Two family brick
221 PENN STREET
BROOKLYN · South Williamsburg · BIN 3060686
💬 Discuss this project
1901Year Built
3Stories
B1Building Class
R6Zoning
4,640 sfGross Floor Area
2Units
Two family brick · Owner of record: 221 PENN ST. LLC · 2,100 sf lot · 2.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof18p · 1 filing · 20 docs
Floor 432p · 1 filing · 20 docs
Floor 332p · 1 filing · 20 docs
Floor 232p · 1 filing · 20 docs
Floor 132p · 1 filing · 20 docs
Cellar36p · 1 filing · 20 docs
Site & exterior40p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
221 PENN ST3507/08/2026
OWNERS REP607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/05/2022$1.4M—— → —$295/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AVALON DESIGNS2003/21/2026
221 PENN ST403/21/2026
THE GREEN STUDIO103/21/2026
MILLENNIUM DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CREATIVE BUILDERS& DEVEL*General Contractor907/08/2026
GWT ENTERPRISES INCGeneral Contractor407/08/2026
TRUE POWER ELECL CONT LLCElectrical103/22/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
MPI PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616912/04/2025
Building Lifecycle
All (117)Filed (13)Permit Issued (9)Signed Off (8)Inspection (13)Objection (44)Special Inspection (30)
02/25/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
New split system for heating and cooling and new ventilation systems.
B00875113-I1
02/14/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
New split system for heating and cooling and new ventilation systems.
B00875113-S3
01/26/2026
Objection resolved — Addressed
01/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
01/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
01/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
01/26/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
01/26/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
01/26/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
FAHAD FATEH
01/26/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/22/2025
Objection raised — Other
12/04/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
New split system for heating and cooling and new ventilation systems.
B00875113-P5
12/02/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
FAHAD FATEH
12/02/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
12/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
12/02/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
12/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
12/02/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
11/20/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
New split system for heating and cooling and new ventilation systems.
B00875113-S4
11/10/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
New split system for heating and cooling and new ventilation systems.
B00875113-S2
11/07/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
New split system for heating and cooling and new ventilation systems.
B00875113-S6
10/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/29/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/29/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/27/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
New split system for heating and cooling and new ventilation systems.
B00875113-S5
10/27/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/23/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
New split system for heating and cooling and new ventilation systems.
B00875113-S1
10/22/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
New split system for heating and cooling and new ventilation systems.
B00875113-P4
09/16/2025
Objection resolved — Addressed
09/12/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/10/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/10/2025
Objection raised — Other
09/10/2025
Objection raised — Other
09/10/2025
Objection resolved — Addressed
08/26/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
New split system for heating and cooling and new ventilation systems.
B00875113-P3
08/21/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
08/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
08/21/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
08/21/2025
Special inspection requirement — Subgrade Inspections
08/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/21/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
08/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
08/21/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
08/21/2025
Special inspection requirement — Metering
FAHAD FATEH
08/21/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/21/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
08/21/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
08/21/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
08/21/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
08/13/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/13/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/13/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/23/2025
Permit issued — Support of Excavation
B00875113-S5-SE
07/23/2025
Permit issued — Mechanical Systems
B00875113-S2-MS
07/23/2025
Permit issued — Foundation
B00875113-S4-GC-CX
Latest 60 of 117 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationSigned-offCREATIVE BUILDERS& DEVEL*07/23/2025
DOB NOWMechanical SystemsSigned-offCREATIVE BUILDERS& DEVEL*07/23/2025
DOB NOWFoundationSigned-offCREATIVE BUILDERS& DEVEL*07/23/2025
DOB NOWGeneral ConstructionPermit IssuedCREATIVE BUILDERS& DEVEL*07/10/2025
DOB NOWSprinklersSigned-offA M B MECHANICAL INC02/26/2025
DOB NOWPlumbingSigned-offYG SERVICES INC02/21/2025
DOB NOWConstruction FenceSigned-offCREATIVE BUILDERS& DEVEL*08/08/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC08/01/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC08/01/2024
1 project · most recent 12/04/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
