← Back
BuildNYC
Elevator apt, semi-fireproof without stores
2206 VALENTINE AVENUE
BRONX · BIN 2013384
💬 Discuss this project
1928Year Built
6Stories
D1Building Class
R7-1Zoning
62,094 sfGross Floor Area
66Units
LL97 CoveredRent Stabilized61 Active Violations 60 unresolved · 1 paperwork only 2 old, status unconfirmed ▸FISP: No Report Filed
Elevator apt, semi-fireproof without stores · Owner of record: Z & R Brothers · 12,714 sf lot · 4.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofDl Gold INC.Under Construction7p · 1 filing · 7 docs
BulkheadOutrigger for facade repairUnder Construction1p · 1 filing · 3 docs
Floor 1Installation of Heavy Duty Sidewalk Shed4p · 1 filing
Site & exteriorDl Gold INC.Under Construction9p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DL Gold710/13/2026
Z&R Brothers103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Archibuilt Enterprises of NY112/04/2025
Asr Engineering107/12/2025
Asif Jamil, RA107/30/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Green Studio203/21/2026
Expediting103/21/2026
JM Zoning103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rock Group NYScaffold603/21/2026
Peter & DannyGeneral Contractor104/09/2026
Peter & DannyScaffold106/28/2026
Alpha RestorationGeneral Contractor107/07/2020
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Baalbaki & Associates Engineering1858112/04/2025
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
09/11/2026
Permit renewed — Suspended Scaffold
Renewed without changes
X01388710-I1-SC
09/09/2026
Permit renewed — Suspended Scaffold
Renewed without changes
X01388710-I1-SC
07/15/2026
At the time of inspection at 5:15AM i observed a 6 story building with a sidewalk shed installed. Exp 1 and 2 were not properly illuminated…
ECB violation · open
07/15/2026
At the time of inspection of a 6 story building, i observed a sidewalk shed installed. Upon review the permit is expired. Comply with code renew…
ECB violation · open
224 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedHeights Construction Services09/11/2026
DOB NOWSuspended ScaffoldPermit IssuedHeights Construction Services09/09/2026
DOB NOWSuspended ScaffoldPermit IssuedHeights Construction Services05/06/2026
DOB NOWGeneral ConstructionPermit IssuedPeter & Danny03/27/2026
DOB NOWSidewalk ShedPermit IssuedPeter & Danny07/14/2025
DOB NOWSidewalk ShedPermit IssuedRock Group NY10/01/2020
DOB NOWSidewalk ShedPermit IssuedRock Group NY07/31/2020
BISOTISSUEDAlpha Restoration07/07/2020
1 project · most recent 06/05/2026
FiledStatusContractorScope
06/05/2026Permit IssuedRichard Neu—
2 projects · most recent 07/12/2025
Sidewalk Shed
FiledStatusContractorScope
07/12/2025Permit IssuedPeter & DannySidewalk Shed
07/30/2020Permit IssuedRock Group NYSidewalk Shed
1 project · most recent 04/21/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/21/2026Permit IssuedHeights Construction ServicesSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
09/03/2025Structural Stability – Alterations of existing buildingsMohammad Baalbakispecial
09/03/2025MasonryMohammad Baalbakispecial
09/03/2025Tenant Protection Plan ComplianceMohammad Baalbakispecial
09/03/2025FinalBarry Bergprogress
26 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account