDO BASONAS CONST. COR05/29/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC05/03/2024
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC05/03/2024
DOB NOWPlumbingSigned-offPIPE RITE CORP10/04/2021
DOB NOWBoiler EquipmentSigned-offPIPE RITE CORP03/26/2021
DOB NOWMechanical SystemsSigned-offBIG CITY BOILER LLC10/07/2020
DOB NOWBoiler EquipmentSigned-offPIPE RITE CORP09/28/2020
DOB NOWPlumbingSigned-offPIPE RITE CORP09/28/2020
DOB NOWSidewalk ShedSigned-offEXPERT GROUPENTERPRISE IN03/29/2018
BISOTISSUEDBIG CITY BOILER LLC09/23/2020
BISOTISSUEDA & S WATERPROOFING & RES06/27/2018
BISOTISSUEDA & S WATERPROOFING & RES07/12/2017
BISOTISSUEDA & S WATERPROOFING & RES07/12/2017
BISOTISSUEDA & S WATERPROOFING & RES05/25/2017
BISOTISSUEDA & S WATERPROOFING & RES05/24/2017
BISEQISSUEDEXPERT GROUPENTERPRISE IN03/29/2017
BISEQISSUEDEXPERT GROUPENTERPRISE IN02/14/2017
BISEQISSUEDEXPERT ENTERPRISES INC09/02/2015
BISOTISSUEDMEGA CONTRACTING INCORPORATED06/07/2006
BISPLISSUEDVARSITY PLBG AND HTG INC05/24/2006
BISPLISSUEDSIGNORE & SONS PLBG CORP02/04/2005
BISPLISSUEDSIGNORE & SONS PLBG CORP01/24/2005
BISFPISSUEDLUND FIRE PRODUCTS12/21/1999
2 projects · most recent 08/13/2024
Air Conditioning Systems Ventilation Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/13/2024——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Fujitsu ASUA36TLAV2 34,000 BTU · Fan Coil Indoor ×16
ASUA12TLAV2 12,000 BTU · Split System ×7
Airstage J-IIIL AOU120RLAVL 120,000 BTU · Vrf Outdoor ×5
Heating
Greenheck IDHE 13 kW · Ductwork ×2
Ventilation
Greenheck ERV-20-30L 2,100 CFM · Erv ×1
ERV-45-30L 2,000 CFM · Erv ×1
06/13/2024——Air Conditioning Systems, Ventilation Systems
Cooling
Friedrich FRIEDRICH KHL24A35A 2 tons · Ptac ×2
Ventilation
Greenheck Greenheck Model CSP-A900 750 CFM · Exhaust Fan ×1
1 project · most recent 06/13/2024
Water/Sanitary
FiledStatusContractorScope
06/13/2024Signed-offMJH ENERGY CONSULTING INCWater/Sanitary
8 projects · most recent 06/02/2026
General Wiring
FiledStatusContractorScope
06/02/2026CompleteGEMINI ELECTRIC CO., INC.General Wiring
03/31/2026CompleteGEMINI ELECTRIC CO., INC.—
08/27/2025CompleteGEMINI ELECTRIC CO., INC.—
05/29/2025Permit IssuedGEMINI ELECTRIC CO., INC.General Wiring
01/03/2025CompleteANCO ELECTL CONTCTNG INC—
05/09/2024CompleteILLUMINOUS ELECTRIC CORP.—
03/09/2022CompleteWILLDAN ELECTRICAL OF NY—
03/03/2022CompleteWILLDAN ELECTRICAL OF NY—
2 projects · most recent 09/13/2024
Steel
FiledStatusContractorScope
09/13/2024Permit IssuedNIKA CONTRACTING GROUP COSteel
08/13/2024——Steel
1 project · most recent 03/23/2018
Sidewalk Shed
FiledStatusContractorScope
03/23/2018Signed-offEXPERT GROUPENTERPRISE INSidewalk Shed
1 project · most recent 05/13/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
05/13/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/30/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 73
DateRequirementInspectorRole
07/25/2025Fenestration air leakageAsma Hashmienergy_progress
07/25/2025Fenestration and door U-factor and product ratingsAsma Hashmienergy_progress
07/25/2025Fenestration areasAsma Hashmienergy_progress
07/25/2025Air barrier - visual inspectionAsma Hashmienergy_progress
07/21/2025FinalAsma Hashmiprogress
09/04/2024Fire-Resistant Penetrations and JointsAsma Hashmispecial
08/30/2024FinalAsma Hashmiprogress
08/30/2024Post-installed AnchorsAsma Hashmispecial
08/30/2024Structural Steel - WeldingAsma Hashmispecial
08/30/2024Structural Steel - DetailsAsma Hashmispecial
08/26/2024Maintenance informationAsma Hashmienergy_progress
08/26/2024Ventilation and air distribution systemAsma Hashmienergy_progress
08/26/2024HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
08/26/2024HVAC-R and service water heating equipmentAsma Hashmienergy_progress
08/26/2024Mechanical SystemsAsma Hashmispecial
08/26/2024Exhaust and Vent Systems in Plenums and DuctsAsma Hashmispecial
08/26/2024Fire-Resistant Penetrations and JointsAsma Hashmispecial
08/26/2024Heating SystemsAsma Hashmispecial
08/26/2024Post-installed AnchorsAsma Hashmispecial
08/26/2024FinalAsma Hashmiprogress
08/26/2024Energy Code Compliance InspectionsAsma Hashmiprogress
08/26/2024HVAC-R and service water heating system controlsAsma Hashmienergy_progress
08/26/2024Duct leakage testing, insulation and designAsma Hashmienergy_progress
08/12/2024Post-installed Anchors—special
08/12/2024Energy Code Compliance Inspections—progress
Latest 25 of 73.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Ascension SchoolEducation—
Project M01256187 Alteration · Approved · 07/25/2025
Project M01230317 Alteration · Objections · 06/27/2025
P.S.220 Ascension SchoolEducationFloors 3, 4
Project M01047872 Alteration · Permit Entire · 06/13/2024
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 295 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch17
09/06/2026M00029491-I1Request digital key ↗
09/06/2026M00064394-I1Request digital key ↗
09/04/2026M00479077-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/04/2026M00386362-I1Request digital key ↗
09/04/2026M00386362-P3Request digital key ↗
09/04/2026M00386362-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026M00393589-P1Request digital key ↗
09/02/2026M00393589-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/30/2026M00891522-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/04/2026M00394169-I1Request digital key ↗
