← Back
Two family frame
221 FORBELL STREET
BROOKLYN · East New York-City Line · BIN 3094872
💬 Discuss this project
1930Year Built
2Stories
B2Building Class
R4Zoning
2,248 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family frame · 2,500 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
URENA CONSTRUCTION & DESIGN1007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RMM DESIGN STUDIO103/14/2025
ALPHA HOME DESIGN LLC211/29/2023
FANG ARCHITECT103/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EBC CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOLAR PRO INCGeneral Contractor303/21/2026
URENA CONST & DESIGN INCGeneral Contractor303/21/2026
VILLAGE ELECTL CONTRS INCElectrical103/22/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE9323103/14/2025
FANG ARCHITECT5513311/29/2023
Building Lifecycle
All (61)Filed (4)Permit Issued (3)Signed Off (3)Violation (9)Inspection (6)Objection (6)Special Inspection (30)
04/02/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXSISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
B01195595-I1
03/28/2025
Permit issued — Solar
B01195595-I1-SL
03/14/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXSISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
B01195595-I1
03/14/2025
Special inspection requirement — Air barrier - visual inspection
William Alicea
03/14/2025
Special inspection requirement — Final
RICHARD MUESCH JR.
03/14/2025
Special inspection requirement — Energy Code Compliance Inspections
William Alicea
03/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
03/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
12/13/2023
Signed off — Alteration
INTERIOR AND EXTERIOR RENOVATION FOR AN EXISTING FIRE-DAMAGED 2-FAMILY DWELLING. NO CHANGE TO EXIST. USE, EGRESS & OCCUPANCY.
B08052408-I1
12/12/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/07/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/30/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
11/30/2023
Special inspection requirement — Interior lighting power
DEZHANG FANG
11/30/2023
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
11/30/2023
Special inspection requirement — Fenestration areas
DEZHANG FANG
11/30/2023
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
11/30/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
DEZHANG FANG
11/30/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
DEZHANG FANG
11/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
11/30/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
11/30/2023
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
11/29/2023
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATION FOR AN EXISTING FIRE-DAMAGED 2-FAMILY DWELLING. NO CHANGE TO EXIST. USE, EGRESS & OCCUPANCY.
B08052408-P1
11/29/2023
Objection raised — Zoning
11/29/2023
Objection resolved — Addressed
11/29/2023
Objection raised — Other
11/29/2023
Objection resolved — Addressed
11/29/2023
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
11/29/2023
Special inspection requirement — Fenestration areas
DEZHANG FANG
11/29/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
11/29/2023
Special inspection requirement — Interior lighting power
DEZHANG FANG
11/29/2023
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
11/29/2023
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
11/29/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
11/29/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
DEZHANG FANG
11/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
11/29/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
DEZHANG FANG
11/03/2023
Signed off — Alteration
INTERIOR AND EXTERIOR RENOVATION FOR AN EXISTING FIRE-DAMAGED 2-FAMILY DWELLING. NO CHANGE TO EXIST. USE, EGRESS & OCCUPANCY.
B08052408-S1
10/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/01/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/01/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/01/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/14/2023
Permit issued — Plumbing
B08052408-S1-PL
03/28/2023
Permit issued — General Construction
B08052408-I1-GC
03/15/2023
Objection raised — Other
03/15/2023
Objection resolved — Addressed
03/13/2023
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATION FOR AN EXISTING FIRE-DAMAGED 2-FAMILY DWELLING. NO CHANGE TO EXIST. USE, EGRESS & OCCUPANCY.
B08052408-S1
03/09/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
03/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
03/09/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
03/09/2023
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
03/09/2023
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
12/09/2022
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATION FOR AN EXISTING FIRE-DAMAGED 2-FAMILY DWELLING. NO CHANGE TO EXIST. USE, EGRESS & OCCUPANCY.
