← Back
Elevator cooperative
221 EAST 78 STREET
💬 Discuss this project
1948Year Built
6Stories
D4Building Class
R8BZoning
46,230 sfGross Floor Area
54Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SWARMP
Elevator cooperative · Owner of record: 221 EAST 78TH TENANTS CORP · 12,770 sf lot · 3.62 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Roof1p · 1 filing · 3 docs
Floor 51p · 1 filing · 15 docs
Floor 4
Floor 3
Floor 2
Floor 11p · 1 filing · 8 docs
Cellar2p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
221 EAST 78TH TENANTS1803/22/2026
221 E 78TH LLC203/22/2026
221 EAST 78TH STREET TENANTS COR103/21/2026
221 E 78 ST TENANTS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING403/21/2026
Rigid Structural Design, LLC103/21/2026
WLA ENGINEERING P C203/21/2026
BG & ASSOCIATES203/21/2026
RIGGING CONSULTANTS203/21/2026
CARSON ARCHITECTURE103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MALCON CONSTRUCTION CORPGeneral Contractor603/21/2026
NILU HOME IMPROVEMENT NYGeneral Contractor603/21/2026
OPTIMUM BUILDING RESTORATIONGeneral Contractor303/21/2026
INTERSYSTEMS INSTAL S&SGeneral Contractor303/21/2026
PLUMBING NYC INCPlumbing207/08/2026
NORMAN TCHERNOFFElectrical103/21/2026
PHILIP ZUARDIElectrical103/21/2026
VAN VASSELLElectrical103/21/2026
ANTHONY LUCIANOElectrical103/21/2026
HAPPY CARPENTERS INCGeneral Contractor104/09/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
ZORAN VUJICICElectrical103/21/2026
BASIL, OMARElectrical103/21/2026
CRESCO ELECTRICAL CORPElectrical103/22/2026
LEVINE, GARYElectrical103/21/2026
MOSCATI, MICHAELElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MICHAEL ZENREICH ARCHITEC1724110/21/2025
JAJ ENGINEERING PLLC930105/19/2025
AMKA & ASSOCIATES LLC8239304/25/2024
FRAME DESIGN AND CONSTRUC7971109/19/2023
WLA ENGINEERING, P.C.1531109/19/2023
COLE TECHNOLOGIES/CONTROL1290109/07/2022
Building Lifecycle
All (146)Filed (11)Permit Issued (10)Signed Off (8)Facade (FISP) (9)Violation (42)Inspection (2)Objection (41)Special Inspection (23)
08/06/2026
Signed off — Alteration
Herewith filing for the removal, replacement and installation of plumbing fixtures, as per plans submitted. There is no change to use, egress or occupancy.
M01225174-I1
07/30/2026
Objection raised — Fire_Protection
07/30/2026
Objection raised — Scope
06/25/2026
Objection resolved — Addressed
06/04/2026
Objection resolved — Addressed
06/04/2026
Objection resolved — Resolved
06/04/2026
Objection resolved — Addressed
06/04/2026
Objection resolved — Addressed
05/15/2026
Objection resolved — Resolved
05/15/2026
Objection resolved — Resolved
05/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/14/2026
Signed off — Alteration
Herewith filing minor interior alterations in apartment # 1AB. Proposed work in the kitchen and bathroom, as per plans submitted. Plumbing work filed under separate application. There is no change to use, egress or occupancy.
M01225144-I1
04/21/2026
Objection resolved — Addressed
04/09/2026
Objection raised — Cost
04/09/2026
Objection raised — Other
03/12/2026
Objection resolved — Addressed
03/12/2026
Objection resolved — Addressed
02/06/2026
Objection raised — Other
02/06/2026
Objection raised — Inspections
02/06/2026
Objection raised — Other
02/06/2026
Objection raised — Structural
01/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/12/2026
Objection resolved — Addressed
01/12/2026
Objection resolved — Addressed
01/12/2026
Objection resolved — Addressed
11/25/2025
Objection raised — Fire_Protection
11/25/2025
Objection raised — Other
11/23/2025
Objection raised — Fire_Protection
11/23/2025
Objection raised — Other
11/23/2025
Objection raised — Scope
11/23/2025
Objection raised — Scope
11/23/2025
Objection raised — Scope
11/23/2025
Objection raised — Other
11/04/2025
Special inspection requirement — Lighting controls
Michael Zenreich
10/22/2025
Filed — Alteration CO
M01298491-S1
10/21/2025
Filed — Alteration CO
M01298491-I1
10/08/2025
Special inspection requirement — Interior lighting power
Michael Zenreich
10/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Zenreich
09/02/2025
Permit issued — Plumbing
M01225174-I1-PL
08/26/2025
Permit issued — General Construction
M01225144-I1-GC
06/05/2025
Objection resolved — Addressed
06/04/2025
Violation issued (HPD, closed)
A
06/03/2025
Objection raised — Scope
05/19/2025
Filed — Alteration
Herewith filing for the removal, replacement and installation of plumbing fixtures, as per plans submitted. There is no change to use, egress or occupancy.
