← Back
BuildNYC
Two stories - detached, small or mid-size
221-24 FAIRBURY AVENUE
QUEENS · Queens Village · BIN 4230039
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R3XZoning
1,764 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProject Summary2p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tom Petersen Architect107/08/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
The Green PlugGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Thomas Petersen Architect7854107/08/2025
Building Lifecycle
08/21/2025
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOFTOP. NO CHANGES TO EGRESS OR USE OF OCCUPANCY.
Q01252533-I1
07/10/2025
Permit issued — Solar
Q01252533-I1-SL
07/08/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOFTOP. NO CHANGES TO EGRESS OR USE OF OCCUPANCY.
Q01252533-I1
07/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
07/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offThe Green Plug07/10/2025
2 projects · most recent 07/07/2025
General Wiring
FiledStatusContractorScope
07/07/2025CompleteL.D.M. Electl Contractors—
07/07/2025CompleteL.D.M. Electl ContractorsGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/08/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
07/08/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
07/08/2025Energy Code Compliance InspectionsTOM PETERSENprogress
07/08/2025FinalTOM PETERSENprogress
07/08/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
9 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account