← Back
Walk-up cooperative
221-22 MANOR ROAD
QUEENS · Bellerose · BIN 4541154
💬 Discuss this project
1951Year Built
2Stories
C6Building Class
R3-2Zoning
489,600 sfGross Floor Area
350Units
LL97 CoveredRent Stabilized22 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: UNITED VETERAN MUTUAL HOUSING COMPANY INCORPORATED · 694,000 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
Architecture
Floor 21p · 1 filing · 7 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EDWARD C. HICKS RA103/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KATARIA BUILDERS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
PERSI CONTRACTING CORPGeneral Contractor107/08/2026
Building Lifecycle
All (6)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (3)
12/06/2024
Signed off — Alteration
FILING HEREWITH PLANS AND APPLICATION TO REMOVE NON-BEARING PARTITION BETWEEN KITCHEN AND DINING ROOM, WITH KITCHEN RENOVATIONS ON SECOND FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00704118-I1
04/22/2022
Permit issued — General Construction
Q00704118-I1-GC
03/24/2022
Filed — Alteration
FILING HEREWITH PLANS AND APPLICATION TO REMOVE NON-BEARING PARTITION BETWEEN KITCHEN AND DINING ROOM, WITH KITCHEN RENOVATIONS ON SECOND FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00704118-I1
03/22/2022
Special inspection requirement — Final
ASHOKE CHAKRABORTY
03/22/2022
Special inspection requirement — Energy Code Compliance Inspections
EDWARD HICKS
03/22/2022
Special inspection requirement — Interior lighting power
EDWARD HICKS
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPERSI CONTRACTING CORP04/22/2022
3 projects · most recent 04/20/2022
General Wiring
FiledStatusContractorScope
04/20/2022CompleteJS ELEC & CONSTR INC—
07/30/2019CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
06/24/2019CancelledJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
03/22/2022FinalASHOKE CHAKRABORTYprogress
03/22/2022Energy Code Compliance InspectionsEDWARD HICKSprogress
03/22/2022Interior lighting powerEDWARD HICKSenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/26/2026Q00704118-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature3
09/25/2026Q00704118-I1Open ↗
09/25/2026Q00704118-I1Open ↗
09/25/2026Q00704118-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q00704118-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00704118-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00704118-I1Open ↗