| Owner | Filings | Most Recent |
|---|---|---|
| DYNASTY CONTRACTING | 2 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 12/09/2019 | $800K | — | — → — | $671/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| MEI ARCHITECT PLLC | 1 | 08/17/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| ALPHA HOME DESIGN LLC | 2 | 03/21/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/17/2024 | — | — | Heating and Air Conditioning Systems | Heat / Cool Goodman GSZH506010 60,000 BTU · Heat Pump Outdoor ×3 |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/16/2024 | HVAC-R and service water heating system controls | — | energy_progress |
| 08/16/2024 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 08/16/2024 | Fire-Resistant Penetrations and Joints | — | special |
| 08/16/2024 | Heating Systems | — | special |
| 08/16/2024 | Fenestration air leakage | — | energy_progress |
| 08/16/2024 | HVAC-R and service water heating equipment | — | energy_progress |
| 08/16/2024 | Structural Stability – Alterations of existing buildings | — | special |
| 08/16/2024 | Energy Code Compliance Inspections | — | progress |
| 08/16/2024 | Fire-Resistance Rated Construction | — | progress |
| 08/16/2024 | Interior lighting power | — | energy_progress |
| 08/16/2024 | Insulation placement and R values | — | energy_progress |
| 08/16/2024 | Maintenance information | — | energy_progress |
| 08/16/2024 | Air barrier — testing | — | energy_progress |
| 08/16/2024 | Fenestration areas | — | energy_progress |
| 08/16/2024 | Permanent certificate | — | energy_progress |
| 08/16/2024 | Protection of exposed foundation insulation | — | energy_progress |
| 08/16/2024 | Metering | — | energy_progress |
| 08/16/2024 | Ventilation and air distribution system | — | energy_progress |
| 08/16/2024 | Air barrier - visual inspection | — | energy_progress |
| 08/16/2024 | Duct leakage testing, insulation and design | — | energy_progress |
| 08/16/2024 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 08/16/2024 | Electric vehicle service equipment requirements | — | energy_progress |
| 08/16/2024 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 08/05/2024 | Mechanical Systems | — | special |
| 08/05/2024 | Final | — | progress |