M01225174-I1
05/19/2025
Filed — Alteration
Herewith filing minor interior alterations in apartment # 1AB. Proposed work in the kitchen and bathroom, as per plans submitted. Plumbing work filed under separate application. There is no change to use, egress or occupancy.
M01225144-I1
05/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Joseph Jabour
05/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Jabour
05/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
05/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Joseph Jabour
05/13/2025
Special inspection requirement — Final
Joseph Jabour
05/13/2025
Special inspection requirement — Lighting in dwelling units
Joseph Jabour
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/22/2024
Violation issued (HPD, closed)
I
10/04/2024
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01044563-I1
10/02/2024
Signed off — Alteration
Exterior repairs. No change in use, occupancy, or egress.
M00901869-I1
08/14/2024
Signed off — Alteration
Opening an interior wall with a structural header.
M01031403-S2
08/13/2024
Signed off — Alteration
Opening an interior wall with a structural header.
M01031403-I1
08/06/2024
Signed off — Alteration
Opening an interior wall with a structural header.
M01031403-S1
08/06/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
Latest 60 of 146 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPLUMBING WORKS NYC INC09/02/2025
DOB NOWGeneral ConstructionSigned-offHAPPY CARPENTERS INC08/26/2025
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC06/05/2024
DOB NOWStructuralSigned-offNILU HOME IMPROVEMENT NY05/31/2024
DOB NOWGeneral ConstructionSigned-offNILU HOME IMPROVEMENT NY05/31/2024
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S05/14/2024
DOB NOWSuspended ScaffoldPermit IssuedSPD CONSTRUCTION CORP04/19/2024
DOB NOWGeneral ConstructionSigned-offOPTIMUM BUILDING RESTORAT04/15/2024
DOB NOWGeneral ConstructionSigned-offMALCON CONSTRUCTION CORP02/22/2023
DOB NOWStructuralSigned-offMALCON CONSTRUCTION CORP02/22/2023
BISOTISSUEDBR CONSTRUCTION & STONE I05/09/2018
BISOTISSUEDWOJTAS' CONTRACTING COMPANY04/30/2018
BISPLISSUEDFLINT MECHANICAL CORP12/14/2017
BISOTISSUEDBR CONSTRUCTION & STONE I07/18/2017
BISOTISSUEDLAWRENCE EXTERIOR RESTORATION05/17/2016
BISOTISSUEDLAWRENCE EXTERIOR RESTORATION04/25/2016
BISEQISSUEDREPUBLIC SCAFFOLD&HOIST C04/13/2016
BISPLISSUEDQBK PLUMBING & HTNG INC12/15/2015
BISOTISSUEDHAPPY CARPENTERS INC12/08/2015
BISPLISSUEDG.BASSOLINO PLUMBING LTD03/25/2015
BISOTISSUEDHERITAGE CHIMNEY SERVICE03/25/2015
BISOTISSUEDLAUNDRO COMBUSTION CORP04/18/2014
BISPLISSUEDMETROCITY GROUP,INC10/18/2011
BISOTISSUEDUNLIMITED RENOVATION LLC08/18/2011
BISOTISSUEDTRICE RESTORATION CORP06/20/2005
BISPLISSUEDSAFETY PLMBG & HTG LLC06/01/2005
BISOTISSUEDPROBIN, INC.05/25/2005
BISOTISSUEDINSIDER SAM INC11/19/2003
BISPLISSUEDABBA PLUMBING CORP.06/02/2000
BISOTISSUEDJOHNSTONE CONSTRUCTION11/17/1999
BISPLISSUEDTOMMY GARZIANO PLBG & HTG10/08/1999
BISOTISSUEDLIEBHABER COMPANY INC08/10/1999
BISPLISSUEDZARA PLUMBING CORP03/05/1999
BISOTISSUEDSTRUCTURAL IMPROVEMENTS05/29/1998
BISPLISSUEDALKLEM PLUMBING INC05/27/1998
BISOTISSUEDEVEREST RESTORATION02/10/1997
BISBLISSUEDFIRST PRIORTITY HEATING12/18/1992
6 projects · most recent 09/25/2025
General Wiring
FiledStatusContractorScope
09/25/2025CompletePLAZA ELEC'L CONTR'S. INCGeneral Wiring
07/10/2025CompleteAXCEL ELECTRIC CO., INC.General Wiring
05/23/2025CompleteJAM ELECTRICAL CORP—
12/31/2024CompleteCRESCO ELECTRICAL CORPGeneral Wiring
05/22/2024CompleteAURORA ELECL CONTG INC—
08/17/2023CompleteAXCEL ELECTRIC CO., INC.—
1 project · most recent 03/29/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
03/29/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/06/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
05/15/2026Fire-Resistant Penetrations and Joints—special
11/04/2025Lighting controlsMichael Zenreichenergy_progress
10/08/2025Interior lighting powerMichael Zenreichenergy_progress
10/08/2025Tenant Protection Plan Compliance—special
10/06/2025Fire-Resistant Penetrations and JointsMichael Zenreichspecial
05/19/2025Energy Code Compliance InspectionsJoseph Jabourprogress
05/19/2025HVAC-R and service water piping design and insulationJoseph Jabourenergy_progress
05/13/2025Fire-Resistant Penetrations and JointsJoseph Jabourspecial
05/13/2025Energy Code Compliance InspectionsJoseph Jabourprogress
05/13/2025FinalJoseph Jabourprogress
05/13/2025Lighting in dwelling unitsJoseph Jabourenergy_progress
05/07/2024Structural Stability – Alterations of existing buildingsAHMAD KHANZADAspecial
05/06/2024Structural Stability – Alterations of existing buildingsAHMAD KHANZADAspecial
04/25/2024Fire-Resistant Penetrations and JointsAHMAD KHANZADAspecial
04/23/2024Structural Steel - High Strength BoltingAHMAD KHANZADAspecial
04/10/2024FinalCHRISTOPHER CARSONprogress
04/05/2024FinalAHMAD KHANZADAprogress
08/29/2022Structural Stability – Alterations of existing buildingsGEORGE ANDERSENspecial
08/02/2022Structural Steel - High Strength BoltingGEORGE ANDERSENspecial
