← Back
One story - permanent living quarter
221-11 69 AVENUE
QUEENS · Oakland Gardens-Hollis Hills · BIN 4163517
💬 Discuss this project
1955Year Built
1Stories
A2Building Class
R3-2Zoning
1,192 sfGross Floor Area
1Units
One story - permanent living quarter · 4,465 sf lot · 0.27 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 8 docs
Cellar2p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DYNASTY CONTRACTING203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/09/2019$800K—— → —$671/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEI ARCHITECT PLLC108/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALPHA HOME DESIGN LLC203/21/2026
Building Lifecycle
All (40)Filed (1)Objection (14)Special Inspection (25)
10/16/2024
Objection resolved — Addressed
10/16/2024
Objection resolved — Addressed
10/16/2024
Objection resolved — Addressed
10/16/2024
Objection resolved — Addressed
10/16/2024
Objection resolved — Addressed
10/16/2024
Objection resolved — Addressed
08/28/2024
Objection raised — Scope
08/28/2024
Objection raised — Other
08/28/2024
Objection raised — Zoning
08/28/2024
Objection raised — Other
08/28/2024
Objection raised — Zoning
08/28/2024
Objection raised — Scope
08/28/2024
Objection raised — Zoning
08/28/2024
Objection raised — Structural
08/17/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSE HORIZONTAL AND VERTICAL ENLARGEMENT FOR A TWO-FAMILY DETACHED RESIDENCE. OBTAIN A NEW C OF O.
Q01091386-I1
08/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
08/16/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/16/2024
Special inspection requirement — Heating Systems
08/16/2024
Special inspection requirement — Fenestration air leakage
08/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
08/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/16/2024
Special inspection requirement — Energy Code Compliance Inspections
08/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
08/16/2024
Special inspection requirement — Interior lighting power
08/16/2024
Special inspection requirement — Insulation placement and R values
08/16/2024
Special inspection requirement — Maintenance information
08/16/2024
Special inspection requirement — Air barrier — testing
08/16/2024
Special inspection requirement — Fenestration areas
08/16/2024
Special inspection requirement — Permanent certificate
08/16/2024
Special inspection requirement — Protection of exposed foundation insulation
08/16/2024
Special inspection requirement — Metering
08/16/2024
Special inspection requirement — Ventilation and air distribution system
08/16/2024
Special inspection requirement — Air barrier - visual inspection
08/16/2024
Special inspection requirement — Duct leakage testing, insulation and design
08/16/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
08/16/2024
Special inspection requirement — Electric vehicle service equipment requirements
08/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
08/05/2024
Special inspection requirement — Mechanical Systems
08/05/2024
Special inspection requirement — Final
Nothing on file for this building.
1 project · most recent 08/17/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/17/2024——Heating and Air Conditioning Systems
Heat / Cool
Goodman GSZH506010 60,000 BTU · Heat Pump Outdoor ×3
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
08/16/2024HVAC-R and service water heating system controls—energy_progress
08/16/2024Subsurface Investigations (Borings/Test Pits)—special
08/16/2024Fire-Resistant Penetrations and Joints—special
08/16/2024Heating Systems—special
08/16/2024Fenestration air leakage—energy_progress
08/16/2024HVAC-R and service water heating equipment—energy_progress
08/16/2024Structural Stability – Alterations of existing buildings—special
08/16/2024Energy Code Compliance Inspections—progress
08/16/2024Fire-Resistance Rated Construction—progress
08/16/2024Interior lighting power—energy_progress
08/16/2024Insulation placement and R values—energy_progress
08/16/2024Maintenance information—energy_progress
08/16/2024Air barrier — testing —energy_progress
08/16/2024Fenestration areas—energy_progress
08/16/2024Permanent certificate—energy_progress
08/16/2024Protection of exposed foundation insulation—energy_progress
08/16/2024Metering—energy_progress
08/16/2024Ventilation and air distribution system—energy_progress
08/16/2024Air barrier - visual inspection—energy_progress
08/16/2024Duct leakage testing, insulation and design—energy_progress
08/16/2024Fenestration and door U-factor and product ratings—energy_progress
08/16/2024Electric vehicle service equipment requirements—energy_progress
08/16/2024HVAC-R and service water piping design and insulation—energy_progress
08/05/2024Mechanical Systems—special
08/05/2024Final—progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01091386-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01091386-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01091386-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026Q01091386-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026Q01091386-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01091386-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/21/2026Q01091386-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01091386-I1Open ↗