← Back
BuildNYC
Two stories - detached, small or mid-size
2206 UNIVERSITY AVENUE
BRONX · BIN 2014586
💬 Discuss this project
1901Year Built
2.75Stories
A1Building Class
R7-1Zoning
3,702 sfGross Floor Area
1Units
1 Active Violation ▸
Two stories - detached, small or mid-size · 3,832 sf lot · 0.97 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 36p · 1 filing · 19 docs
Floor 24p · 1 filing · 19 docs
Floor 13p · 1 filing · 19 docs
Cellar7p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NAN609/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Nmi Architecture306/23/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Migliore Restoration403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Symmetrical ConstructionGeneral Contractor106/28/2026
Theory 3 GroupGeneral Contractor104/09/2026
R.E.P. ContractingPlumbing109/03/1999
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Nmi Architecture6825206/23/2026
Building Lifecycle
07/13/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
X01252881-I1-GC
06/23/2026
Filed — Alteration
This project is filed for all the interior Demo work after fire Damage for the Cellar, 1st and Second floors, all interior repair work will be filed separately by the Owner, no change of Use egress or occupancy
X01252881-P2
06/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
06/23/2026
Special inspection requirement — Energy Code Compliance Inspections
NASHAT IBRAHIM
06/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
NASHAT IBRAHIM
18 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSymmetrical Construction02/19/2026
DOB NOWGeneral ConstructionPermit IssuedTheory 3 Group09/09/2025
BISPLISSUEDR.E.P. Contracting09/03/1999
BIS—ISSUEDN/A09/01/1999
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
06/23/2026Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
06/23/2026Energy Code Compliance InspectionsNASHAT IBRAHIMprogress
06/23/2026Fire-Resistance Rated ConstructionNASHAT IBRAHIMprogress
06/23/2026Fenestration and door U-factor and product ratingsNASHAT IBRAHIMenergy_progress
06/23/2026Fenestration areasNASHAT IBRAHIMenergy_progress
06/23/2026Insulation placement and R valuesNASHAT IBRAHIMenergy_progress
06/23/2026Fenestration air leakageNASHAT IBRAHIMenergy_progress
25 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account