← Back
Walk-up cooperative
221-22 MANOR ROAD
QUEENS · Bellerose · BIN 4541174
💬 Discuss this project
1951Year Built
2Stories
C6Building Class
R3-2Zoning
489,600 sfGross Floor Area
350Units
LL97 CoveredRent Stabilized22 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: UNITED VETERAN MUTUAL HOUSING COMPANY INCORPORATED · 694,000 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 27p · 1 filing · 15 docs
Floor 17p · 1 filing · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHOKE CHAKRABORTY RA309/06/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GURU QUALITY HOME IMPROVEGeneral Contractor107/08/2026
AJIT ONE MECH&GEN'L CONTRPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KOJO SIMPSON ARCHITECT1664309/06/2024
Building Lifecycle
All (18)Filed (3)Permit Issued (2)Signed Off (2)Inspection (2)Special Inspection (9)
06/02/2025
Signed off — Alteration
FILING HEREWITH PLANS AND APPLICATION FOR NEW HALF BATHROOM & WASHING MACHINE ON 001 FLOOR, REPLACE KITCHEN SINK & STOVE ON 001 FLOOR. REPLACE LAV AND TOILET ON 002 FLOOR. REMOVE EXIST. TUB & REPLACE WITH SHOWER. EXIST. SINGLE FAMILY DWELLING.
Q01091325-I1
06/02/2025
Signed off — Alteration
FILING HEREWITH PLANS AND APPLICATION FOR NEW HALF BATHROOM & WASHING MACHINE ON 001 FLOOR, REPLACE KITCHEN SINK & STOVE ON 001 FLOOR. REPLACE LAV AND TOILET ON 002 FLOOR. REMOVE EXIST. TUB & REPLACE WITH SHOWER. EXIST. SINGLE FAMILY DWELLING.
Q01091325-S1
02/06/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/21/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/06/2024
Filed — Alteration
FILING HEREWITH PLANS AND APPLICATION FOR NEW HALF BATHROOM & WASHING MACHINE ON 001 FLOOR, REPLACE KITCHEN SINK & STOVE ON 001 FLOOR. REPLACE LAV AND TOILET ON 002 FLOOR. REMOVE EXIST. TUB & REPLACE WITH SHOWER. EXIST. SINGLE FAMILY DWELLING.
Q01091325-P1
09/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
KOJO SIMPSON
09/05/2024
Special inspection requirement — Energy Code Compliance Inspections
ASHOKE CHAKRABORTY
09/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ASHOKE CHAKRABORTY
08/27/2024
Permit issued — Plumbing
Q01091325-S1-PL
08/19/2024
Permit issued — General Construction
Q01091325-I1-GC
08/12/2024
Filed — Alteration
FILING HEREWITH PLANS AND APPLICATION FOR NEW HALF BATHROOM & WASHING MACHINE ON 001 FLOOR, REPLACE KITCHEN SINK & STOVE ON 001 FLOOR. REPLACE LAV AND TOILET ON 002 FLOOR. REMOVE EXIST. TUB & REPLACE WITH SHOWER. EXIST. SINGLE FAMILY DWELLING.
Q01091325-S1
08/09/2024
Filed — Alteration
FILING HEREWITH PLANS AND APPLICATION FOR NEW HALF BATHROOM & WASHING MACHINE ON 001 FLOOR, REPLACE KITCHEN SINK & STOVE ON 001 FLOOR. REPLACE LAV AND TOILET ON 002 FLOOR. REMOVE EXIST. TUB & REPLACE WITH SHOWER. EXIST. SINGLE FAMILY DWELLING.
Q01091325-I1
08/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
KOJO SIMPSON
08/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
KOJO SIMPSON
08/05/2024
Special inspection requirement — Final
ASHOKE CHAKRABORTY
08/05/2024
Special inspection requirement — Energy Code Compliance Inspections
ASHOKE CHAKRABORTY
08/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
ASHOKE CHAKRABORTY
08/05/2024
Special inspection requirement — Interior lighting power
ASHOKE CHAKRABORTY
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHAR JI PLUMBING& HEAT COR08/27/2024
DOB NOWGeneral ConstructionSigned-offGURU QUALITY HOME IMPROVE08/19/2024
1 project · most recent 08/19/2024
General Wiring
FiledStatusContractorScope
08/19/2024CompleteJKC ELECTRICAL INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/21/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
09/05/2024Fire-Resistant Penetrations and JointsKOJO SIMPSONspecial
09/05/2024Energy Code Compliance InspectionsASHOKE CHAKRABORTYprogress
09/05/2024HVAC-R and service water piping design and insulationASHOKE CHAKRABORTYenergy_progress
08/05/2024Fire-Resistant Penetrations and JointsKOJO SIMPSONspecial
08/05/2024Structural Stability – Alterations of existing buildingsKOJO SIMPSONspecial
08/05/2024FinalASHOKE CHAKRABORTYprogress
08/05/2024Energy Code Compliance InspectionsASHOKE CHAKRABORTYprogress
08/05/2024Fire-Resistance Rated ConstructionASHOKE CHAKRABORTYprogress
08/05/2024Interior lighting powerASHOKE CHAKRABORTYenergy_progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026Q01091325-I1Request digital key ↗
08/21/2026Q01091325-P1Request digital key ↗
08/21/2026Q01091325-S1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
08/27/2026Q01091325-I1Open ↗
08/27/2026Q01091325-I1Open ↗
08/25/2026Q01091325-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026Q01091325-I1Open ↗
08/21/2026Q01091325-P1Open ↗
08/21/2026Q01091325-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026Q01091325-I1Open ↗
08/25/2026Q01091325-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026Q01091325-I1Open ↗
08/21/2026Q01091325-P1Open ↗
08/21/2026Q01091325-S1Open ↗