▸Applications & Permits34
▸BISPLAN / WORK APPROVAL APPLICATION20
08/20/2024104010972Open ↗
01/04/2024102331665Open ↗
01/03/2024140621879Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION12
09/23/2020140946877Open ↗
09/04/2018122533286Open ↗
06/28/2018122974790Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
06/25/2021140640723Open ↗
06/25/2021122974790Open ↗
▸Seals & Professional Certifications94
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/06/2026M00029491-I1Open ↗
09/06/2026M00064394-I1Open ↗
09/04/2026M00394169-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/23/2026M00479077-I1Open ↗
09/23/2026M00479077-I1Open ↗
09/23/2026M00479077-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/23/2026M00479077-I1Open ↗
09/02/2026M01047872-I1Open ↗
09/01/2026M00386362-P2Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
01/15/2020122974790Open ↗
01/15/2020122974790Open ↗
11/27/2019122974790Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
09/14/2020140946877Open ↗
09/06/2017140691071Open ↗
05/10/2017140640723Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
09/14/2020140946877Open ↗
09/06/2017140691071Open ↗
05/10/2017140640723Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
09/14/2020140946877Open ↗
09/06/2017140691071Open ↗
05/10/2017140640723Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
09/22/2017123106030Open ↗
09/12/2016122533286Open ↗
08/03/2016122533268Open ↗
▸BISProfessional and Owner Certification (POC3)1
09/12/2016122533286Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/17/2017140594578Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
09/22/2017123106030Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
09/22/2017123106030Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES2
03/27/2017140621879Open ↗
03/10/2017140594578Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/26/2017122974790Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
08/27/2026M01030722-I1Open ↗
08/27/2026M01047872-I1Open ↗
08/27/2026M01047872-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/04/2026M00394169-I1Open ↗
09/04/2026M00386362-P2Open ↗
09/04/2026M00386362-P3Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/14/2020140946877Open ↗
03/27/2017140621879Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
01/15/2020122974790Open ↗
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
02/04/2022140946877Open ↗
02/04/2022140946877Open ↗
09/17/2020140946877Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
01/15/2020122974790Open ↗
11/27/2019122974790Open ↗
09/22/2017123106030Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification4
09/02/2026M00393589-I1Open ↗
08/13/2026M00394169-I1Open ↗
08/13/2026M00479077-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/14/2020140946877Open ↗
05/10/2017140640723Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
06/18/2021140640723Open ↗
01/15/2020122974790Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/04/2022140946877Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00479077-I1Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY11
01/09/2024140621879Open ↗
02/04/2022140946877Open ↗
02/04/2022140946877Open ↗
Showing 3 of 11 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
12/18/2023140621879Open ↗
▸Approvals, Objections & Sign-offs35
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter23
09/06/2026M00029491-I1Open ↗
09/06/2026M00064394-I1Open ↗
09/04/2026M00394169-I1Open ↗
Showing 3 of 23 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
01/10/2024140621879Open ↗
01/05/2024102331665Open ↗
12/20/2023140395757Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
06/15/2017122974790Open ↗
02/23/2017140395757Open ↗
02/23/2017140395757Open ↗
▸BISFINAL2
12/18/2023140621879Open ↗
12/18/2023140395757Open ↗
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT15
06/25/2021140640723Open ↗
06/25/2021122974790Open ↗
05/14/2021140640723Open ↗
Showing 3 of 15 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST7
09/13/2017140691071Open ↗
05/23/2017140640723Open ↗
03/29/2017140621879Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
02/07/2022140946877Open ↗
▸Filing & Intake Forms16
▸BISEFILING JOB APPLICATION COVER SHEET6
09/14/2020140946877Open ↗
09/06/2017140691071Open ↗
05/10/2017140640723Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET4
09/22/2017123106030Open ↗
03/23/2017122974790Open ↗
09/12/2016122533286Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
12/20/2023140395757Open ↗
11/27/2019122974790Open ↗
03/17/2017140594578Open ↗
▸BISBOROUGH INTAKE FORM3
01/15/2020122974790Open ↗
01/14/2020140594578Open ↗
08/22/2019122974790Open ↗
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
09/22/2017123106030Open ↗
03/17/2017122974790Open ↗
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal2
08/13/2026M01090206-S1Open ↗
08/13/2026M01090206-I1Open ↗
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
08/27/2015140395757Open ↗
▸DOB NOWCalculations1
08/13/2026M01048456-I1Open ↗
▸DOB NOWAlternate Plan 11
08/30/2026M00891522-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
09/06/2026M00029491-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01048456-I1Open ↗