← Back
BuildNYC
Elevator apt, semi-fireproof without stores
2206 HOLLAND AVENUE
BRONX · BIN 2050020
💬 Discuss this project
1965Year Built
6Stories
D1Building Class
R6Zoning
59,772 sfGross Floor Area
55Units
LL97 CoveredRent Stabilized85 Active Violations 1 old, status unconfirmed ▸FISP: No Report Filed
Elevator apt, semi-fireproof without stores · Owner of record: Holland Industries · 15,100 sf lot · 3.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofParapet wall, lintel, and sill replacement3p · 1 filing · 13 docs
Floor 2Parapet wall, lintel, and sill replacement1p · 1 filing · 13 docs
Floor 1Parapet wall, lintel, and sill replacement8p · 3 filings · 17 docs
CellarFirst Metropolitan Realty Associate2p · 3 filings · 20 docs
Site & exteriorParapet wall, lintel, and sill replacement25p · 3 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
First Metropolitan Properties303/22/2026
Holland Industries203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/16/2022$9.1M—PELHAM PARKWAY TERRACE OWNERS CORP. → HOLLAND INDUSTRIES LLC$152/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Arquitectura Varela304/18/2023
Moore111/03/2021
Syed Engineering107/20/2021
Best Professionals NY210/18/2019
Livolt106/05/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Danico Services203/21/2026
Janco Building Consultants203/21/2026
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Triera ContractingScaffold603/21/2026
S.R.K. ContructionScaffold303/21/2026
Topline NYC ContractingScaffold303/21/2026
S.R.K. ContructionGeneral Contractor107/08/2026
Gul & G ContractingScaffold107/08/2026
East Coast MechnacialPlumbing107/08/2026
Yash & B ConstructionGeneral Contractor207/20/2018
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Butterfield & O'Connor4189204/18/2023
AA Building & Inspection1519112/05/2022
Moore Associates3408111/03/2021
Livolt6292106/05/2019
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
08/08/2026
Elevator Category 1 inspection report filed
08/03/2026
Closed: Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed on the city's record
04/19/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · closed
04/19/2026
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT EAST AND SOUTH WALL IN THE BATHROOM…
HPD violation · closed
223 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offS.R.K. Contruction12/23/2022
DOB NOWSidewalk ShedPermit IssuedS.R.K. Contruction09/29/2022
DOB NOWSidewalk ShedPermit IssuedTopline NYC Contracting07/26/2021
DOB NOWSidewalk ShedPermit IssuedTriera Contracting03/09/2021
DOB NOWSidewalk ShedPermit IssuedTriera Contracting10/18/2019
DOB NOWPlumbingPermit IssuedEast Coast Mechnacial06/07/2019
DOB NOWSidewalk ShedSigned-offGul & G Contracting04/30/2018
BISOTISSUEDYash & B Construction07/20/2018
BISOTISSUEDYash & B Construction06/29/2018
1 project · most recent 11/03/2021
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
11/03/2021——Gas, Plumbing-Sprinkler, Water/Sanitary
2 projects · most recent 11/11/2019
FiledStatusContractorScope
11/11/2019CompleteRichard Neu—
03/13/2018CompleteMeo Electric—
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
04/19/2023MasonryBRIAN T. O'CONNORspecial
04/19/2023FinalVicente Varelaprogress
04/19/2023Tenant Protection Plan ComplianceYounes Abouyaalaspecial
04/19/2023Structural Stability – Alterations of existing buildingsBRIAN T. O'CONNORspecial
04/07/2023FinalVicente Varelaprogress
04/07/2023MasonryBRIAN T. O'CONNORspecial
04/07/2023Structural Stability – Alterations of existing buildingsBRIAN T. O'CONNORspecial
04/07/2023Tenant Protection Plan Compliance—special
11/02/2021Energy Code Compliance InspectionsJAMES MOOREprogress
10/29/2021Fire-Resistant Penetrations and JointsJAMES MOOREspecial
10/29/2021HVAC-R and service water piping design and insulationJAMES MOOREenergy_progress
06/04/2019Energy Code Compliance InspectionsNathan Winklerprogress
06/04/2019HVAC insulation and sealing Nathan Winklerenergy_progress
06/04/2019Fire-Resistant Penetrations and JointsNathan Winklerspecial
06/04/2019HVAC and service water heating equipment Nathan Winklerenergy_progress
06/04/2019FinalNathan Winklerprogress
71 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account