← Back
Other private school
221-21 CORBETT ROAD
QUEENS · Bayside · BIN 4438249
💬 Discuss this project
1981Year Built
1Stories
W8Building Class
R1-2Zoning
10,084 sfGross Floor Area
1Units
28 Open Violations 18 unresolved · 10 paperwork only ▸FDNY Report ↗
Other private school · 26,000 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionCivilGeneralOther
Cellar25p · 1 filing · 20 docs
Filed — no permit issued17p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CTA ARCHITECTS P.C.402/06/2024
EME CONSULTING ENGINEERING GROUP206/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACS SYSTEM ASSOCIATES INC.General Contractor203/21/2026
BARROW, JASONElectrical103/21/2026
CARL WEISSElectrical103/21/2026
MONACO, NElectrical103/21/2026
NUNEZ, CARLOSElectrical103/21/2026
EAGLE 1 MECHANICAL, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS400402/06/2024
JPC LOGISTICS DBA JPCL EN351206/24/2022
Building Lifecycle
All (106)Filed (6)Permit Issued (2)Signed Off (3)Violation (60)Inspection (5)Special Inspection (30)
05/08/2026
Violation issued (ECB, open)
Construction
05/08/2026
Violation issued (ECB, open)
Construction
02/09/2026
Violation issued (FDNY_ORDER, closed)
02/09/2026
Violation issued (FDNY_ORDER, closed)
02/09/2026
Violation issued (FDNY_ORDER, closed)
11/17/2025
Violation issued (FDNY_NOV, closed)
10/17/2025
Violation issued (FDNY_ORDER, closed)
09/12/2025
Violation issued (ECB, open)
Boilers
09/12/2025
Violation issued (ECB, open)
Boilers
08/27/2025
Violation issued (ECB, open)
Construction
07/22/2025
Violation issued (FDNY_NOV, closed)
04/11/2025
Violation issued (FDNY_NOV, closed)
01/07/2025
Violation issued (FDNY_NOV, closed)
01/07/2025
Violation issued (FDNY_NOV, closed)
09/10/2024
Violation issued (FDNY_NOV, closed)
07/11/2024
Violation issued (ECB, closed)
Construction
02/21/2024
Signed off — Alteration
DEMOLITION AND REPLACEMENT OF FIN TUBE RADIATOR / CONVECTORS ALONG WITH ASSOCIATED PIPING, VALVES, SUPPORT, AND ANCILLIARY ACCESSORIES WITHIN LOCKERS ROOMS. DEMOLITION AND REPLACEMENT OF AIR TERMINAL DEVICES SERVING THE LOCKER ROOM VENTILATION SYSTEM
Q00661790-S1
02/21/2024
Signed off — Alteration
DEMOLITION AND REPLACEMENT OF FIN TUBE RADIATOR / CONVECTORS ALONG WITH ASSOCIATED PIPING, VALVES, SUPPORT, AND ANCILLIARY ACCESSORIES WITHIN LOCKERS ROOMS. DEMOLITION AND REPLACEMENT OF AIR TERMINAL DEVICES SERVING THE LOCKER ROOM VENTILATION SYSTEM
Q00661790-S2
02/21/2024
Signed off — Alteration
DEMOLITION AND REPLACEMENT OF FIN TUBE RADIATOR / CONVECTORS ALONG WITH ASSOCIATED PIPING, VALVES, SUPPORT, AND ANCILLIARY ACCESSORIES WITHIN LOCKERS ROOMS. DEMOLITION AND REPLACEMENT OF AIR TERMINAL DEVICES SERVING THE LOCKER ROOM VENTILATION SYSTEM
Q00661790-I1
02/08/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
02/08/2024
Special inspection requirement — Maintenance information
NELSON LOPEZ
02/08/2024
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
02/08/2024
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
02/08/2024
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
02/08/2024
Special inspection requirement — Final
NELSON LOPEZ
02/06/2024
Filed — Alteration
DEMOLITION AND REPLACEMENT OF FIN TUBE RADIATOR / CONVECTORS ALONG WITH ASSOCIATED PIPING, VALVES, SUPPORT, AND ANCILLIARY ACCESSORIES WITHIN LOCKERS ROOMS. DEMOLITION AND REPLACEMENT OF AIR TERMINAL DEVICES SERVING THE LOCKER ROOM VENTILATION SYSTEM
Q00661790-P1
11/15/2023
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
11/15/2023
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
11/15/2023
Special inspection requirement — Final
NELSON LOPEZ
11/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
11/15/2023
Special inspection requirement — Maintenance information
NELSON LOPEZ
11/15/2023
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
07/19/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/19/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/24/2023
Violation issued (FDNY_NOV, closed)
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Water Test
Certified
View inspection ↗
11/09/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/31/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/19/2022