12/04/2025Signed-offCREATIVE BUILDERS& DEVEL*Air Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric MXZ-SM60NAM2 60,000 BTU · Heat Pump Outdoor ×3
MXZ-SM48NAM2 48,000 BTU · Heat Pump Outdoor ×1
Heating
Mitsubishi Electric MXZ-SM60NAM2 66,000 BTU · Heat Pump Outdoor ×3
MXZ-SM48NAM2 54,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 12/04/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/04/2025Signed-offMPI PLUMBING CORPGas, Storm, Water/Sanitary
3 projects · most recent 06/09/2025
General Wiring
FiledStatusContractorScope
06/09/2025CompleteNATIONAL POWER ELECTRIC LGeneral Wiring
02/05/2025CompleteTRUE POWER ELECL CONT LLCGeneral Wiring
08/07/2024CompleteSOLAS ELECTRICAL CORP—
1 project · most recent 12/04/2025
Steel
FiledStatusContractorScope
12/04/2025Signed-offCREATIVE BUILDERS& DEVEL*Steel
1 project · most recent 12/04/2025
Fence
FiledStatusContractorScope
12/04/2025Signed-offCREATIVE BUILDERS& DEVEL*Fence
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
10/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/29/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/27/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/12/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/13/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/13/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/13/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/28/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/17/2025Fail-Final PL - Up to 9 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 83
DateRequirementInspectorRole
01/26/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/26/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
01/26/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
01/26/2026HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
01/26/2026Maintenance informationFAHAD FATEHenergy_progress
01/26/2026HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
01/26/2026HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
01/26/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesFAHAD FATEHspecial
12/02/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
12/02/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesFAHAD FATEHspecial
12/02/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
12/02/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
12/02/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
12/02/2025Maintenance informationFAHAD FATEHenergy_progress
12/02/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
12/02/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/21/2025Maintenance informationFAHAD FATEHenergy_progress
08/21/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
08/21/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
08/21/2025Fenestration areasFAHAD FATEHenergy_progress
08/21/2025Air barrier — testing FAHAD FATEHenergy_progress
08/21/2025Lighting controlsFAHAD FATEHenergy_progress
08/21/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
08/21/2025Protection of exposed foundation insulationFAHAD FATEHenergy_progress
08/21/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
Latest 25 of 83.
▾Documents — 105 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/24/2026B01089318-I1Request digital key ↗
08/23/2026B00875113-P4Request digital key ↗
08/23/2026B00875113-S6Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION1
07/25/2023340891958Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
11/17/2025340891958Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
07/25/2023340891958Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/23/2026B00875113-P4Open ↗
08/14/2026B00875113-I1Open ↗
08/14/2026B00875113-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/23/2026B00875113-P4Open ↗
08/14/2026B00875113-I1Open ↗
08/14/2026B00875113-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026B00875113-I1Open ↗
▸Seals & Professional Certifications32
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/24/2026B01089318-I1Open ↗
08/23/2026B00875113-P5Open ↗
08/23/2026B00875113-P4Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026B00875113-S3Open ↗
09/01/2026B00875113-S3Open ↗
08/28/2026B00875113-P5Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026B00875113-S6Open ↗
09/01/2026B00875113-S3Open ↗
08/28/2026B00875113-P5Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/25/2023340891958Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/25/2023340891958Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/23/2026B00875113-P4Open ↗
08/14/2026B00875113-I1Open ↗
08/14/2026B00875113-P2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/23/2026B00875113-S4Open ↗
08/14/2026B00875113-I1Open ↗
▸DOB NOWStreet Tree Sign Off2
08/23/2026B00875113-S4Open ↗
08/14/2026B00875113-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/25/2023340891958Open ↗
▸DOB NOWStreet Trees Site Plan1
08/14/2026B00875113-I1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/23/2026B00875113-P4Open ↗
08/23/2026B00875113-S6Open ↗
08/23/2026B00875113-S4Open ↗
Showing 3 of 11 on file for this type
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/23/2026B00875113-S4Open ↗
▸DOB NOWSOIL REPORT1
08/23/2026B00875113-S4Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
11/17/2025340891958Open ↗
▸BISBPP - Forwarding Letter to DEP1
07/31/2023340891958Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/25/2023340891958Open ↗
▸Other Documents22
▸BISBPP - SUPPORTING DOCUMENTATION6
11/24/2025340891958Open ↗
11/17/2025340891958Open ↗
11/17/2025340891958Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial5
08/23/2026B00875113-P4Open ↗
08/23/2026B00875113-S4Open ↗
08/14/2026B00875113-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/23/2026B00875113-P4Open ↗
08/23/2026B00875113-S4Open ↗
08/14/2026B00875113-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification4
08/23/2026B00875113-P4Open ↗
08/14/2026B00875113-I1Open ↗
08/14/2026B00875113-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/14/2026B00875113-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/15/2026B00875113-S5Open ↗