08/02/2022FinalRenee Beckprogress
08/02/2022Structural Steel - DetailsGEORGE ANDERSENspecial
08/02/2022Structural Steel - WeldingGEORGE ANDERSENspecial
08/02/2022MasonryGEORGE ANDERSENspecial
▾Documents — 202 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/01/2026M00785812-I1Request digital key ↗
08/29/2026M00901869-I1Request digital key ↗
08/27/2026M01022455-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits31
▸BISPLAN / WORK APPROVAL APPLICATION17
05/31/2024101387330Open ↗
03/06/2024101387330Open ↗
11/18/2022122213826Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION14
05/15/2018123087729Open ↗
05/01/2018123432767Open ↗
12/19/2017123087729Open ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications56
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
11/09/2018123087729Open ↗
11/09/2018123087729Open ↗
11/09/2018123087729Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/29/2026M00901869-I1Open ↗
08/21/2026M01298491-S1Open ↗
08/21/2026M01298491-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/26/2026M00785812-I1Open ↗
09/26/2026M00785812-I1Open ↗
09/26/2026M00785812-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/26/2026M00785812-I1Open ↗
09/01/2026M01031403-S1Open ↗
09/01/2026M01031403-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/01/2018123432767Open ↗
04/19/2016122754215Open ↗
04/17/2014140187394Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
05/01/2018123432767Open ↗
04/19/2016122754215Open ↗
07/08/2011120749912Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/08/2011120749912Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/17/2014140187394Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/05/2015140381398Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/17/2014140187394Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
12/22/2017123087729Open ↗
12/01/2017123087729Open ↗
05/08/2017123087729Open ↗
Showing 3 of 7 on file for this type
▸BISPLUMBING (PL) SIGNOFF1
11/18/2022122213826Open ↗
▸BISSCHEDULE B - PLUMBING1
07/08/2011120749912Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
04/17/2014140187394Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
11/14/2011120749912Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes3
05/01/2018123432767Open ↗
05/08/2017123087729Open ↗
04/20/2016122754215Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026M01298491-I1Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/29/2026M00901869-I1Open ↗
08/15/2026M01298491-S1Open ↗
08/14/2026M01298491-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
05/08/2017123087729Open ↗
11/06/2015122548788Open ↗
08/05/2015140381398Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/08/2011120749912Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
11/09/2018123087729Open ↗
11/09/2018123087729Open ↗
10/18/2018123087729Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
11/09/2018123087729Open ↗
10/18/2018123087729Open ↗
03/22/2017140381398Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/05/2015140381398Open ↗
08/05/2015140381398Open ↗
04/17/2014140187394Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/17/2014140187394Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/18/2022122213826Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY8
05/30/2024101387330Open ↗
11/01/2022102421620Open ↗
11/01/2022102421620Open ↗
Showing 3 of 8 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
11/08/2022102421620Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/18/2022122213826Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
11/21/2022122213826Open ↗
11/09/2022102421620Open ↗
11/09/2018123087729Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
07/08/2011120749912Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/22/2017140381398Open ↗
▸BISFINAL1
11/18/2022122213826Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT12
11/09/2018123087729Open ↗
10/18/2018123087729Open ↗
05/01/2018123432767Open ↗
Showing 3 of 12 on file for this type
▸BISWELDERS AFFIDAVIT1
11/18/2022122213826Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
11/18/2022122213826Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
08/29/2011120749912Open ↗
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION7
03/26/2018123087729Open ↗
12/22/2017123087729Open ↗
12/01/2017123087729Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET6
05/01/2018123432767Open ↗
05/08/2017123087729Open ↗
04/19/2016122754215Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM3
11/09/2018123087729Open ↗
10/18/2018123087729Open ↗
12/01/2017123087729Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
08/05/2015140381398Open ↗
04/17/2014140187394Open ↗
▸Other Documents5
▸BISDepartment of Consumer Affairs (DCA) Form1
12/17/2015122548788Open ↗
▸BISCHIMNEYS AND VENTS1
11/18/2022122213826Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01022455-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026M01298491-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01022455-I1Open ↗