B08052408-I1
09/03/2022
Violation issued (ECB, closed)
Quality of Life
09/03/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/03/2022
Violation issued (ECB, closed)
Construction
09/03/2022
Violation issued (ECB, closed)
Construction
09/03/2022
Violation issued (ECB, closed)
Quality of Life
09/03/2022
Violation issued (ECB, closed)
Quality of Life
09/03/2022
Violation issued (ECB, closed)
Quality of Life
09/16/2008
Violation issued (HPD, open)
C
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSOLAR PRO INC03/28/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR04/14/2023
DOB NOWGeneral ConstructionSigned-offURENA CONST & DESIGN INC03/28/2023
2 projects · most recent 03/21/2024
General Wiring
FiledStatusContractorScope
03/21/2024CompleteC.FALCO ELETL CONT CORPGeneral Wiring
10/26/2023CompleteVILLAGE ELECTL CONTRS INC—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/12/2023Pass-Final General Construction Non-Directive 14PassView ↗
12/07/2023Fail-Final General Construction Non-Directive 14FailView ↗
10/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/01/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/01/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
03/14/2025Air barrier - visual inspectionWilliam Aliceaenergy_progress
03/14/2025FinalRICHARD MUESCH JR.progress
03/14/2025Energy Code Compliance InspectionsWilliam Aliceaprogress
03/14/2025Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
03/14/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
11/30/2023Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
11/30/2023Interior lighting powerDEZHANG FANGenergy_progress
11/30/2023Insulation placement and R valuesDEZHANG FANGenergy_progress
11/30/2023Fenestration areasDEZHANG FANGenergy_progress
11/30/2023Fenestration air leakageDEZHANG FANGenergy_progress
11/30/2023Construction Operations Influencing Adjacent StructuresDEZHANG FANGspecial
11/30/2023Structural Stability – Alterations of existing buildingsDEZHANG FANGspecial
11/30/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
11/30/2023Energy Code Compliance InspectionsDEZHANG FANGprogress
11/30/2023Fire-Resistance Rated ConstructionDEZHANG FANGprogress
11/29/2023Fenestration air leakageDEZHANG FANGenergy_progress
11/29/2023Fenestration areasDEZHANG FANGenergy_progress
11/29/2023Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
11/29/2023Interior lighting powerDEZHANG FANGenergy_progress
11/29/2023Insulation placement and R valuesDEZHANG FANGenergy_progress
11/29/2023Fire-Resistance Rated ConstructionDEZHANG FANGprogress
11/29/2023Energy Code Compliance InspectionsDEZHANG FANGprogress
11/29/2023Structural Stability – Alterations of existing buildingsDEZHANG FANGspecial
11/29/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
11/29/2023Construction Operations Influencing Adjacent StructuresDEZHANG FANGspecial
Latest 25 of 31.
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/28/2026B08052408-I1Request digital key ↗
08/22/2026B01195595-I1Request digital key ↗
08/14/2026B08052408-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
08/21/2023340896971Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026B08052408-S1Open ↗
08/13/2026B08052408-I1Open ↗
08/13/2026B08052408-P1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature9
08/24/2026B08052408-P1Open ↗
08/24/2026B08052408-P1Open ↗
08/23/2026B01195595-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/28/2026B08052408-S1Open ↗
08/28/2026B08052408-P1Open ↗
08/28/2026B08052408-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/24/2026B08052408-P1Open ↗
08/23/2026B01195595-I1Open ↗
08/23/2026B08052408-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/21/2023340896971Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
10/18/2023340896971Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/28/2026B08052408-I1Open ↗
08/14/2026B08052408-S1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/13/2023340896971Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/22/2026B01195595-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/13/2023340896971Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
08/21/2023340896971Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
10/18/2023340896971Open ↗
10/18/2023340896971Open ↗
10/13/2023340896971Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01195595-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/21/2023340896971Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
10/13/2023340896971Open ↗
10/13/2023340896971Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/21/2023340896971Open ↗
▸Other Documents2
▸DOB NOWWaiver Document2
08/13/2026B08052408-I1Open ↗
08/13/2026B08052408-P1Open ↗