Permit issued — Plumbing
Q00661790-S1-PL
10/19/2022
Permit issued — Mechanical Systems
Q00661790-S2-MS
08/12/2022
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
08/09/2022
Special inspection requirement — Interior lighting power
Asma Hashmi
08/09/2022
Special inspection requirement — Lighting controls
Asma Hashmi
06/24/2022
Filed — Alteration
Q00742510-S1
06/15/2022
Violation issued (ECB, open)
Construction
06/03/2022
Filed — Alteration
Q00742510-I1
05/31/2022
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
05/31/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
05/31/2022
Special inspection requirement — Post-installed Anchors
Asma Hashmi
05/31/2022
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
05/31/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
05/31/2022
Special inspection requirement — Maintenance information
Asma Hashmi
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offEAGLE 1 MECHANICAL, INC10/19/2022
DOB NOWMechanical SystemsSigned-offACS SYSTEM ASSOCIATES INC.10/19/2022
2 projects · most recent 07/21/2023
General Wiring
FiledStatusContractorScope
07/21/2023CompleteSTANCO SYSTEM ELEC'L CONTGeneral Wiring
12/18/2019CompleteLASER ELEC'L CONTR'G INC—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/19/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/14/2022Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
11/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/31/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
02/08/2024HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
02/08/2024Maintenance informationNELSON LOPEZenergy_progress
02/08/2024HVAC-R and service water heating system controlsNELSON LOPEZenergy_progress
02/08/2024Mechanical SystemsNELSON LOPEZspecial
02/08/2024Energy Code Compliance InspectionsNELSON LOPEZprogress
02/08/2024FinalNELSON LOPEZprogress
11/15/2023Mechanical SystemsNELSON LOPEZspecial
11/15/2023Energy Code Compliance InspectionsNELSON LOPEZprogress
11/15/2023FinalNELSON LOPEZprogress
11/15/2023HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
11/15/2023Maintenance informationNELSON LOPEZenergy_progress
11/15/2023HVAC-R and service water heating system controlsNELSON LOPEZenergy_progress
08/12/2022Energy Code Compliance InspectionsAsma Hashmiprogress
08/09/2022Interior lighting powerAsma Hashmienergy_progress
08/09/2022Lighting controlsAsma Hashmienergy_progress
05/31/2022HVAC-R and service water heating system controlsAsma Hashmienergy_progress
05/31/2022Fire-Resistant Penetrations and JointsAsma Hashmispecial
05/31/2022Post-installed AnchorsAsma Hashmispecial
05/31/2022HVAC-R and service water heating equipmentAsma Hashmienergy_progress
05/31/2022HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
05/31/2022Maintenance informationAsma Hashmienergy_progress
05/20/2022Mechanical SystemsAsma Hashmispecial
05/20/2022FinalAsma Hashmiprogress
03/24/2022HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
03/24/2022Energy Code Compliance InspectionsNELSON LOPEZprogress
Latest 25 of 32.
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026Q00661790-I1Request digital key ↗
08/26/2026Q00661790-P1Request digital key ↗
08/26/2026Q00661790-S2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature8
08/29/2026Q00661790-I1Open ↗
08/29/2026Q00661790-I1Open ↗
08/26/2026Q00661790-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026Q00661790-I1Open ↗
08/26/2026Q00661790-P1Open ↗
08/26/2026Q00661790-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026Q00661790-I1Open ↗
08/26/2026Q00661790-P1Open ↗
08/26/2026Q00661790-S2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/26/2026Q00661790-S2Open ↗
08/26/2026Q00661790-S1Open ↗
08/26/2026Q00661790-I1Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026Q00661790-I1Open ↗
08/13/2026Q00661790-S2Open ↗
08/13/2026Q00661790-S1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026Q00742510-I1Open ↗
08/13/2026Q00742510-S1Open ↗
▸Other Documents2
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal2
08/13/2026Q00742510-I1Open ↗
08/13/2026Q00742510-S1Open ↗